Deploy to Production
Production deployment with mandatory approval gates, verification, and rollback plan. Every step that mutates production requires explicit user APPROVE.
⚠️ SAFETY: No production mutation runs without explicit user APPROVE. This is a stricter gate than /deploy-staging — production deploys require BOTH the standard "APPROVE" confirmation AND a separate explicit acknowledgment of the rollback plan from Step 5.
0. Gather Context
Read CLAUDE.md (or AGENTS.md) at the project root to identify:
- Cloud platform (GCP, Azure, AWS) — apply
cloud-platformsskill for platform-specific commands - Deployment method (Kubernetes, Helm, Docker Compose, serverless)
- Production environment configuration (namespace, cluster, region)
- CI/CD pipeline (GitHub Actions, GitLab CI, Jenkins)
This determines which deployment commands and health checks apply.
0a. Detect GitOps / progressive-delivery controller — route first
Before running helm upgrade / kubectl apply directly against production, check whether a controller owns the apply step.
| Marker | System | What this means for production deploys |
|---|---|---|
Application / ApplicationSet CRDs in Git |
Argo CD | Production manifest changes flow through git PR → Argo CD reconciles. Manual helm upgrade will be reverted on next sync. Use argocd app sync <name> only for intentional out-of-band promotion. |
Flux HelmRelease / Kustomization CRDs |
Flux | Same model as Argo CD. Manual override via flux reconcile helmrelease <name>. |
Rollout CRDs (argoproj.io/v1alpha1) |
Argo Rollouts | Progressive delivery — promotion via kubectl argo rollouts promote <name> or automatic per AnalysisTemplate. Replaces manual canary monitoring (Step 3c). |
Canary CRDs (flagger.app/v1beta1) |
Flagger | Same — promotion driven by Prometheus / Datadog metrics analyzer. |
If a controller is detected: skip imperative helm upgrade / kubectl apply in Step 3; promote via the controller. The 5–10 minute monitoring window in Step 4 is replaced by the controller's analyzer-based promotion (which is the modern best practice — automated SLO-based promotion gates the rollout, not a static wall-clock window).
0b. Detect feature-flag platform
If the codebase imports a feature-flag SDK, prefer decoupled deploy: ship code dark, then flip the flag separately, ramp, observe.
| Marker | Platform | Approach |
|---|---|---|
import { Client } from '@launchdarkly/...' / LaunchDarkly SDK |
LaunchDarkly | Deploy with flag default OFF. Flip flag in LD UI after deploy passes smoke. Rollback = flip flag, no redeploy needed for the new code path. |
unleash-client / @unleash/... |
Unleash | Same pattern via Unleash UI. |
@openfeature/... |
OpenFeature (vendor-neutral) | Same pattern via the underlying provider (LD/Unleash/Flagsmith/Split). |
flagsmith / splitsoftware SDKs |
Flagsmith / Split.io | Same pattern. |
Decoupled deploy fundamentally changes Step 3: the deploy itself is low-risk because the new code path is gated. The risk shifts to the flag flip, which is reversible in seconds.
0c. Change-window / freeze check
If the project has a documented change-freeze policy (e.g., end-of-quarter freeze, major-event blackout), verify the current date is OUTSIDE the freeze window. Hard stop if inside; require documented exception.
1. Pre-Deployment Checklist
1a. Staging Verification
Confirm that staging deployment was successful:
-
/deploy-stagingcompleted successfully - QA testing passed on staging
- No critical bugs found in staging
- Performance acceptable on staging
If staging was not verified — STOP. Run /deploy-staging first.
1b. Release Readiness
- Version tagged (
/releasecompleted) - Changelog updated
- All tests pass on the release branch
- Database migrations tested (forward and rollback)
- Feature flags configured (if applicable)
- Monitoring dashboards ready
- On-call team notified
1c. Risk Assessment
| Factor | Assessment |
|---|---|
| Breaking changes | Yes/No — migration guide ready? |
| Database migrations | Yes/No — reversible? |
| Infrastructure changes | Yes/No — /infra-change completed? |
| Third-party dependencies | Yes/No — API compatibility verified? |
| Traffic impact | Low/Medium/High |
| Rollback complexity | Simple (revert image) / Complex (DB migration) |
If Risk = HIGH, apply Agent(sre-engineer) for SLO impact assessment.
2. Prepare Deployment
2a. Identify Deployment Method
Same as /deploy-staging Step 1c — but with production configuration.
2b. Backup Current State
# Record current deployment state for rollback
kubectl get deployment -n production -o yaml > pre-deploy-state.yaml
Or for Helm:
helm get values <release> -n production > pre-deploy-values.yaml
helm history <release> -n production
2c. Deployment Plan
Present the deployment plan:
## Production Deployment Plan
- **Version**: [current] → [new]
- **Method**: [K8s/Helm/Docker/Platform]
- **Migrations**: [list if any]
- **Config changes**: [list if any]
- **Expected downtime**: [none / X minutes]
- **Rollback plan**: [documented in Step 5]
- **Monitoring**: [dashboards to watch]
⚠️ STOP. Request APPROVE before proceeding to Step 3. Production deploys require explicit acknowledgment of the rollback plan in addition to the deployment plan — confirm both with the user.
3. Deploy — REQUIRES EXPLICIT APPROVE
Only after the user explicitly approves:
3a. Run Migrations (if applicable)
# Database migration
<migration-command>
Verify migration completed successfully before proceeding.
3b. Deploy Application
Kubernetes / Helm:
helm upgrade --install <release> <chart> \
-n production \
-f values-production.yaml \
--set image.tag=<tag>
Rolling update strategy — monitor pod rollout:
kubectl rollout status deployment/<name> -n production --timeout=300s
3c. Canary (if applicable)
If using canary deployment:
- Deploy to canary (small % of traffic)
- Monitor error rates and latency for 5–10 minutes
- If metrics are healthy → proceed to full rollout
- If degradation detected → rollback canary immediately
4. Post-Deployment Verification
4a. Health Check
// turbo
kubectl get pods -n production -o wide
curl -s <production-url>/health
4b. Smoke Tests
Run the project's existing smoke suite — do NOT improvise from generic checklists. Detect and execute (in priority order):
| Marker | Run command |
|---|---|
tests/smoke/ directory + pytest/vitest/etc. |
Project test runner against that path |
e2e/ or tests/e2e/ with Playwright config (playwright.config.ts) |
npx playwright test --grep @smoke (filter by @smoke annotation) |
cypress/e2e/smoke/* |
npx cypress run --spec 'cypress/e2e/smoke/**' |
| Postman / Newman collection | npx newman run smoke.postman_collection.json |
| K6 / Artillery script | run against the prod URL with a low-rate profile |
Fallback when no smoke suite exists (write down for follow-up — every project should ship one):
- Application responds on production URL (HTTP 200)
- Health endpoint returns 200
- Authentication flow works (login + session retrieval)
- Core API endpoints respond correctly (3-5 representative routes)
- One key user journey end-to-end
4c. Monitor (5–10 minutes)
Watch for:
- Error rate: Should not increase vs pre-deploy baseline
- Latency: P50, P95, P99 within SLO targets
- CPU/Memory: No unusual spikes
- Logs: No new error patterns
// turbo
kubectl logs -n production -l app=<app-name> --tail=100 --since=5m
// turbo
kubectl get events -n production --sort-by='.lastTimestamp' --field-selector type!=Normal
5. Rollback Plan
If issues detected — execute rollback immediately:
Helm:
helm rollback <release> <previous-revision> -n production
Kubernetes:
kubectl rollout undo deployment/<name> -n production
Database migration rollback:
<rollback-migration-command>
After rollback:
- Verify application is healthy
- Notify team of rollback
- Create incident ticket for investigation
6. Memory Write (L4)
Append a deploy event to .ai-skills-memory/runs.jsonl per memory-discipline.md retention rules. Production deploys are long-retention events:
{"ts": "<ISO8601>", "event": "deploy", "env": "production", "service": "<name>", "version_from": "<old>", "version_to": "<new>", "method": "k8s|helm|docker|platform", "status": "success|fail|rolled_back", "duration_ms": N, "rollback": <bool>, "approved_by": "<user>"}
7. Summary
## Production Deployment Summary
- **Version**: [old] → [new]
- **Deployed at**: [timestamp]
- **Method**: [K8s/Helm/Docker/Platform]
- **Migrations**: [applied/N/A]
- **Health check**: [pass/fail]
- **Smoke tests**: [pass/fail]
- **Monitoring**: [stable/issues detected]
- **Rollback**: [not needed / executed at timestamp]
- **Production URL**: [url]
- **Next steps**: [monitoring period, team notification, release announcement]
Integration
- Preceded by:
/deploy-staging(staging verification),/release(version tag) - Roles:
Agent(devops-engineer),Agent(sre-engineer),Agent(devops-architect)(deployment strategy design) - Skills:
deployment-proceduresskill - Memory writes: L4
runs.jsonl(deploy event per Step 6)