ISCA Workflow
An ISCA year has one gate. Miss mid-November and the next identical opportunity is
twelve months away, which is why experienced groups treat the ISCA calendar as an
engineering schedule with the deadline as tape-out. This skill lays out that
schedule using the verified ISCA 2026 dates as the template; as of 2026-07-08 the
ISCA 2027 CFP was not yet posted, so every 2027 date below is an expectation to
confirm against iscaconf.org/isca2027/ the moment it exists (待核实).
The verified 2026-cycle skeleton
| Milestone |
ISCA 2026 date (verified) |
What it means operationally |
| Abstract registration |
November 10, 2025 |
Title, abstract, authors, conflicts locked in HotCRP; paper content still fluid |
| Full paper |
November 17, 2025 |
The reviewed PDF — one week after abstracts, so the abstract week is a writing week, not a buffer |
| Round 1 reviews due |
December 19, 2025 |
First reviewer wave completes before the holidays |
| Round 2 reviews due |
February 13, 2026 |
Additional reviews on papers that advanced |
| Rebuttal + revision |
February 16 - March 6, 2026 |
Authors see reviews, respond, and may revise — a three-week working window |
| Conference |
June 27 - July 1, 2026 (Raleigh, NC) |
Presentation; artifact badges resolved before publication |
Industry-track submissions ran about a month behind (abstracts December 5, papers
December 12, 2025). Final notification date for 2026 was not captured in this
pack's verification — 待核实.
Working backward from November
Count in weeks from the expected paper deadline (call it P, likely mid-November
2026 for ISCA 2027):
- P minus 16 weeks (late July): venue decision final (
isca-topic-selection);
simulation or prototype infrastructure chosen and validated
(isca-experiments); the one-sentence claim written on the whiteboard.
- P minus 10 weeks: baseline configurations frozen and reproduced from scratch
by a second person. Baseline drift discovered later invalidates every downstream
number.
- P minus 6 weeks: main-result experiments complete. From here, compute goes to
sensitivity studies and reviewer-anticipation runs, not to the headline.
- P minus 4 weeks: full draft exists — bad prose, complete structure. Internal
"mock PC" read by two colleagues who did not build the system.
- P minus 1 week (abstract deadline): title/abstract/topics/conflicts final in
HotCRP. The abstract steers reviewer assignment; write it for bidding, not as a
placeholder.
- P: upload per
isca-submission, then freeze the artifact snapshot that
matches the submitted numbers (isca-reproducibility).
The winter: silence, then three loud weeks
Between November and mid-February the authors' only jobs are (a) keep the
evaluation environment resurrectable and (b) pre-build rebuttal ammunition: the
five most likely objections, each with a ready experiment or a pointer into the
submitted PDF. The 2026 cycle then opened a combined rebuttal/revision period
(February 16 - March 6) — unusually long by conference standards precisely because
ISCA lets authors change the paper, not just argue about it. Staff those three
weeks like a sprint: compute reserved, coauthors on call, no conference travel
booked. Details of what to do inside the window live in isca-author-response.
Branch plans after notification
- Accept: camera-ready under the edition's publisher workflow
(
isca-camera-ready), voluntary artifact submission (isca-artifact-evaluation),
talk and travel for late June.
- Reject with salvageable reviews: map every misunderstanding to the sentence
that permitted it; decide MICRO (spring gate) vs HPCA (summer gate) within two
weeks while the reviews are fresh.
- Reject with a fit objection: rerun
isca-topic-selection honestly — the
committee may have told you the paper's true venue.
Team ledger
Keep a single tracking file in the paper repo; every risk has one owner.
# isca-campaign.yaml
target: ISCA 2027 # 54th by arithmetic - ordinal 待核实
gate:
abstract: TBD-2026-11 # confirm on iscaconf.org/isca2027 when live
paper: TBD-2026-11
source: "not yet posted as of 2026-07-08"
owners:
claim_and_story: <name> # one sentence, defended weekly
simulation_infra: <name> # versions pinned, configs archived
baselines: <name> # frozen P-10w, independently reproduced
writing: <name> # draft complete P-4w
submission_admin: <name> # HotCRP, conflicts, template, metadata
rebuttal_reserve: <name> # compute + calendar hold, mid-Feb to early Mar
checks:
- abstract written for reviewer bidding, not filler
- artifact snapshot tagged at submission commit
- mock-PC read completed and objections filed
- fallback venue named with trigger condition
Failure modes this calendar prevents
- The November collision: abstract and paper a week apart means groups that
planned "we'll write after the abstract" write the whole paper in seven days.
The P-4w draft rule exists for this.
- The dead environment: rebuttal-window experiments that fail because the
simulator tree no longer builds in February. Tag and containerize at submission.
- The unstaffed revision: ISCA's revision option is leverage only for teams
that can produce new results in days; treat the window as scheduled work.
- The stale retarget: rejected papers resubmitted unchanged to MICRO carry
their ISCA reviews' fingerprints; committees overlap. Budget a real revision.
Milestone-to-skill routing
| When you are at... |
Open... |
| Venue decision (P-16w) |
isca-topic-selection, exemplars library |
| Infrastructure setup |
isca-experiments, isca-reproducibility |
| Drafting (P-6w to P-1w) |
isca-writing-style, isca-related-work, isca-supplementary |
| Upload week |
isca-submission (twice: abstract step, paper step) |
| Winter wait |
isca-review-process |
| February window |
isca-author-response |
| Post-decision |
isca-camera-ready, isca-artifact-evaluation, or the retarget branch |
All dates above are the 2026-cycle record
(../../resources/official-source-map.md, checked 2026-07-08). Confirm the 2027
calendar, page rules, and review mechanics on the official site before acting on
any of them.
1---2name: isca-workflow3description: Use when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.4---56# ISCA Workflow78An ISCA year has one gate. Miss mid-November and the next identical opportunity is9twelve months away, which is why experienced groups treat the ISCA calendar as an10engineering schedule with the deadline as tape-out. This skill lays out that11schedule using the verified ISCA 2026 dates as the template; as of 2026-07-08 the12ISCA 2027 CFP was not yet posted, so every 2027 date below is an expectation to13confirm against `iscaconf.org/isca2027/` the moment it exists (待核实).1415## The verified 2026-cycle skeleton1617| Milestone | ISCA 2026 date (verified) | What it means operationally |18|---|---|---|19| Abstract registration | November 10, 2025 | Title, abstract, authors, conflicts locked in HotCRP; paper content still fluid |20| Full paper | November 17, 2025 | The reviewed PDF — one week after abstracts, so the abstract week is a writing week, not a buffer |21| Round 1 reviews due | December 19, 2025 | First reviewer wave completes before the holidays |22| Round 2 reviews due | February 13, 2026 | Additional reviews on papers that advanced |23| Rebuttal + revision | February 16 - March 6, 2026 | Authors see reviews, respond, and may revise — a three-week working window |24| Conference | June 27 - July 1, 2026 (Raleigh, NC) | Presentation; artifact badges resolved before publication |2526Industry-track submissions ran about a month behind (abstracts December 5, papers27December 12, 2025). Final notification date for 2026 was not captured in this28pack's verification — 待核实.2930## Working backward from November3132Count in weeks from the expected paper deadline (call it P, likely mid-November332026 for ISCA 2027):3435- **P minus 16 weeks (late July):** venue decision final (`isca-topic-selection`);36 simulation or prototype infrastructure chosen and validated37 (`isca-experiments`); the one-sentence claim written on the whiteboard.38- **P minus 10 weeks:** baseline configurations frozen and reproduced from scratch39 by a second person. Baseline drift discovered later invalidates every downstream40 number.41- **P minus 6 weeks:** main-result experiments complete. From here, compute goes to42 sensitivity studies and reviewer-anticipation runs, not to the headline.43- **P minus 4 weeks:** full draft exists — bad prose, complete structure. Internal44 "mock PC" read by two colleagues who did not build the system.45- **P minus 1 week (abstract deadline):** title/abstract/topics/conflicts final in46 HotCRP. The abstract steers reviewer assignment; write it for bidding, not as a47 placeholder.48- **P:** upload per `isca-submission`, then freeze the artifact snapshot that49 matches the submitted numbers (`isca-reproducibility`).5051## The winter: silence, then three loud weeks5253Between November and mid-February the authors' only jobs are (a) keep the54evaluation environment resurrectable and (b) pre-build rebuttal ammunition: the55five most likely objections, each with a ready experiment or a pointer into the56submitted PDF. The 2026 cycle then opened a combined **rebuttal/revision period**57(February 16 - March 6) — unusually long by conference standards precisely because58ISCA lets authors *change the paper*, not just argue about it. Staff those three59weeks like a sprint: compute reserved, coauthors on call, no conference travel60booked. Details of what to do inside the window live in `isca-author-response`.6162## Branch plans after notification6364- **Accept:** camera-ready under the edition's publisher workflow65 (`isca-camera-ready`), voluntary artifact submission (`isca-artifact-evaluation`),66 talk and travel for late June.67- **Reject with salvageable reviews:** map every misunderstanding to the sentence68 that permitted it; decide MICRO (spring gate) vs HPCA (summer gate) within two69 weeks while the reviews are fresh.70- **Reject with a fit objection:** rerun `isca-topic-selection` honestly — the71 committee may have told you the paper's true venue.7273## Team ledger7475Keep a single tracking file in the paper repo; every risk has one owner.7677```yaml78# isca-campaign.yaml79target: ISCA 2027 # 54th by arithmetic - ordinal 待核实80gate:81 abstract: TBD-2026-11 # confirm on iscaconf.org/isca2027 when live82 paper: TBD-2026-1183 source: "not yet posted as of 2026-07-08"84owners:85 claim_and_story: <name> # one sentence, defended weekly86 simulation_infra: <name> # versions pinned, configs archived87 baselines: <name> # frozen P-10w, independently reproduced88 writing: <name> # draft complete P-4w89 submission_admin: <name> # HotCRP, conflicts, template, metadata90 rebuttal_reserve: <name> # compute + calendar hold, mid-Feb to early Mar91checks:92 - abstract written for reviewer bidding, not filler93 - artifact snapshot tagged at submission commit94 - mock-PC read completed and objections filed95 - fallback venue named with trigger condition96```9798## Failure modes this calendar prevents99100- **The November collision:** abstract and paper a week apart means groups that101 planned "we'll write after the abstract" write the whole paper in seven days.102 The P-4w draft rule exists for this.103- **The dead environment:** rebuttal-window experiments that fail because the104 simulator tree no longer builds in February. Tag and containerize at submission.105- **The unstaffed revision:** ISCA's revision option is leverage only for teams106 that can produce new results in days; treat the window as scheduled work.107- **The stale retarget:** rejected papers resubmitted unchanged to MICRO carry108 their ISCA reviews' fingerprints; committees overlap. Budget a real revision.109110## Milestone-to-skill routing111112| When you are at... | Open... |113|---|---|114| Venue decision (P-16w) | `isca-topic-selection`, exemplars library |115| Infrastructure setup | `isca-experiments`, `isca-reproducibility` |116| Drafting (P-6w to P-1w) | `isca-writing-style`, `isca-related-work`, `isca-supplementary` |117| Upload week | `isca-submission` (twice: abstract step, paper step) |118| Winter wait | `isca-review-process` |119| February window | `isca-author-response` |120| Post-decision | `isca-camera-ready`, `isca-artifact-evaluation`, or the retarget branch |121122All dates above are the 2026-cycle record123(`../../resources/official-source-map.md`, checked 2026-07-08). Confirm the 2027124calendar, page rules, and review mechanics on the official site before acting on125any of them.