ECSS Commercial EEE Components -- Class 2 Parts Approval (space-systems/ecss/q6013-class-2-parts-approval)
Use when the task is the clause 5.2.4 approval question of ECSS-Q-ST-60-13C at the intermediate assurance class: a commercial electrical, electronic and electromechanical part is proposed for a build, and the question is which authority has to approve it and whether the justification recorded behind that approval is the one the class asks for.
Domain quick reference
- Approval at this class is a route, not a signature. The route ladder runs from the delegated project component engineer, through the parts control board, to a board decision the customer has agreed. A part with nothing unusual about it sits at the bottom of that ladder, and every declared escalation driver raises the floor.
- The drivers are properties of the buy, not opinions about it: no approved equivalent already on the project, supply from outside the franchised network, use beyond the published temperature range, no published radiation data, a single-point-failure function, obsolescence at the order date. The required route is the highest any one driver demands, so adding a second board-level driver changes nothing while adding one customer-level driver changes everything.
- Approving above the required route is not a defect. It costs review time and is recorded as an observation; approving below it is the finding, because the authority that carries the residual risk never saw the part.
- The justification is what the approval is later defended with. It has to state the need, the alternatives examined, the residual risk, the compensating measures applied, and the scope the approval is valid over. Each of those is required; the record is judged on whether it treats them.
- This class allows an element to be carried by a referenced document rather than restated, but only where the pointer names a document and an issue, and the credited weight stays below one. Without that credit a file assembled entirely out of pointers scores the same as one that argues its own case.
- An element named with no rationale behind it is untreated for this purpose. That is the common way an approval file reads complete and decides nothing: the headings match the required list while every section is a title.
- The weighted completeness runs over the full required element list, so deleting a weak element can only lower the figure, which is the way round it has to be. A figure landing exactly on its floor is admissible, the comparison tolerance being there to absorb representation error rather than to widen the floor.
- An approval carries a validity period. An approval older than its validity has lapsed: the supply, the lot and the obsolescence position have all moved since the decision, and the file no longer describes the part being bought.
- Position decides whether the approval controlled anything. An approval recorded after the first procurement commitment documents a choice already made, and no amount of justification recovers the lots bought against no decision.
Workflow
- Validate the grading policy: the covered share floor, the weighted completeness floor, the credit a referenced element earns and the marginal band. A completeness floor above the covered floor, a credit of nothing or of one, or a band wider than the floor is refused rather than used.
- Validate the approval record: a non-blank reference and issue, an approver drawn from the permitted authorities, a recognised declared route, the approval and first-commitment positions, the validity period and the age. An absent record closes the assessment on approval not established.
- Build the required route from the declared escalation drivers, rejecting an unrecognised or repeated driver, and name the drivers that raised it.
- Compare the declared route with the required one. Below it is a finding naming both; above it is an advisory.
- Dispose every required justification element as written, carried by an identified referenced document, stated without a rationale, or absent, and report the absent and heading-only lists in full rather than truncating at the first entry.
- Take the covered share and the weighted completeness over the full required list and compare both with their floors under a named tolerance.
- Check the age against the validity, and the approval position against the first procurement commitment.
- Close on one verdict: approval not established, approval route below the required level, approval lapsed, approval recorded after the procurement commitment, justification record short of the required content, or part approved for class 2 use.
Pitfalls
- Grading the approval on who signed it. A senior signature on the wrong route still leaves the authority that carries the residual risk unaware of the part; the route is the check, the signature is the evidence of it.
- Counting drivers instead of ranking them. Three board-level drivers still demand the board route, while one customer-level driver on its own demands the customer-agreed route, so the ladder is a maximum and never a tally.
- Accepting a pointer that names a document but no issue. The justification then changes whenever the other document is reissued, and the approval made last quarter cannot be shown to have been made against anything.
- Crediting a referenced element in full. Reference is permitted here and it is a thinner treatment than arguing the case, which is what the credit records.
- Averaging depth only over the elements that exist. Deleting a weak element would then raise the score, which is exactly backwards, so the denominator stays the full required element list.
- Reading a met floor as a closed file. The floor is an aggregate; a single absent residual-risk statement can sit under a comfortable figure and still be the reason the approval cannot be defended.
- Letting an approval outlive its validity because the part number has not changed. The lot, the source and the obsolescence position move underneath a stable part number, which is what the validity period exists to catch.
- Recording the approval after the first order is placed. The decision then describes a purchase already made, and the parts bought against no decision stay in the build.
Behavior contract (gate 3)
The policy validation, approval-record validation, route ladder and driver escalation, citation validation, the written, referenced, heading-only and absent dispositions, the covered share, the weighted completeness, the validity state, the commitment-position check, the marginal advisories and the approval verdict are exercised by the gate 3 contract test: scripts/test_q6013_class_2_parts_approval.py against scripts/q6013_class_2_parts_approval_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q6013_class_2_parts_approval.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.