CCS Workflow
Use this as the project-management skill for a CCS submission. CCS is a conference, not a
journal: it has no editor-in-chief and no article-processing charge. The rotating leadership
is the per-edition General Chairs and Program Co-Chairs (CCS 2026 Program Co-Chairs: Véronique
Cortier and Zhiqiang Lin, reported 2026-07-08; verify against the organizing-committee page).
Replace every date below with the current cycle's HotCRP deadlines and work backward.
The dual-deadline cycle
CCS runs two review cycles per year into one conference. A paper enters one cycle only; work
rejected in the first cycle may not be resubmitted (even revised) to the second cycle of the
same year. Pick the cycle from readiness, not hope — a thin first-cycle submission burns the
year at this venue.
- CCS 2026 (The Hague, Netherlands, Nov 15-19, 2026) Cycle A: abstract registration Jan 7,
full paper Jan 14, rebuttal Mar 17-20, notification Apr 9, 2026 (verify).
- CCS 2026 Cycle B: abstract registration Apr 22, full paper Apr 29, rebuttal Jun 29-Jul 1,
notification Jul 17, 2026 (verify). Camera-ready reported Aug 21, 2026.
- Both 2026 deadlines have passed as of 2026-07-08; treat them as a template and read the
CCS 2027 CFP when posted (CCS 2027 host city was still under steering-committee selection).
Milestones
- Venue fit: confirm the contribution is a broad security result for the SIGSAC PC.
- Evidence lock: freeze threat model, attack/defense implementation, adaptive evaluation,
measurement validation, and the ethics/disclosure posture.
- Abstract registration: mandatory title, authors, abstract, and topics in HotCRP before the
registration deadline; no paper without a registered abstract.
- Full-paper deadline: upload the anonymized 12-page ACM sigconf PDF plus appendices.
- Rebuttal window: respond to reviews in the short author-response period.
- Notification: accept, minor revision (revise within the cycle), or reject.
- Artifact evaluation: submit artifacts after acceptance for ACM badges if you opt in.
- Camera-ready and registration: ACM proceedings version, then in-person presentation.
Backward plan from the full-paper deadline
| Weeks out (heuristic) |
Attack-plus-defense milestone |
| 10+ |
Threat model frozen, attack primitive working end to end |
| 8 |
Defense implemented; adaptive attacker designed against it |
| 6 |
Measurement or evaluation runs complete, environment logged |
| 4 |
Ethics and responsible-disclosure section drafted, disclosure initiated |
| 3 |
Full draft in ACM sigconf two-column format |
| 2 |
Internal red-team read by an adversarial-minded colleague |
| 1 |
Anonymity sweep, artifact-availability statement, appendix assembly |
| 0 |
Abstract registered, then full paper in HotCRP |
Anchor every offset to the current cycle, never to a past calendar.
Big-four deadline-hopping
CCS, IEEE S&P, USENIX Security, and NDSS run rolling multi-cycle deadlines, so a paper
rejected in one can often be reworked into the next open venue within weeks. Keep a live map:
a CCS Cycle A reject in April can target USENIX Security or the next NDSS cycle rather than
waiting a year. Never resubmit unchanged — reviewers rotate across all four venues.
Coordination notes
- Assign one owner for the ethics/disclosure section and another for the anonymity sweep;
shared ownership is how both slip.
- Archive the exact submitted PDF and appendices, since rebuttal replies must quote them.
Output format
[Current stage] idea / building / writing / abstract / submission / rebuttal / accepted / artifact
[Cycle] A / B and next official deadline (date + source, or unknown)
[Critical path] <three tasks that determine readiness>
[Risk register] <threat-model / anonymity / ethics / evidence / artifact / presentation>
[Owner map] <task -> person or role>
1---2name: ccs-workflow3description: Use when planning an ACM CCS project timeline across the two HotCRP review cycles, from venue fit through abstract registration, full-paper upload, rebuttal, notification, revision, artifact evaluation, ACM camera-ready, and in-person presentation, with backward-planning offsets and the security big-four deadline-hopping calendar.4---56# CCS Workflow78Use this as the project-management skill for a CCS submission. CCS is a conference, not a9journal: it has no editor-in-chief and no article-processing charge. The rotating leadership10is the per-edition General Chairs and Program Co-Chairs (CCS 2026 Program Co-Chairs: Véronique11Cortier and Zhiqiang Lin, reported 2026-07-08; verify against the organizing-committee page).12Replace every date below with the current cycle's HotCRP deadlines and work backward.1314## The dual-deadline cycle1516CCS runs two review cycles per year into one conference. A paper enters one cycle only; work17rejected in the first cycle may not be resubmitted (even revised) to the second cycle of the18same year. Pick the cycle from readiness, not hope — a thin first-cycle submission burns the19year at this venue.2021- CCS 2026 (The Hague, Netherlands, Nov 15-19, 2026) Cycle A: abstract registration Jan 7,22 full paper Jan 14, rebuttal Mar 17-20, notification Apr 9, 2026 (verify).23- CCS 2026 Cycle B: abstract registration Apr 22, full paper Apr 29, rebuttal Jun 29-Jul 1,24 notification Jul 17, 2026 (verify). Camera-ready reported Aug 21, 2026.25- Both 2026 deadlines have passed as of 2026-07-08; treat them as a template and read the26 CCS 2027 CFP when posted (CCS 2027 host city was still under steering-committee selection).2728## Milestones2930- Venue fit: confirm the contribution is a broad security result for the SIGSAC PC.31- Evidence lock: freeze threat model, attack/defense implementation, adaptive evaluation,32 measurement validation, and the ethics/disclosure posture.33- Abstract registration: mandatory title, authors, abstract, and topics in HotCRP before the34 registration deadline; no paper without a registered abstract.35- Full-paper deadline: upload the anonymized 12-page ACM sigconf PDF plus appendices.36- Rebuttal window: respond to reviews in the short author-response period.37- Notification: accept, minor revision (revise within the cycle), or reject.38- Artifact evaluation: submit artifacts after acceptance for ACM badges if you opt in.39- Camera-ready and registration: ACM proceedings version, then in-person presentation.4041## Backward plan from the full-paper deadline4243| Weeks out (heuristic) | Attack-plus-defense milestone |44|---|---|45| 10+ | Threat model frozen, attack primitive working end to end |46| 8 | Defense implemented; adaptive attacker designed against it |47| 6 | Measurement or evaluation runs complete, environment logged |48| 4 | Ethics and responsible-disclosure section drafted, disclosure initiated |49| 3 | Full draft in ACM sigconf two-column format |50| 2 | Internal red-team read by an adversarial-minded colleague |51| 1 | Anonymity sweep, artifact-availability statement, appendix assembly |52| 0 | Abstract registered, then full paper in HotCRP |5354Anchor every offset to the current cycle, never to a past calendar.5556## Big-four deadline-hopping5758CCS, IEEE S&P, USENIX Security, and NDSS run rolling multi-cycle deadlines, so a paper59rejected in one can often be reworked into the next open venue within weeks. Keep a live map:60a CCS Cycle A reject in April can target USENIX Security or the next NDSS cycle rather than61waiting a year. Never resubmit unchanged — reviewers rotate across all four venues.6263## Coordination notes6465- Assign one owner for the ethics/disclosure section and another for the anonymity sweep;66 shared ownership is how both slip.67- Archive the exact submitted PDF and appendices, since rebuttal replies must quote them.6869## Output format7071```text72[Current stage] idea / building / writing / abstract / submission / rebuttal / accepted / artifact73[Cycle] A / B and next official deadline (date + source, or unknown)74[Critical path] <three tasks that determine readiness>75[Risk register] <threat-model / anonymity / ethics / evidence / artifact / presentation>76[Owner map] <task -> person or role>77```