Commercial Variation Order Analysis
Overview
Analyze and quantify variation orders — rate application, cost impact, time impact, and precedent analysis. Announce at start: "I'm using the commercial-variation-order-analysis skill to analyze a variation order."
When to Use This Skill
Trigger Conditions: Variation event directed by engineer/owner, scope change encountered, unforeseen conditions encountered, design modification required Prerequisites: Variation event documented, contract rates available, scope change identified
Step-by-Step Procedure
Step 1: Identify Variation Event
- Identify the event triggering the variation
- Verify written instruction received
- Document the circumstances (date, cause, impact description)
Step 2: Verify Contractual Entitlement
- Identify the contract clause providing for variations
- Check if notice requirements met
- Verify the variation is within the scope of allowable changes
Step 3: Identify Applicable Rates
- Check if contract contains applicable rates for the varied work
- If no applicable rate, identify analogous rates for similar work
- If no analogous rate, calculate new rates from first principles
Step 4: Calculate Cost Impact
- Direct costs: Additional labor, materials, equipment
- Time-related costs: Extended preliminaries, site overhead
- Overheads and profit: Apply contract percentage or reasonable rate
Step 5: Calculate Time Impact
- Determine if variation is on the critical path
- Calculate additional days required
- Assess concurrency with other delays
Step 6: Assess Precedent
- Identify similar variations and their settlement
- Ensure consistency with previous variation assessments
- Document precedent for future reference
Step 7: Prepare VO Submission
- Compile variation description
- Attach entitlement clause reference
- Include detailed cost breakdown
- Include time impact assessment
- Submit for approval and routing
Success Criteria
- Variation event documented with written instruction
- Contractual entitlement verified and documented
- Applicable rates identified and applied correctly
- Cost impact calculated with detailed breakdown
- Time impact assessed with critical path analysis
- Precedent reviewed for consistency
- VO submission prepared with all elements
Common Pitfalls
- No Written Instruction — Never proceed with varied work without written instruction. Oral instructions must be confirmed in writing.
- Wrong Rate Application — Applying inappropriate rates leads to disputes. Follow contract rate hierarchy: applicable → analogous → new.
- Missing Time Impact — Time impact is often under-assessed. Always check critical path.
Cross-References
Related Skills
commercial-claim-quantification— Cost quantification methodologycommercial-contract-amendment— Contract amendment process
Related Agents
COM-009Commercial Variation & Claims Agent — Primary agentCOM-002Commercial Contract Administrator Agent — Supporting agent