ICRA Workflow
ICRA runs on one unforgiving annual clock: papers due mid-September, decisions at
the end of January, camera-ready in early March, conference late May or early June.
There is no abstract-registration step, no rebuttal window to buy time, and the
video attachment has its own separate deadlines that surprise first-time authors.
This skill turns that clock into a working plan with named owners and fallbacks.
The verified 2026-cycle clock (anchor, not prophecy)
| Milestone |
ICRA 2026 (Vienna) actual |
Owner in your plan |
| Submission site opens (PaperPlaza) |
July 15, 2025 |
corresponding author |
| Video window 1 |
Aug 5 – Sep 9, 2025 |
experiments lead |
| Paper deadline |
Sep 15, 2025, 23:59 Pacific |
everyone |
| Video window 2 (post-deadline) |
Sep 17 – 22, 2025 |
experiments lead |
| Review period (no author contact) |
Oct 2025 – Jan 2026 |
— |
| Accept/reject notification |
Jan 31, 2026 |
corresponding author |
| Camera-ready deadline |
Mar 6, 2026 |
writing lead |
| Conference |
Jun 1 – 5, 2026 |
presenting author |
ICRA 2027 is announced for May 24-28, 2027, COEX, Seoul; its paper deadline was
not yet posted at check time (2026-07-08) — plan against mid-September 2026 as the
working hypothesis and verify at 2027.ieee-icra.org before circulating dates.
Backward planning from the September deadline
Robotics papers die on hardware time, not writing time. Count backward:
- T minus 16 weeks (late May): freeze the task definition and success metric.
Changing the task after this point invalidates collected trials.
- T minus 12 weeks: platform bring-up complete; baselines running on the real
system, not just in simulation. Order spare parts now — a burned motor driver in
August is a cycle-killer.
- T minus 8 weeks: main-method trials underway with the logging harness from
icra-reproducibility already in place; begin capturing raw video during every
session so the attachment is assembled from real footage, not re-staged runs.
- T minus 4 weeks: full experimental table exists in draft form; writing
becomes the critical path. Cut experiments, not analysis quality.
- T minus 1 week: paper into the
icra-submission audit; video edited to the
180-second cap; PaperPlaza metadata entered; PDF compliance checked.
- Deadline week: upload at least 24 hours early. PaperPlaza slows measurably
in the final hours of Pacific-time deadline day.
The winter silence and how to spend it
Between September and late January the pipeline is closed to authors — no status
pings, no updated PDFs, no supplementary additions. Productive uses:
- Extend experiments toward the camera-ready and toward the journal version.
- Prepare the RA-L conversion of the same line of work (a different paper —
never the identical manuscript, which would be dual submission).
- Draft the workshop or late-breaking submission for the same conference; those
calls typically open in winter with their own deadlines.
- Budget conference logistics early: Vienna 2026 drew 8,000+ attendees and Seoul
2027 anticipates around 10,000, so housing and visas (Schengen, then Korea)
need lead time measured in months, not weeks.
Fallback lattice
Sep ICRA deadline missed or reject in Jan?
├─ RA-L: rolling submission, ~3-month first decision,
│ accepted letters transferable to a later RAS conference stage
├─ IROS: deadline typically ~March 1 for an autumn conference
├─ CoRL: learning-centric work, deadline typically ~June
└─ ICRA workshops / late-breaking: same trip, lighter review,
non-archival or lightly archival — check the current call
Rule: pick the fallback BEFORE notification day, so a reject
converts to a resubmission in days, not months.
Interleaving the RA-L track without fouling either
Teams running both roads (see icra-topic-selection) need sequencing rules:
- A given manuscript occupies exactly one pipeline at a time; the project may
feed both only as genuinely different papers (different claims, different
evidence) — when in doubt, assume the overlap is too high.
- The efficient braid: system paper → direct ICRA in September; the follow-up
with the extended evaluation → RA-L in the spring, aiming its 270-day
presentation-transfer window at the next ICRA or IROS.
- Put the RA-L first-decision estimate (~3 months from submission) on the same
calendar as the ICRA milestones so revision labor never collides with
camera-ready labor in the same fortnight.
Failure modes this calendar prevents
- The video afterthought. Teams discover the attachment windows after the
paper deadline and miss window 2; the paper then competes without the single
most persuasive artifact a robotics reviewer sees.
- Hardware heroics in September. Last-fortnight soldering produces the thin
trial counts that
icra-experiments flags as a leading rejection cause.
- Notification-day scramble. No pre-chosen fallback means the January reject
ages for a month while the team debates; the March IROS deadline then arrives
with no revision done.
- Camera-ready compression panic. The 2026 final limit was 8 pages including
references, while submissions ran 6+2; merging reviewer-requested additions into
a tighter effective budget takes the two weeks the calendar reserves for it.
Date-verification ritual
Every date in this file is a 2026-cycle anchor. Before propagating any of them
into a team plan:
- Open the current year-site (
<year>.ieee-icra.org) contribute/CFP pages.
- Confirm the deadline's time zone — 2026 used Pacific, not AoE.
- Confirm both video windows; they move independently of the paper deadline.
- Record what you verified and when in the project log, so the next teammate
does not re-trust a stale screenshot.
Team checkpoint template
[Cycle] ICRA <year> — deadline <verified date> (verify at <year>.ieee-icra.org)
[Today minus deadline] <n> weeks
[Hardware status] platform up? spares? trial count vs plan
[Evidence status] baselines real/sim, main table % complete
[Video status] raw footage hours banked, edit owner, window dates
[Writing status] section owners, page budget vs 6+2
[Fallback] <RA-L / IROS / CoRL> pre-selected: yes/no
[Next checkpoint] <date, ≤2 weeks out>
1---2name: icra-workflow3description: Use when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.4---56# ICRA Workflow78ICRA runs on one unforgiving annual clock: papers due mid-September, decisions at9the end of January, camera-ready in early March, conference late May or early June.10There is no abstract-registration step, no rebuttal window to buy time, and the11video attachment has its own separate deadlines that surprise first-time authors.12This skill turns that clock into a working plan with named owners and fallbacks.1314## The verified 2026-cycle clock (anchor, not prophecy)1516| Milestone | ICRA 2026 (Vienna) actual | Owner in your plan |17|---|---|---|18| Submission site opens (PaperPlaza) | July 15, 2025 | corresponding author |19| Video window 1 | Aug 5 – Sep 9, 2025 | experiments lead |20| Paper deadline | Sep 15, 2025, 23:59 Pacific | everyone |21| Video window 2 (post-deadline) | Sep 17 – 22, 2025 | experiments lead |22| Review period (no author contact) | Oct 2025 – Jan 2026 | — |23| Accept/reject notification | Jan 31, 2026 | corresponding author |24| Camera-ready deadline | Mar 6, 2026 | writing lead |25| Conference | Jun 1 – 5, 2026 | presenting author |2627ICRA 2027 is announced for **May 24-28, 2027, COEX, Seoul**; its paper deadline was28not yet posted at check time (2026-07-08) — plan against mid-September 2026 as the29working hypothesis and verify at `2027.ieee-icra.org` before circulating dates.3031## Backward planning from the September deadline3233Robotics papers die on hardware time, not writing time. Count backward:3435- **T minus 16 weeks (late May):** freeze the task definition and success metric.36 Changing the task after this point invalidates collected trials.37- **T minus 12 weeks:** platform bring-up complete; baselines running on the real38 system, not just in simulation. Order spare parts now — a burned motor driver in39 August is a cycle-killer.40- **T minus 8 weeks:** main-method trials underway with the logging harness from41 `icra-reproducibility` already in place; begin capturing raw video during every42 session so the attachment is assembled from real footage, not re-staged runs.43- **T minus 4 weeks:** full experimental table exists in draft form; writing44 becomes the critical path. Cut experiments, not analysis quality.45- **T minus 1 week:** paper into the `icra-submission` audit; video edited to the46 180-second cap; PaperPlaza metadata entered; PDF compliance checked.47- **Deadline week:** upload at least 24 hours early. PaperPlaza slows measurably48 in the final hours of Pacific-time deadline day.4950## The winter silence and how to spend it5152Between September and late January the pipeline is closed to authors — no status53pings, no updated PDFs, no supplementary additions. Productive uses:54551. Extend experiments toward the camera-ready and toward the journal version.562. Prepare the RA-L conversion of the same line of work (a *different* paper —57 never the identical manuscript, which would be dual submission).583. Draft the workshop or late-breaking submission for the same conference; those59 calls typically open in winter with their own deadlines.604. Budget conference logistics early: Vienna 2026 drew 8,000+ attendees and Seoul61 2027 anticipates around 10,000, so housing and visas (Schengen, then Korea)62 need lead time measured in months, not weeks.6364## Fallback lattice6566```text67Sep ICRA deadline missed or reject in Jan?68 ├─ RA-L: rolling submission, ~3-month first decision,69 │ accepted letters transferable to a later RAS conference stage70 ├─ IROS: deadline typically ~March 1 for an autumn conference71 ├─ CoRL: learning-centric work, deadline typically ~June72 └─ ICRA workshops / late-breaking: same trip, lighter review,73 non-archival or lightly archival — check the current call74Rule: pick the fallback BEFORE notification day, so a reject75 converts to a resubmission in days, not months.76```7778## Interleaving the RA-L track without fouling either7980Teams running both roads (see `icra-topic-selection`) need sequencing rules:8182- A given manuscript occupies exactly one pipeline at a time; the *project* may83 feed both only as genuinely different papers (different claims, different84 evidence) — when in doubt, assume the overlap is too high.85- The efficient braid: system paper → direct ICRA in September; the follow-up86 with the extended evaluation → RA-L in the spring, aiming its 270-day87 presentation-transfer window at the *next* ICRA or IROS.88- Put the RA-L first-decision estimate (~3 months from submission) on the same89 calendar as the ICRA milestones so revision labor never collides with90 camera-ready labor in the same fortnight.9192## Failure modes this calendar prevents9394- **The video afterthought.** Teams discover the attachment windows after the95 paper deadline and miss window 2; the paper then competes without the single96 most persuasive artifact a robotics reviewer sees.97- **Hardware heroics in September.** Last-fortnight soldering produces the thin98 trial counts that `icra-experiments` flags as a leading rejection cause.99- **Notification-day scramble.** No pre-chosen fallback means the January reject100 ages for a month while the team debates; the March IROS deadline then arrives101 with no revision done.102- **Camera-ready compression panic.** The 2026 final limit was 8 pages *including*103 references, while submissions ran 6+2; merging reviewer-requested additions into104 a tighter effective budget takes the two weeks the calendar reserves for it.105106## Date-verification ritual107108Every date in this file is a 2026-cycle anchor. Before propagating any of them109into a team plan:1101111. Open the current year-site (`<year>.ieee-icra.org`) contribute/CFP pages.1122. Confirm the deadline's **time zone** — 2026 used Pacific, not AoE.1133. Confirm both video windows; they move independently of the paper deadline.1144. Record what you verified and when in the project log, so the next teammate115 does not re-trust a stale screenshot.116117## Team checkpoint template118119```text120[Cycle] ICRA <year> — deadline <verified date> (verify at <year>.ieee-icra.org)121[Today minus deadline] <n> weeks122[Hardware status] platform up? spares? trial count vs plan123[Evidence status] baselines real/sim, main table % complete124[Video status] raw footage hours banked, edit owner, window dates125[Writing status] section owners, page budget vs 6+2126[Fallback] <RA-L / IROS / CoRL> pre-selected: yes/no127[Next checkpoint] <date, ≤2 weeks out>128```