Read ../_house-style/house-style.md before starting.
Evidence boundary
Git is one delivery artifact, not the source of truth about effort, performance, intent, or wellbeing. Pull-request, issue, CI, incident, and deployment claims require those systems; do not infer them from commits.
Do not:
- rank people by commits, LOC, test ratio, active days, or timestamps
- infer burnout, productivity, availability, or motivation
- turn individual attribution into performance evaluation
- expose personal data, credentials, customer payloads, or sensitive internal identifiers
Use names only when the user explicitly requests legitimate attribution and the source supports it. Default to roles, workflow stages, and system conditions.
Data collection
For the requested range, collect only accessible, relevant artifacts:
- shipped changes and affected product/system areas
- change size and hotspots, without treating size as value
- review and merge latency from forge data when available
- CI failures, reverts, incident links, and deployment outcomes
- unresolved or repeatedly reopened work
- concentration risk in components, review queues, or ownership
Label each datum Measured, Source-backed, Inferred, or Unavailable. Do not fill missing forge or planning data from git guesses.
Analysis
1. Delivery outcomes
What reached users or operations? Separate merged, deployed, released, and merely committed work.
2. Flow constraints
Where did work wait, loop, fail, or require manual recovery? Name the evidence and system condition. Do not call a person a bottleneck without corroborating workflow evidence and relevant context.
3. Quality signals
Examine reverts, recurring CI failures, incident links, missing proof on high-risk changes, and hotspot concentration. State what the artifacts cannot prove.
4. Control and ownership gaps
Identify unclear review ownership, missing automated gates, fragile single-owner components, and shadow processes. Recommend a role or control, not a personal judgment.
Output format
Period summary
What shipped and what did not, with evidence classes.
Outcomes worth preserving
Up to three specific delivery or control outcomes and why they mattered.
System constraints
Up to three evidence-backed flow, quality, or ownership problems. Use the shared finding contract.
Hotspots and concentration risk
Components, queues, or review surfaces with repeated change or unresolved ownership. Do not equate LOC with value.
Three changes
Dependency-ordered actions. Name the responsible role if known and the verification condition. Do not invent a person or deadline.
Devil's advocate
What planning, coordination, support, or external context could change the strongest conclusion?
What I didn't verify
Missing planning context, inaccessible forge/CI/deploy data, unobserved work, and the evidence needed to close each gap.