Storage Migration Plan Skill
Migrate {{ data_volume }} from {{ source_storage }} to {{ target_storage }}.
Workflow
Phase 1 — Storage Assessment
CURRENT STATE
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Source: {{ source_storage }}
- Total capacity: ___
- Used capacity: {{ data_volume }}
- IOPS (current): ___
- Throughput (current): ___ MB/s
- Latency (P95): ___ms
[ ] Target: {{ target_storage }}
- Provisioned capacity: ___
- IOPS (expected): ___
- Throughput (expected): ___ MB/s
- Latency (expected): ___ms
[ ] Data classification:
- Hot data: ___ GB
- Warm data: ___ GB
- Cold data: ___ GB
[ ] File/object count: ___
Phase 2 — Migration Strategy
STRATEGY SELECTION
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Transfer method (choose one):
[ ] Online copy (rsync, AWS DataSync, robocopy)
[ ] Snapshot-based (snapshot + restore)
[ ] Streaming replication
[ ] Offline transfer (AWS Snowball, physical media)
Estimated transfer time: ___
Transfer bandwidth allocated: ___ MB/s
Impact on production workload: [ ] NONE [ ] LOW [ ] MEDIUM
Migration order:
[ ] 1. Cold data first (lowest risk)
[ ] 2. Warm data
[ ] 3. Hot data (with cutover)
Phase 3 — Data Transfer
TRANSFER EXECUTION
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Initial sync started — timestamp: ___
[ ] Progress:
- Data transferred: ___ / {{ data_volume }}
- Transfer rate: ___ MB/s
- Estimated completion: ___
[ ] Incremental sync configured for delta changes
[ ] Transfer errors encountered: ___
[ ] Integrity checks during transfer:
- Checksums validated: [ ] YES
- File count matches: [ ] YES
Phase 4 — Cutover
CUTOVER EXECUTION
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Final incremental sync completed
[ ] Application downtime window (if required): ___
[ ] Mount points / storage paths updated
[ ] Application configuration updated to target storage
[ ] Application restarted and connected to target
[ ] Read/write operations verified on target
[ ] Cutover complete — timestamp: ___
Phase 5 — Validation and Cleanup
POST-MIGRATION VALIDATION
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
[ ] Data integrity confirmed:
- File/object count: source ___ vs target ___
- Total size: source ___ vs target ___
- Checksum spot check: [ ] PASS [ ] FAIL
[ ] Performance benchmarks met:
- IOPS: ___ (target: ___)
- Throughput: ___ MB/s (target: ___)
- Latency: ___ms (target: ___ms)
[ ] Application performance normal
[ ] Source storage retained for ___ days (rollback window)
[ ] Source storage decommissioned — date: ___
[ ] Cost comparison: source $___ /mo vs target $___ /mo
Counter-Rationalizations
| Shortcut |
Counter |
Why |
| "We can skip some steps for this case" |
Adapt the workflow steps, don't skip them |
Skipped steps are where incidents and oversights originate |
| "The user seems to already know what to do" |
Complete all workflow phases with the user |
The workflow catches blind spots that experience alone misses |
| "This is a minor case, full process is overkill" |
Scale the process down, don't turn it off |
Minor cases become major when unstructured; the process scales, not disappears |
| "I'll fill in the details later" |
Complete each section before moving on |
Deferred details are forgotten; real-time capture is more accurate |
| "The template output isn't necessary" |
Always produce the structured output format |
Structured output enables comparison, audit trails, and handoff to other teams |
Output Format
Produce a storage migration report with:
- Migration summary (source, target, volume, timeline)
- Transfer metrics (duration, throughput, errors)
- Data integrity (counts, checksums, validation results)
- Performance comparison (IOPS, throughput, latency before vs after)
- Cost impact (monthly cost change and projected savings)
1---2name: storage-migration-plan3enabled: true4description: |5 Use when performing storage migration plan — structured plan for migrating6 data between storage systems, volumes, or tiers. Covers capacity planning,7 data transfer strategy, performance benchmarking, cutover coordination, and8 validation to ensure data integrity and minimal disruption during storage9 transitions.10required_connections:11 - prefix: aws12 label: "AWS (or cloud provider)"13config_fields:14 - key: source_storage15 label: "Source Storage"16 required: true17 placeholder: "e.g., EBS gp2 volumes, on-prem NFS"18 - key: target_storage19 label: "Target Storage"20 required: true21 placeholder: "e.g., EBS gp3 volumes, EFS, S3"22 - key: data_volume23 label: "Data Volume"24 required: true25 placeholder: "e.g., 5 TB"26features:27 - DEVOPS28 - MIGRATION29metadata:30 source: https://skillmd.com/skills/cloudthinker-ai/storage-migration-plan31---3233# Storage Migration Plan Skill3435Migrate **{{ data_volume }}** from **{{ source_storage }}** to **{{ target_storage }}**.3637## Workflow3839### Phase 1 — Storage Assessment4041```42CURRENT STATE43━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━44[ ] Source: {{ source_storage }}45 - Total capacity: ___46 - Used capacity: {{ data_volume }}47 - IOPS (current): ___48 - Throughput (current): ___ MB/s49 - Latency (P95): ___ms50[ ] Target: {{ target_storage }}51 - Provisioned capacity: ___52 - IOPS (expected): ___53 - Throughput (expected): ___ MB/s54 - Latency (expected): ___ms55[ ] Data classification:56 - Hot data: ___ GB57 - Warm data: ___ GB58 - Cold data: ___ GB59[ ] File/object count: ___60```6162### Phase 2 — Migration Strategy6364```65STRATEGY SELECTION66━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━67Transfer method (choose one):68[ ] Online copy (rsync, AWS DataSync, robocopy)69[ ] Snapshot-based (snapshot + restore)70[ ] Streaming replication71[ ] Offline transfer (AWS Snowball, physical media)7273Estimated transfer time: ___74Transfer bandwidth allocated: ___ MB/s75Impact on production workload: [ ] NONE [ ] LOW [ ] MEDIUM7677Migration order:78[ ] 1. Cold data first (lowest risk)79[ ] 2. Warm data80[ ] 3. Hot data (with cutover)81```8283### Phase 3 — Data Transfer8485```86TRANSFER EXECUTION87━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━88[ ] Initial sync started — timestamp: ___89[ ] Progress:90 - Data transferred: ___ / {{ data_volume }}91 - Transfer rate: ___ MB/s92 - Estimated completion: ___93[ ] Incremental sync configured for delta changes94[ ] Transfer errors encountered: ___95[ ] Integrity checks during transfer:96 - Checksums validated: [ ] YES97 - File count matches: [ ] YES98```99100### Phase 4 — Cutover101102```103CUTOVER EXECUTION104━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━105[ ] Final incremental sync completed106[ ] Application downtime window (if required): ___107[ ] Mount points / storage paths updated108[ ] Application configuration updated to target storage109[ ] Application restarted and connected to target110[ ] Read/write operations verified on target111[ ] Cutover complete — timestamp: ___112```113114### Phase 5 — Validation and Cleanup115116```117POST-MIGRATION VALIDATION118━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━119[ ] Data integrity confirmed:120 - File/object count: source ___ vs target ___121 - Total size: source ___ vs target ___122 - Checksum spot check: [ ] PASS [ ] FAIL123[ ] Performance benchmarks met:124 - IOPS: ___ (target: ___)125 - Throughput: ___ MB/s (target: ___)126 - Latency: ___ms (target: ___ms)127[ ] Application performance normal128[ ] Source storage retained for ___ days (rollback window)129[ ] Source storage decommissioned — date: ___130[ ] Cost comparison: source $___ /mo vs target $___ /mo131```132133## Counter-Rationalizations134135| Shortcut | Counter | Why |136|----------|---------|-----|137| "We can skip some steps for this case" | Adapt the workflow steps, don't skip them | Skipped steps are where incidents and oversights originate |138| "The user seems to already know what to do" | Complete all workflow phases with the user | The workflow catches blind spots that experience alone misses |139| "This is a minor case, full process is overkill" | Scale the process down, don't turn it off | Minor cases become major when unstructured; the process scales, not disappears |140| "I'll fill in the details later" | Complete each section before moving on | Deferred details are forgotten; real-time capture is more accurate |141| "The template output isn't necessary" | Always produce the structured output format | Structured output enables comparison, audit trails, and handoff to other teams |142143## Output Format144145Produce a storage migration report with:1461. **Migration summary** (source, target, volume, timeline)1472. **Transfer metrics** (duration, throughput, errors)1483. **Data integrity** (counts, checksums, validation results)1494. **Performance comparison** (IOPS, throughput, latency before vs after)1505. **Cost impact** (monthly cost change and projected savings)