ECSS Commercial EEE Components -- Class 3 Relifing (space-systems/ecss/q6013-class-3-relifing)
Use when the task is the clause 6.3.10 storage question of ECSS-Q-ST-60-13C at the lowest assurance class: parts bought for a build have sat in store while the build slipped, the period the lot earned when it was accepted has run out, and the question is whether the usable life of those parts can be renewed and on what evidence.
Domain quick reference
- An expired lot is neither scrap nor usable. Relifing is the operation that decides which, and it is an operation with an outcome rather than a stamp applied to keep the build moving.
- The period a lot earned depends on where it actually sat, not on where the procurement paperwork said it would sit. The package family sets a baseline and the graded store scales it, so the same lot earns a long period in dry nitrogen and a fraction of it on an open shelf.
- This class differs from the ones above in the store it will still credit. An uncontrolled store earns a short period here instead of nothing, and the relaxation is paid for rather than given: the same store reopens moisture preconditioning and electrical re-verification, which a graded store does not owe at this class.
- The evidence is taken on a sample, not on the lot. The plan is sized from the lot itself and held between a floor and a ceiling, so a small lot is inspected almost entirely and a reel of ten thousand is not. A record covering fewer units than the plan calls for has not run the plan.
- The sample is judged against an acceptance number, and the default acceptance number is zero. One defective unit in the sample is a failed test, not a percentage to be argued about.
- Re-tinning is repeatable here where the class above grants it once, but it is repeatable up to a declared ceiling. A lot that has used its re-tins and fails solderability again is telling you about the terminations, not about the tinning.
- What ends the sequence at this class is a cumulative cap on relifed months -- a multiple of the period the lot originally earned -- rather than a count of cycles. Each cycle grants a flat share of the earned period, trimmed to whatever headroom is left, and once the trimmed grant falls under the minimum useful extension the lot goes for re-screening.
- A lot sitting exactly on its permitted period is inside it. The scaling can leave the two sides a few ULP apart, which is representation error rather than an expired lot, and the comparison absorbs it instead of the period being padded.
Workflow
- Validate the relifing policy: the flat extension fraction, the minimum useful extension, the cumulative life multiple, the re-tin ceiling and the attribute sample bounds with their acceptance number. A fraction above unity, a non-positive multiple or a sample ceiling below its floor is refused rather than used.
- Grade the store and resolve the package family, refusing an unregistered store or family rather than assuming a period that was never earned, and scale the baseline into the period the lot earned.
- Test elapsed storage against that period. A lot inside its period is reported as still in date and nothing further is done to it.
- Test the cumulative relifed months against the life cap before any evidence is considered. A lot with no headroom left is a re-screening case whatever the sample says.
- Size the attribute sample from the lot, assemble the test set the lot owes, and refuse a record that covers fewer units than the plan or that is missing an owed test. Report every missing test by name.
- Judge each owed test against the acceptance number, and apply the repeatable re-tinning allowance to a lone solderability failure while re-tins remain. Every other failure, or solderability alongside another, closes on the failure.
- Compute the flat grant, trim it to the cap headroom, compare it against the minimum useful extension, and return the renewed period with the findings that produced it.
Pitfalls
- Reading the storage period off the package family alone. The family sets the baseline; the store the parts actually sat in is what scales it, and the two are routinely different from the procurement plan.
- Reading the credit an uncontrolled store earns here as a general relaxation. It buys a short period and it costs two extra tests, so a lot relifed out of an uncontrolled store on the graded test set has been relifed on the wrong evidence.
- Inspecting whatever units came to hand. The plan is sized from the lot, and a record covering eight units where the plan calls for ten is short of the plan rather than close to it.
- Reading a missing test as a pass. An owed test absent from the record is the most common way a relifing record reads complete, and it is reported by name rather than inferred.
- Re-tinning a lot that has used its re-tins, or one carrying a second failure. The allowance exists for a storage-induced surface condition standing on its own; used twice over it is covering for terminations that are no longer recoverable.
- Granting the flat share without looking at the cap. The trim is the mechanism that ends the sequence, and an untrimmed grant relifes a lot past the total life it was ever entitled to.
Behavior contract (gate 3)
The policy validation, the store grading and family lookup, the earned storage period and its boundary, the cumulative life cap, the attribute sample plan, the assembled test set including the tests an uncontrolled store reopens, the sample record validation and missing-test report, the acceptance number, the repeatable re-tinning allowance and its ceiling, the flat grant trimmed to the cap headroom, the minimum useful extension and the relifing verdict are exercised by the gate 3 contract test: scripts/test_q6013_class_3_relifing.py against scripts/q6013_class_3_relifing_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q6013_class_3_relifing.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.