ECSS Cleanliness Control — Storage and Packaging (space-systems/ecss/q7001-storage-and-packaging)
Use when the task is putting cleaned hardware away and keeping it at the level it was cleaned to — the barrier configuration, the purge, the store it sits in, and the date on which the package has to be opened and the level demonstrated again.
Domain quick reference
- Packaging is a barrier count, not a bag. The layer against the hardware is the one that matters, and it is also the one that gets handled every time the item is moved, so a sensitivity demanding three layers is not satisfied by one good bag inside a crate.
- Materials are qualified for contact, not for convenience. Plasticised films, untreated foams, board and sulphur-cured elastomers transfer onto the surface they were bought to protect, and they do it slowly enough that nobody later connects the residue to the packaging that caused it.
- Cleanliness degrades in store. Residue accumulates inside a sealed bag at a slow, roughly linear rate over the intervals hardware actually waits, so the level at the end of storage is projected rather than assumed equal to the level at packing.
- A purge is a consumable, not a state. Positive pressure decays through the seam and through the film, and the day it reaches its floor is the day the bag stops being a barrier and becomes a cover.
- The re-verification interval is the earliest of the residue projection, the purge hold and the programme policy ceiling. Naming which one bound it is the whole output: it says whether the answer is to re-bag, to re-purge, or to go and argue with the policy.
- The store is graded as well as the package. An item bagged to a level it cannot be unbagged into has to travel somewhere else to be opened, and that is discovered on the day somebody urgently needs the item.
- An item already at or past its limit cannot be stored at all. Putting it away is not a neutral act; it consumes the interval and the problem resurfaces later with less time to fix it.
Workflow
- Validate the item: sensitivity, residue limit, level at packing, the accumulation rate in store, and whether it is humidity sensitive or purge dependent.
- Grade the packaging: barrier layers against the minimum the sensitivity demands, and every contact material against the refused list, naming what is refused.
- Demand desiccant where the item is humidity sensitive, and a declared purge state — sealing pressure, floor and decay rate — where a purge is required.
- Project the residue level across the planned storage and compare it with the requirement.
- Compute the days until the residue projection reaches the limit, and refuse outright an item already past it.
- Compute the days the purge holds before it reaches its floor, treating a non-leaking bag as unbounded rather than as zero.
- Take the earliest of residue, purge and policy as the re-verification interval, report which limit bound it, and flag a planned storage longer than that interval.
- Compare the store's class with the class the item needs to be unbagged into, and report the verdict with every finding.
Pitfalls
- Counting the shipping container as a barrier layer. It protects against forklifts, and the layer against the hardware is still one bag deep.
- Choosing packaging film on availability. The refused materials are the ones that look most like the permitted ones on the shelf, and the transfer they cause is found months later as an unexplained residue.
- Treating the level at packing as the level in store. A slow accumulation rate over an eighteen-month wait consumes more of the budget than the cleaning recovered.
- Recording a purge as done rather than as a pressure with a decay rate. "Purged with dry nitrogen" is not a state that can be projected forward to a date.
- Reporting an interval without saying what bound it. Re-bagging an item whose interval was set by the policy ceiling changes nothing, and the effort is spent again at the next review.
- Storing an item in a hall it cannot be opened in. The package is perfect and the item is unusable without a transport that was never planned.
Behavior contract (gate 3)
Barrier-layer minima, refused contact materials, the desiccant and purge-state demands, the linear residue projection and its already-past-the-limit refusal, the purge hold with its unbounded and at-the-floor cases, the earliest-limit interval with its binding reason, and the store-class check are exercised by the gate 3 contract test: scripts/test_q7001_storage_and_packaging.py against scripts/q7001_storage_and_packaging_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q7001_storage_and_packaging.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.