SIGCOMM Workflow
Use this as the project-management skill for a SIGCOMM campaign. The defining constraint is
one main-track deadline per year feeding one August conference: there is no fall gate, so the
plan is a year-long backward schedule from February, not a two-shot hedge. Replace every date
with the current official timetable.
SIGCOMM is a conference, not a journal: it has no standing editor-in-chief and no
article-processing charge. The rotating leadership is the per-edition General Chairs and
Program Committee Co-Chairs (the 2026 roster was not retrievable on 2026-07-09 — 待核实), and
the cost model is registration, not APCs; proceedings publish through ACM TAPS into the ACM
Digital Library. Chairs rotate yearly, so re-check the current organization page.
Milestones
- Venue fit and track: confirm a networking-stack mechanism and pick research vs.
experience.
- Evidence lock: freeze the testbed, traces, workloads, baselines, measurement
methodology, and the tail metrics before writing hardens.
- Abstract registration: real title, authors, topics, conflicts on HotCRP.
- Full-paper upload: anonymous PDF, 12 single-spaced pre-reference pages, ACM template.
- Review release: triage across correctness, novelty, evaluation realism, and clarity.
- Rebuttal: for papers reaching the discussion phase, a concise anonymous reply.
- Decision: accept, one-shot revision, or reject (early or formal).
- Revision (if issued): resubmit ~a month later under a shepherd against the issue list.
- Camera-ready: shepherd sign-off, TAPS final PDF plus source, de-anonymization.
- Artifact evaluation and presentation: AEC badges, public release, August talk.
Backward plan from the February paper deadline
| Weeks out (heuristic) |
Systems/measurement milestone |
| 14+ |
Mechanism designed; testbed or trace pipeline standing and repeatable |
| 10 |
Core evaluation runs producing stable tails across repeated trials |
| 7 |
Baselines that fight back implemented and tuned fairly |
| 5 |
Full draft in ACM two-column format, figures counting against 12 pages |
| 3 |
Internal mock review by a networking-minded reader; break-point experiment added |
| 2 |
Reproducibility ledger and artifact skeleton assembled |
| 1 |
Anonymity sweep, HotCRP fields, abstract registered |
| 0 |
Full paper uploaded AoE; receipt re-read |
These offsets are planning heuristics — anchor each to the current official timetable, never
to a previous edition's calendar.
The year has two halves, not one deadline
Because the deadline is annual, the calendar after submission matters as much as before it.
As of 2026-07-09 the SIGCOMM 2026 cycle is in its live post-decision phase: the February
deadline passed, decisions issued, and the work now is camera-ready finalization, shepherd
sign-off, artifact evaluation, and the August presentation — while the next edition's
February deadline is already the horizon for new work. Plan both halves: the run-up to the
single deadline, and the shepherd-to-proceedings tail that follows acceptance.
Failure modes by stage
- Evidence still moving at week 5 forces last-minute metric changes nobody has re-run — the
classic evaluation-realism reject in the making.
- Leaving ACM two-column conversion to the final week surfaces figure-driven overflow late,
because figures count against the 12 pages.
- Skipping the mock review forfeits the only chance to hear "your baseline is a straw man"
from a friend instead of a reviewer.
- Treating a one-shot revision as optional polish rather than a shepherd-graded contract is
how a revision that dodged the issue list gets rejected.
- Deferring the artifact until after acceptance loses the reproducibility evidence that a
clean rebuild would have surfaced.
Coordination notes
- Assign one named owner for the reproducibility ledger and another for the anonymity sweep;
shared ownership is how both slip.
- Archive the exact submitted PDF and every logged run, since rebuttal and revision replies
must quote them precisely.
Output format
[Current stage] idea / evaluation / writing / abstract / submission / rebuttal / revision / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <format / anonymity / evaluation realism / reproducibility / shepherd>
[Owner map] <task -> person or role>
1---2name: sigcomm-workflow3description: Use when planning an ACM SIGCOMM project timeline around the single yearly deadline — venue fit, evidence lock, abstract registration and paper upload in February, the early-reject/rebuttal/one-shot-revision review pipeline, shepherd-run camera-ready, TAPS proceedings, artifact evaluation, and forward planning for the next edition.4---56# SIGCOMM Workflow78Use this as the project-management skill for a SIGCOMM campaign. The defining constraint is9one main-track deadline per year feeding one August conference: there is no fall gate, so the10plan is a year-long backward schedule from February, not a two-shot hedge. Replace every date11with the current official timetable.1213SIGCOMM is a conference, not a journal: it has no standing editor-in-chief and no14article-processing charge. The rotating leadership is the per-edition General Chairs and15Program Committee Co-Chairs (the 2026 roster was not retrievable on 2026-07-09 — 待核实), and16the cost model is registration, not APCs; proceedings publish through ACM TAPS into the ACM17Digital Library. Chairs rotate yearly, so re-check the current organization page.1819## Milestones2021- **Venue fit and track**: confirm a networking-stack mechanism and pick research vs.22 experience.23- **Evidence lock**: freeze the testbed, traces, workloads, baselines, measurement24 methodology, and the tail metrics before writing hardens.25- **Abstract registration**: real title, authors, topics, conflicts on HotCRP.26- **Full-paper upload**: anonymous PDF, 12 single-spaced pre-reference pages, ACM template.27- **Review release**: triage across correctness, novelty, evaluation realism, and clarity.28- **Rebuttal**: for papers reaching the discussion phase, a concise anonymous reply.29- **Decision**: accept, one-shot revision, or reject (early or formal).30- **Revision** (if issued): resubmit ~a month later under a shepherd against the issue list.31- **Camera-ready**: shepherd sign-off, TAPS final PDF plus source, de-anonymization.32- **Artifact evaluation and presentation**: AEC badges, public release, August talk.3334## Backward plan from the February paper deadline3536| Weeks out (heuristic) | Systems/measurement milestone |37|---|---|38| 14+ | Mechanism designed; testbed or trace pipeline standing and repeatable |39| 10 | Core evaluation runs producing stable tails across repeated trials |40| 7 | Baselines that fight back implemented and tuned fairly |41| 5 | Full draft in ACM two-column format, figures counting against 12 pages |42| 3 | Internal mock review by a networking-minded reader; break-point experiment added |43| 2 | Reproducibility ledger and artifact skeleton assembled |44| 1 | Anonymity sweep, HotCRP fields, abstract registered |45| 0 | Full paper uploaded AoE; receipt re-read |4647These offsets are planning heuristics — anchor each to the current official timetable, never48to a previous edition's calendar.4950## The year has two halves, not one deadline5152Because the deadline is annual, the calendar after submission matters as much as before it.53As of 2026-07-09 the SIGCOMM 2026 cycle is in its **live post-decision phase**: the February54deadline passed, decisions issued, and the work now is camera-ready finalization, shepherd55sign-off, artifact evaluation, and the August presentation — while the *next* edition's56February deadline is already the horizon for new work. Plan both halves: the run-up to the57single deadline, and the shepherd-to-proceedings tail that follows acceptance.5859## Failure modes by stage6061- Evidence still moving at week 5 forces last-minute metric changes nobody has re-run — the62 classic evaluation-realism reject in the making.63- Leaving ACM two-column conversion to the final week surfaces figure-driven overflow late,64 because figures count against the 12 pages.65- Skipping the mock review forfeits the only chance to hear "your baseline is a straw man"66 from a friend instead of a reviewer.67- Treating a one-shot revision as optional polish rather than a shepherd-graded contract is68 how a revision that dodged the issue list gets rejected.69- Deferring the artifact until after acceptance loses the reproducibility evidence that a70 clean rebuild would have surfaced.7172## Coordination notes7374- Assign one named owner for the reproducibility ledger and another for the anonymity sweep;75 shared ownership is how both slip.76- Archive the exact submitted PDF and every logged run, since rebuttal and revision replies77 must quote them precisely.7879## Output format8081```text82[Current stage] idea / evaluation / writing / abstract / submission / rebuttal / revision / accepted83[Next official deadline] <date and source, or unknown>84[Critical path] <three tasks that determine readiness>85[Risk register] <format / anonymity / evaluation realism / reproducibility / shepherd>86[Owner map] <task -> person or role>87```