Fjsp Baseline Repair With Downtime And Policy

This skill should be considered when you need to repair an infeasible or non-optimal flexible job scheduling planning schedule into a downtime-feasible, precedence-feasible one while keep no worse policy budget.

bishal-pdMSFT Updated 0 repo stars

File contents

FJSP baseline repair with downtime and policy

This skill repairs non-optimal or infeasible flexible job-shop schedules into downtime-feasible, precedence-feasible ones while staying within policy budgets.

How to use

The authoritative workflow — pipeline steps, reference code, scoring, and the required preflight — lives in WORKFLOW.pdf in this same directory. Open WORKFLOW.pdf and follow it end to end before producing any schedule. The pipeline cannot be reconstructed from this file alone; WORKFLOW.pdf is the source of truth.

Scope

Inputs: baseline schedule, FJSP instance, downtime windows, policy budgets. Output: a repaired schedule with smaller makespan and no worse policy budgets.