ASPLOS Workflow
An ASPLOS campaign is a pipeline with two entry gates per edition and a revision
side-channel, not a single deadline sprint. All dates below are the verified 2027
cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before
committing a team to any of them.
The 2027 cycle as a calendar
| Gate |
April cycle |
September cycle |
| Full-paper deadline (11:59 PM AoE) |
April 15, 2026 — passed |
September 9, 2026 — the live gate |
| Author response |
July 6-9, 2026 — open this week (as of 2026-07-08) |
December 1-4, 2026 |
| Notification |
July 27, 2026 |
December 21, 2026 |
| Major Revision due |
camera-ready deadline, 6 weeks after notification |
camera-ready deadline, 6 weeks after notification |
| Conference |
April 11-15, 2027, Heraklion, Crete, Greece |
same |
There is no separate abstract deadline in 2027, and no mid-year third round — the
edition moved from three deadlines to two. Missing September means waiting for the
next edition's first gate.
Working backward from September 9, 2026
A credible countdown for a systems paper with hardware-dependent evidence:
T-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection;
choose evidence instruments (silicon / FPGA / simulator).
T-8 weeks Evaluation infrastructure done: baselines building,
workloads chosen, simulator configs pinned.
T-6 weeks First full results sweep; kill or descope claims the
data will not carry. Start the two-page draft NOW —
it is the part rapid review actually reads.
T-4 weeks Full draft; internal red-team against the rapid-review
question set; ablations running.
T-2 weeks Freeze experiments. Citation-format pass (full names,
no "et al.", DOIs). Anonymity sweep.
T-1 week HotCRP entry created; PDF uploaded; co-author sign-off.
T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.
Role assignments that prevent known failures
- Two-page owner — one author owns pages 1-2 as a standalone artifact and
rehearses them against
asplos-writing-style; rapid review reads nothing else.
- Evidence-integrity owner — keeps the experiment matrix (claims × platforms ×
baselines) current so the rebuttal window never requires new runs under pressure.
- Compliance owner — template, 11-page geometry, citation full-name rule, GenAI
disclosure, HotCRP fields; format violations risk rejection without review.
- Response owner — reserves the response window dates (Dec 1-4 for the September
cycle) on every author's calendar at submission time, not after reviews arrive.
Branch planning at notification (December 21, 2026)
- Accept → switch to
asplos-camera-ready immediately; camera-ready lands
~6 weeks out, and artifact evaluation (asplos-artifact-evaluation) runs in
parallel with its own appendix and deadlines (2027 AE calendar 待核实).
- Major Revision → treat as a funded contract, not a consolation: the revision
is due at the camera-ready deadline and counts as a submission; scope revision
work to exactly what the decision letter requires, tracked in a change log that
will become the resubmission note.
- Reject at rapid review → the diagnosis is almost always positioning: the
first two pages did not establish the intersection or the evidence. Fix framing
before considering a new venue.
- Reject after full review → mine the reviews for the evidence matrix, then
re-run
asplos-topic-selection; some full-review rejects are strong ISCA, SOSP,
or PLDI papers mis-aimed at the intersection.
Cross-edition cautions
- The two-deadline structure is itself new for 2027; do not assume it for 2028.
- ASPLOS logistics genuinely change year to year — the 2025 edition (30th, Rotterdam)
ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in
Crete. Travel, visa, and registration planning must restart per edition (fees and
attendance rules for 2027: 待核实).
- Program leadership rotates every edition; there is no standing editorial memory to
appeal to. A policy answer from a previous year's chairs is expired.
Hardware lead times are schedule items
Systems evidence has procurement physics that a paper calendar must absorb:
- Cluster or testbed reservations for the T-8 to T-2 sweep window book out weeks
ahead; reserve at claim-freeze time, not first-results time.
- FPGA synthesis iterations and simulator calibration runs are days-long serial
steps — one redesign late in the countdown costs a week, not an evening.
- Access to pre-production parts (new memory devices, engineering samples) often
comes with NDA review of the paper text; start that review before T-4 or it
becomes the critical path.
Between notification and Crete
An accepted September-cycle paper has a compressed post-decision runway:
camera-ready and any Major Revision work land ~6 weeks after December 21 —
squarely across the holiday break, which the six-week plan must acknowledge —
followed by artifact evaluation, then travel logistics for an April conference
in Greece (visa timelines for some team members exceed the gap; start at
notification). Presentation format, registration requirements, and speaker
obligations for 2027 were 待核实 at pack-check time: read the acceptance email
before assigning the talk.
Pipelining across gates
Teams running multiple projects should treat the two gates as a pipeline: a
paper that misses the September evidence bar can target the next edition's first
gate with its evaluation matrix already built, while the response and revision
windows of a September submission land in December-February — plan author
bandwidth so a Major Revision does not collide with the next project's deadline
sprint. One person cannot own the revision of paper A and pages 1-2 of paper B
in the same six weeks.
Output format
[Cycle chosen] September 2026 / next edition (reason)
[Countdown health] on-track items · at-risk items with dates
[Owners] two-page / evidence / compliance / response — names attached?
[Branch plans] accept · major-revision · rapid-reject · full-reject, one line each
[Calendar holds] Dec 1-4 response window + 6-week revision block reserved? Y/N
[Facts to re-verify] <official pages to reopen before relying on this plan>
1---2name: asplos-workflow3description: Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027 conference in Crete, with owners per risk.4---56# ASPLOS Workflow78An ASPLOS campaign is a pipeline with two entry gates per edition and a revision9side-channel, not a single deadline sprint. All dates below are the verified 202710cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before11committing a team to any of them.1213## The 2027 cycle as a calendar1415| Gate | April cycle | September cycle |16|---|---|---|17| Full-paper deadline (11:59 PM AoE) | April 15, 2026 — **passed** | **September 9, 2026 — the live gate** |18| Author response | July 6-9, 2026 — **open this week** (as of 2026-07-08) | December 1-4, 2026 |19| Notification | July 27, 2026 | December 21, 2026 |20| Major Revision due | camera-ready deadline, 6 weeks after notification | camera-ready deadline, 6 weeks after notification |21| Conference | April 11-15, 2027, Heraklion, Crete, Greece | same |2223There is no separate abstract deadline in 2027, and no mid-year third round — the24edition moved from three deadlines to two. Missing September means waiting for the25next edition's first gate.2627## Working backward from September 9, 20262829A credible countdown for a systems paper with hardware-dependent evidence:3031```text32T-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection;33 choose evidence instruments (silicon / FPGA / simulator).34T-8 weeks Evaluation infrastructure done: baselines building,35 workloads chosen, simulator configs pinned.36T-6 weeks First full results sweep; kill or descope claims the37 data will not carry. Start the two-page draft NOW —38 it is the part rapid review actually reads.39T-4 weeks Full draft; internal red-team against the rapid-review40 question set; ablations running.41T-2 weeks Freeze experiments. Citation-format pass (full names,42 no "et al.", DOIs). Anonymity sweep.43T-1 week HotCRP entry created; PDF uploaded; co-author sign-off.44T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.45```4647## Role assignments that prevent known failures4849- **Two-page owner** — one author owns pages 1-2 as a standalone artifact and50 rehearses them against `asplos-writing-style`; rapid review reads nothing else.51- **Evidence-integrity owner** — keeps the experiment matrix (claims × platforms ×52 baselines) current so the rebuttal window never requires new runs under pressure.53- **Compliance owner** — template, 11-page geometry, citation full-name rule, GenAI54 disclosure, HotCRP fields; format violations risk rejection without review.55- **Response owner** — reserves the response window dates (Dec 1-4 for the September56 cycle) on every author's calendar at submission time, not after reviews arrive.5758## Branch planning at notification (December 21, 2026)59601. **Accept** → switch to `asplos-camera-ready` immediately; camera-ready lands61 ~6 weeks out, and artifact evaluation (`asplos-artifact-evaluation`) runs in62 parallel with its own appendix and deadlines (2027 AE calendar 待核实).632. **Major Revision** → treat as a funded contract, not a consolation: the revision64 is due at the camera-ready deadline and *counts as a submission*; scope revision65 work to exactly what the decision letter requires, tracked in a change log that66 will become the resubmission note.673. **Reject at rapid review** → the diagnosis is almost always positioning: the68 first two pages did not establish the intersection or the evidence. Fix framing69 before considering a new venue.704. **Reject after full review** → mine the reviews for the evidence matrix, then71 re-run `asplos-topic-selection`; some full-review rejects are strong ISCA, SOSP,72 or PLDI papers mis-aimed at the intersection.7374## Cross-edition cautions7576- The two-deadline structure is itself new for 2027; do not assume it for 2028.77- ASPLOS logistics genuinely change year to year — the 2025 edition (30th, Rotterdam)78 ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in79 Crete. Travel, visa, and registration planning must restart per edition (fees and80 attendance rules for 2027: 待核实).81- Program leadership rotates every edition; there is no standing editorial memory to82 appeal to. A policy answer from a previous year's chairs is expired.8384## Hardware lead times are schedule items8586Systems evidence has procurement physics that a paper calendar must absorb:8788- Cluster or testbed reservations for the T-8 to T-2 sweep window book out weeks89 ahead; reserve at claim-freeze time, not first-results time.90- FPGA synthesis iterations and simulator calibration runs are days-long serial91 steps — one redesign late in the countdown costs a week, not an evening.92- Access to pre-production parts (new memory devices, engineering samples) often93 comes with NDA review of the paper text; start that review before T-4 or it94 becomes the critical path.9596## Between notification and Crete9798An accepted September-cycle paper has a compressed post-decision runway:99camera-ready and any Major Revision work land ~6 weeks after December 21 —100squarely across the holiday break, which the six-week plan must acknowledge —101followed by artifact evaluation, then travel logistics for an April conference102in Greece (visa timelines for some team members exceed the gap; start at103notification). Presentation format, registration requirements, and speaker104obligations for 2027 were 待核实 at pack-check time: read the acceptance email105before assigning the talk.106107## Pipelining across gates108109Teams running multiple projects should treat the two gates as a pipeline: a110paper that misses the September evidence bar can target the next edition's first111gate with its evaluation matrix already built, while the response and revision112windows of a September submission land in December-February — plan author113bandwidth so a Major Revision does not collide with the next project's deadline114sprint. One person cannot own the revision of paper A and pages 1-2 of paper B115in the same six weeks.116117## Output format118119```text120[Cycle chosen] September 2026 / next edition (reason)121[Countdown health] on-track items · at-risk items with dates122[Owners] two-page / evidence / compliance / response — names attached?123[Branch plans] accept · major-revision · rapid-reject · full-reject, one line each124[Calendar holds] Dec 1-4 response window + 6-week revision block reserved? Y/N125[Facts to re-verify] <official pages to reopen before relying on this plan>126```