Launch Plan — 30/60/90-Day Execution Roadmap
Converts analysis into action. Produces a chronological execution plan that tells the founder exactly what to do each week for the next 90 days — from validation through launch and early growth. Most powerful after running dimension skills; works standalone too.
Philosophy
Plans without deadlines are daydreams. Actions without sequence are chaos. Founders don't fail because they lack analysis — they fail because they can't convert analysis into a sequenced, time-bound execution plan. This skill is the bridge between "I know what to build" and "I built it and people are paying."
Read .claude/skills/_shared/philosophy.md for the full bottleneck shift and bootstrapper framework. For launch planning specifically:
The bootstrapper launch reality:
- You don't have a team. Every action item must be doable by 1-2 people.
- Cash is finite. Every spend must be justified against timeline to revenue.
- Speed is the advantage. The plan should be aggressive — 90 days, not 12 months.
- Validation before building. The plan front-loads customer evidence, not product development.
- Kill criteria are essential. A good plan includes when to STOP, not just what to START.
Phase philosophy:
- Days 1-30 (Validate): Prove the problem, customer, and willingness to pay are real. NO product building.
- Days 31-60 (Build & Test): Build the minimum product that tests the core value proposition. Ship to early users.
- Days 61-90 (Launch & Grow): Public launch, first paying customers, initial distribution. Revenue or a clear kill decision.
What makes this different from generic roadmaps:
- Every action has a concrete deliverable (not "research the market" but "interview 10 target buyers and document their top 3 pain points")
- Decision gates force go/no-go choices at key moments
- Kill criteria prevent founders from pouring 6 months into a dead idea
- Budget is explicit — founders know what they'll spend before they start
- The plan adapts to prior analysis — if
/problem-analysis found weak evidence, Week 1 focuses on validation
Reference Books
Check references/INDEX.md for relevant frameworks. Key books for launch planning:
- lean-startup (Ries) — Build-measure-learn loop structures the validation phase; MVP definition for Phase 2 scoping; innovation accounting for decision gates; pivot-or-persevere framework for kill criteria
- startup-owners-manual (Blank & Dorf) — Customer development methodology for Phase 1 (discovery before building); earlyvangelists as the first customers to target; channel strategy for Phase 3 launch
- shape-up (Singer) — Fixed-time, variable-scope approach for the build phase; 6-week cycle concept adapted to 30-day phases; appetite setting before building; circuit breaker principle for kill decisions
- getting-real (37signals) — "Launch fast" philosophy; Hollywood launch technique for Phase 3; build less and ship sooner; epicenter design for deciding what to build first in the MVP sprint
- traction-weinberg (Weinberg & Mares) — Bullseye framework for channel testing in Phase 3; the 50% rule (spend half effort on distribution); 19 channels as the menu for launch distribution tactics
- mom-test (Fitzpatrick) — Customer interview methodology for Phase 1 validation activities; how to structure the customer conversations that decision gates depend on
- profit-first (Michalowicz) — Budget allocation framework for the 90-day budget section; Profit First formula for making the financial plan sustainable from day one
Research-First Protocol
This skill is primarily a synthesis skill — it consumes prior analysis more than it generates new research. However, when run standalone:
Quick research tasks:
- "[product category] launch strategy" / "how to launch [product type]"
- "[product category] tools and costs" (for budget estimation)
- "[target market] communities" / "[target market] events" (for launch channels)
- Check competitor launch stories on Product Hunt, IndieHackers, Hacker News
Consume prior intelligence (CRITICAL): This skill is designed to run AFTER dimension skills. Pull from:
- problem-analysis: Validation status, customer discovery recommendations, weak gates to address
- gtm-strategy: Channel strategy, first 100 customers plan, distribution economics
- competitor-analysis: Competitive wedge, customers to steal, positioning strategy
- solution-analysis: MPA (Minimum Product Achievability), time-to-value, differentiation
- financial-projections: Break-even timeline, startup costs, founder sustainability
- business-model: Revenue model, pricing strategy, monetization approach
- market-size: Beachhead market, demand signals
- founder-fit: Time budget, financial runway, execution tempo, critical gaps
- timing-analysis: Market window, entry timing urgency
- moat-analysis: What to invest in for long-term defensibility
- user-personas: Primary buyer targeting criteria, buying triggers (if run)
- positioning: Homepage copy, messaging, language bank (if run)
- content-strategy: Content calendar, keyword targets, distribution checklist (if run)
- risk-assessment: Top risks and mitigations (if run)
- bootstrap-oracle / analyze-idea: Overall verdict, scoring, recommended actions
Adaptation rules:
- If problem-analysis gates < 4/6 → Phase 1 extends to 45 days, heavy on customer discovery
- If financial-projections shows founder runway < 6 months → Compress to 60-day plan, cut non-essential actions
- If timing-analysis rated market window as CLOSING (< 3 months) or CLOSED → Compress Phase 1 to 2 weeks, accelerate everything
- If founder-fit shows time budget < 15 hrs/week → Reduce weekly actions to 3-4, extend timeline to 120 days
End-to-End Flow
STEP 0 — CONTEXT GATHERING
Extract from the user's input:
- The business idea (what it does, who it's for)
- Current stage (idea, MVP, live product)
- Available prior analysis (list all skill outputs available in session)
- Founder constraints (time per week, budget, skills, team size)
- Launch urgency (market window, personal timeline)
If critical context is missing (no idea description, no founder constraints), ask ONE clarifying question bundling all gaps. Otherwise, proceed.
STEP 1 — SYNTHESIS & PLAN ARCHITECTURE
Review all available prior analysis and construct the plan architecture:
- Identify validation gaps — what's unproven that the plan must address?
- Identify assets — what's already validated that the plan can build on?
- Determine plan intensity — based on founder constraints and urgency
- Set phase durations — adjust from default 30/30/30 based on context
- Define success metrics — what does "done" look like for each phase?
STEP 2 — PLAN GENERATION
Build the week-by-week plan with deliverables, decision gates, and kill criteria.
STEP 3 — OUTPUT
Produce the full report using the template below.
Output Template
# LAUNCH PLAN: [Product/Idea Name]
Plan date: [date]
Stage: [Idea / MVP / Live Product]
Plan duration: [60 / 90 / 120 days — adjusted for context]
Weekly founder hours: [Estimated — e.g., "20 hrs/week" or "full-time"]
Prior analysis consumed: [List skills run in session, or "Standalone — no prior analysis"]
---
## PLAN OVERVIEW
**What this plan achieves:**
[2-3 sentences — what the founder will have at the end of 90 days. Be concrete: "10 paying customers, validated pricing, functioning product, and a repeatable acquisition channel" not "a launched business"]
**Key assumptions this plan rests on:**
1. [Critical assumption — what must be true for this plan to work]
2. [Critical assumption]
3. [Critical assumption]
**Plan intensity:** [Aggressive / Standard / Conservative — and why]
---
## PHASE 1: VALIDATE (Days 1-30)
**Phase goal:** Prove that real people have this problem, will pay to solve it, and can be reached through a specific channel.
**Phase exit criteria** (must hit before moving to Phase 2):
- [ ] [Specific validation milestone — e.g., "10 target buyers confirm the pain in their own words"]
- [ ] [Specific milestone — e.g., "3 potential customers state willingness to pay $X/month"]
- [ ] [Specific milestone — e.g., "Primary distribution channel identified with access confirmed"]
- [ ] [Specific milestone — e.g., "Landing page live with 100+ visitors and X% email signup rate"]
### Week 1: [Week theme — e.g., "Customer Discovery Sprint"]
| Day(s) | Action | Deliverable | Time Est. |
|--------|--------|-------------|-----------|
| 1-2 | [Specific action] | [Tangible output] | [hours] |
| 3-4 | [Specific action] | [Tangible output] | [hours] |
| 5-7 | [Specific action] | [Tangible output] | [hours] |
**Week 1 checkpoint:** [What you should know by end of week — a specific question answered]
### Week 2: [Week theme]
| Day(s) | Action | Deliverable | Time Est. |
|--------|--------|-------------|-----------|
| 8-9 | [Specific action] | [Tangible output] | [hours] |
| 10-11 | [Specific action] | [Tangible output] | [hours] |
| 12-14 | [Specific action] | [Tangible output] | [hours] |
**Week 2 checkpoint:** [What you should know by end of week]
### Week 3: [Week theme]
| Day(s) | Action | Deliverable | Time Est. |
|--------|--------|-------------|-----------|
| 15-17 | [Specific action] | [Tangible output] | [hours] |
| 18-19 | [Specific action] | [Tangible output] | [hours] |
| 20-21 | [Specific action] | [Tangible output] | [hours] |
**Week 3 checkpoint:** [What you should know by end of week]
### Week 4: [Week theme]
| Day(s) | Action | Deliverable | Time Est. |
|--------|--------|-------------|-----------|
| 22-24 | [Specific action] | [Tangible output] | [hours] |
| 25-26 | [Specific action] | [Tangible output] | [hours] |
| 27-30 | [Specific action] | [Tangible output] | [hours] |
**Week 4 checkpoint:** [What you should know by end of week]
### DECISION GATE 1 (Day 30)
**Question:** Is the problem validated with enough evidence to build?
| Signal | Threshold | Actual | Pass/Fail |
|--------|-----------|--------|-----------|
| Customer conversations completed | ≥10 | [_] | |
| Confirmed pain (unprompted) | ≥7/10 | [_] | |
| Stated willingness to pay | ≥5/10 | [_] | |
| Landing page signup rate | ≥5% | [_] | |
| Distribution channel access | Confirmed | [_] | |
**If PASS:** Proceed to Phase 2.
**If MARGINAL (3-4/5):** Extend Phase 1 by 2 weeks, focus on failing signals.
**If FAIL (<3/5):** KILL or PIVOT. [Specific guidance on what to do]
---
## PHASE 2: BUILD & TEST (Days 31-60)
**Phase goal:** Build the minimum product, get it into real users' hands, and test the core value proposition with actual usage.
**Phase exit criteria:**
- [ ] [Specific milestone — e.g., "MVP live and functional"]
- [ ] [Specific milestone — e.g., "10 beta users actively using the product"]
- [ ] [Specific milestone — e.g., "First payment processed (even if discounted)"]
- [ ] [Specific milestone — e.g., "Core retention metric: X% of users return in Week 2"]
### Week 5: [Week theme — e.g., "MVP Sprint Start"]
| Day(s) | Action | Deliverable | Time Est. |
|--------|--------|-------------|-----------|
| 31-33 | [Specific action] | [Tangible output] | [hours] |
| 34-35 | [Specific action] | [Tangible output] | [hours] |
| 36-37 | [Specific action] | [Tangible output] | [hours] |
**Week 5 checkpoint:** [What you should know by end of week]
### Week 6: [Week theme]
[Same structure]
### Week 7: [Week theme]
[Same structure]
### Week 8: [Week theme]
[Same structure]
### DECISION GATE 2 (Day 60)
**Question:** Does the product deliver value that users will pay for?
| Signal | Threshold | Actual | Pass/Fail |
|--------|-----------|--------|-----------|
| Beta users active | ≥10 | [_] | |
| Users reporting value | ≥7/10 | [_] | |
| Payment conversion (even early) | ≥1 | [_] | |
| Retention (Week 2 return) | ≥40% | [_] | |
| NPS or satisfaction signal | Positive | [_] | |
**If PASS:** Proceed to Phase 3.
**If MARGINAL:** Fix the weakest signal. Extend Phase 2 by 2 weeks.
**If FAIL:** Evaluate pivot options. [Specific guidance]
---
## PHASE 3: LAUNCH & GROW (Days 61-90)
**Phase goal:** Public launch, first paying customers from organic channels, repeatable acquisition motion established.
**Phase exit criteria:**
- [ ] [Specific milestone — e.g., "$1K MRR or 10 paying customers"]
- [ ] [Specific milestone — e.g., "Primary acquisition channel producing consistent leads"]
- [ ] [Specific milestone — e.g., "Customer retention above X% at 30 days"]
- [ ] [Specific milestone — e.g., "Unit economics validated: LTV > 3x CAC"]
### Week 9: [Week theme — e.g., "Launch Preparation"]
[Same structure]
### Week 10: [Week theme — e.g., "Public Launch"]
[Same structure]
### Week 11: [Week theme — e.g., "Post-Launch Optimization"]
[Same structure]
### Week 12: [Week theme — e.g., "Growth Foundation"]
[Same structure]
### DECISION GATE 3 (Day 90)
**Question:** Is this a business worth continuing?
| Signal | Threshold | Actual | Pass/Fail |
|--------|-----------|--------|-----------|
| Paying customers | ≥10 | [_] | |
| MRR | ≥$500 | [_] | |
| Organic acquisition | Repeatable | [_] | |
| Customer satisfaction | Positive | [_] | |
| Founder energy | Sustainable | [_] | |
**If PASS:** Continue — build the 6-month growth plan.
**If MARGINAL:** Identify the bottleneck. Give yourself 30 more days on the weakest signal.
**If FAIL:** Honest evaluation time. [Specific kill/pivot/persist guidance]
---
## KILL CRITERIA
**Kill this idea at any point if:**
1. [Specific kill signal — e.g., "30 customer conversations and <3 confirm the pain unprompted"]
2. [Specific kill signal — e.g., "Nobody converts to paid after 60 days of free usage"]
3. [Specific kill signal — e.g., "Primary distribution channel proves inaccessible or too expensive"]
4. [Specific kill signal — e.g., "Founder runway drops below 3 months with no revenue"]
5. [Specific kill signal — e.g., "A well-funded competitor launches identical product with better distribution"]
**Killing is not failing.** Killing a bad idea in 30 days to pursue a better one is the highest-leverage action a bootstrapper can take. The plan is designed to produce a kill signal FAST — before you've invested months of building.
---
## TOOLS & RESOURCES
| Category | Tool/Resource | Cost | When Needed |
|----------|-------------|------|-------------|
| **Landing page** | [Specific tool] | [$/mo or free] | Week 1 |
| **Email capture** | [Specific tool] | [$/mo or free] | Week 1-2 |
| **MVP building** | [Specific tool/approach] | [$/mo or free] | Week 5-8 |
| **Analytics** | [Specific tool] | [$/mo or free] | Week 1 |
| **Payment processing** | [Specific tool] | [% per transaction] | Week 7-8 |
| **Customer communication** | [Specific tool] | [$/mo or free] | Week 1 |
| **SEO/Content** | [Specific tool] | [$/mo or free] | Week 9+ |
| **Social/Community** | [Specific platforms] | Free | Week 1 |
| **Domain/Hosting** | [Specific service] | [$/mo] | Week 1 |
---
## 90-DAY BUDGET ESTIMATE
| Category | Month 1 | Month 2 | Month 3 | Total |
|----------|---------|---------|---------|-------|
| Tools & subscriptions | $[_] | $[_] | $[_] | $[_] |
| Paid marketing (if any) | $[_] | $[_] | $[_] | $[_] |
| Domain, hosting, infrastructure | $[_] | $[_] | $[_] | $[_] |
| Other (legal, design, etc.) | $[_] | $[_] | $[_] | $[_] |
| **TOTAL** | **$[_]** | **$[_]** | **$[_]** | **$[_]** |
**Budget philosophy:** Spend as little as possible in Month 1 (validation should be nearly free). Increase in Month 2 only if validation passes. Month 3 is the first real marketing spend.
---
## BOTTOM LINE
**Your 90-day mission:** [One sentence — the concrete outcome this plan produces]
**The honest answer about execution:** [One sentence — is this plan achievable given the founder's constraints? What's the biggest execution risk?]
**If you only do 3 things from this entire plan:**
1. [The single most important validation action]
2. [The single most important building action]
3. [The single most important distribution action]
Important Rules
See _shared/philosophy.md Universal Skill Rules.
Skill-specific rules:
- Every action must have a deliverable — "Research the market" is not an action. "Interview 10 target buyers and document their top 3 pain points in a spreadsheet" is. If it doesn't produce a tangible output, it's not a task.
- Time estimates are mandatory — founders need to know if this is a 5-hour week or a 40-hour week. Be realistic about time requirements.
- Decision gates are non-negotiable — every phase ends with a go/no-go decision. Without gates, founders drift into building mode without validation.
- Kill criteria save lives — or at least months. The plan must include specific, measurable signals that mean "stop." This is the hardest part for founders and the most valuable.
- Adapt to prior analysis — if dimension skills revealed specific risks, the plan must address them. If validation is already strong (high gate pass rates), Phase 1 can be compressed. If evidence is thin, Phase 1 extends.
- Budget must be explicit — founders need to know the cash requirement before they start. Hidden costs kill bootstrapped businesses.
- This is a Meta skill — it synthesizes all prior skill outputs into a sequenced execution plan. No validation gates, no digest mode. The output is a complete roadmap.
- No building in Phase 1 — validation always comes first. If the plan has "build MVP" in Week 1, something is wrong. The exception is when prior analysis already validated the problem and customer (gates passed).
- Standalone must work — when run without prior analysis, the plan must include its own validation activities. It will be less precise but still functional.
1---2name: launch-plan3description: 30/60/90-day execution roadmap for bootstrapped founders. Synthesizes all prior analysis into a chronological plan with weekly action items, deliverables, decision gates, kill criteria, tools/budget, and phase exit criteria. Best after running dimension skills. Use when user runs `/launch-plan`, asks about "launch plan", "execution roadmap", "what do I do first", "90-day plan", "action plan", "next steps", "how to launch", or needs a concrete step-by-step execution plan.4---56# Launch Plan — 30/60/90-Day Execution Roadmap78Converts analysis into action. Produces a chronological execution plan that tells the founder exactly what to do each week for the next 90 days — from validation through launch and early growth. Most powerful after running dimension skills; works standalone too.910## Philosophy1112**Plans without deadlines are daydreams. Actions without sequence are chaos.** Founders don't fail because they lack analysis — they fail because they can't convert analysis into a sequenced, time-bound execution plan. This skill is the bridge between "I know what to build" and "I built it and people are paying."1314Read `.claude/skills/_shared/philosophy.md` for the full bottleneck shift and bootstrapper framework. For launch planning specifically:1516**The bootstrapper launch reality:**17- You don't have a team. Every action item must be doable by 1-2 people.18- Cash is finite. Every spend must be justified against timeline to revenue.19- Speed is the advantage. The plan should be aggressive — 90 days, not 12 months.20- Validation before building. The plan front-loads customer evidence, not product development.21- Kill criteria are essential. A good plan includes when to STOP, not just what to START.2223**Phase philosophy:**24- **Days 1-30 (Validate)**: Prove the problem, customer, and willingness to pay are real. NO product building.25- **Days 31-60 (Build & Test)**: Build the minimum product that tests the core value proposition. Ship to early users.26- **Days 61-90 (Launch & Grow)**: Public launch, first paying customers, initial distribution. Revenue or a clear kill decision.2728**What makes this different from generic roadmaps:**29- Every action has a concrete deliverable (not "research the market" but "interview 10 target buyers and document their top 3 pain points")30- Decision gates force go/no-go choices at key moments31- Kill criteria prevent founders from pouring 6 months into a dead idea32- Budget is explicit — founders know what they'll spend before they start33- The plan adapts to prior analysis — if `/problem-analysis` found weak evidence, Week 1 focuses on validation3435## Reference Books3637Check `references/INDEX.md` for relevant frameworks. Key books for launch planning:3839- **lean-startup** (Ries) — Build-measure-learn loop structures the validation phase; MVP definition for Phase 2 scoping; innovation accounting for decision gates; pivot-or-persevere framework for kill criteria40- **startup-owners-manual** (Blank & Dorf) — Customer development methodology for Phase 1 (discovery before building); earlyvangelists as the first customers to target; channel strategy for Phase 3 launch41- **shape-up** (Singer) — Fixed-time, variable-scope approach for the build phase; 6-week cycle concept adapted to 30-day phases; appetite setting before building; circuit breaker principle for kill decisions42- **getting-real** (37signals) — "Launch fast" philosophy; Hollywood launch technique for Phase 3; build less and ship sooner; epicenter design for deciding what to build first in the MVP sprint43- **traction-weinberg** (Weinberg & Mares) — Bullseye framework for channel testing in Phase 3; the 50% rule (spend half effort on distribution); 19 channels as the menu for launch distribution tactics44- **mom-test** (Fitzpatrick) — Customer interview methodology for Phase 1 validation activities; how to structure the customer conversations that decision gates depend on45- **profit-first** (Michalowicz) — Budget allocation framework for the 90-day budget section; Profit First formula for making the financial plan sustainable from day one4647## Research-First Protocol4849This skill is primarily a synthesis skill — it consumes prior analysis more than it generates new research. However, when run standalone:5051**Quick research tasks:**52- "[product category] launch strategy" / "how to launch [product type]"53- "[product category] tools and costs" (for budget estimation)54- "[target market] communities" / "[target market] events" (for launch channels)55- Check competitor launch stories on Product Hunt, IndieHackers, Hacker News5657**Consume prior intelligence (CRITICAL):** This skill is designed to run AFTER dimension skills. Pull from:58- **problem-analysis**: Validation status, customer discovery recommendations, weak gates to address59- **gtm-strategy**: Channel strategy, first 100 customers plan, distribution economics60- **competitor-analysis**: Competitive wedge, customers to steal, positioning strategy61- **solution-analysis**: MPA (Minimum Product Achievability), time-to-value, differentiation62- **financial-projections**: Break-even timeline, startup costs, founder sustainability63- **business-model**: Revenue model, pricing strategy, monetization approach64- **market-size**: Beachhead market, demand signals65- **founder-fit**: Time budget, financial runway, execution tempo, critical gaps66- **timing-analysis**: Market window, entry timing urgency67- **moat-analysis**: What to invest in for long-term defensibility68- **user-personas**: Primary buyer targeting criteria, buying triggers (if run)69- **positioning**: Homepage copy, messaging, language bank (if run)70- **content-strategy**: Content calendar, keyword targets, distribution checklist (if run)71- **risk-assessment**: Top risks and mitigations (if run)72- **bootstrap-oracle / analyze-idea**: Overall verdict, scoring, recommended actions7374**Adaptation rules:**75- If problem-analysis gates < 4/6 → Phase 1 extends to 45 days, heavy on customer discovery76- If financial-projections shows founder runway < 6 months → Compress to 60-day plan, cut non-essential actions77- If timing-analysis rated market window as CLOSING (< 3 months) or CLOSED → Compress Phase 1 to 2 weeks, accelerate everything78- If founder-fit shows time budget < 15 hrs/week → Reduce weekly actions to 3-4, extend timeline to 120 days7980## End-to-End Flow8182### STEP 0 — CONTEXT GATHERING8384Extract from the user's input:85- The business idea (what it does, who it's for)86- Current stage (idea, MVP, live product)87- Available prior analysis (list all skill outputs available in session)88- Founder constraints (time per week, budget, skills, team size)89- Launch urgency (market window, personal timeline)9091If critical context is missing (no idea description, no founder constraints), ask ONE clarifying question bundling all gaps. Otherwise, proceed.9293### STEP 1 — SYNTHESIS & PLAN ARCHITECTURE9495Review all available prior analysis and construct the plan architecture:96971. **Identify validation gaps** — what's unproven that the plan must address?982. **Identify assets** — what's already validated that the plan can build on?993. **Determine plan intensity** — based on founder constraints and urgency1004. **Set phase durations** — adjust from default 30/30/30 based on context1015. **Define success metrics** — what does "done" look like for each phase?102103### STEP 2 — PLAN GENERATION104105Build the week-by-week plan with deliverables, decision gates, and kill criteria.106107### STEP 3 — OUTPUT108109Produce the full report using the template below.110111## Output Template112113```114# LAUNCH PLAN: [Product/Idea Name]115116Plan date: [date]117Stage: [Idea / MVP / Live Product]118Plan duration: [60 / 90 / 120 days — adjusted for context]119Weekly founder hours: [Estimated — e.g., "20 hrs/week" or "full-time"]120Prior analysis consumed: [List skills run in session, or "Standalone — no prior analysis"]121122---123124## PLAN OVERVIEW125126**What this plan achieves:**127[2-3 sentences — what the founder will have at the end of 90 days. Be concrete: "10 paying customers, validated pricing, functioning product, and a repeatable acquisition channel" not "a launched business"]128129**Key assumptions this plan rests on:**1301. [Critical assumption — what must be true for this plan to work]1312. [Critical assumption]1323. [Critical assumption]133134**Plan intensity:** [Aggressive / Standard / Conservative — and why]135136---137138## PHASE 1: VALIDATE (Days 1-30)139140**Phase goal:** Prove that real people have this problem, will pay to solve it, and can be reached through a specific channel.141142**Phase exit criteria** (must hit before moving to Phase 2):143- [ ] [Specific validation milestone — e.g., "10 target buyers confirm the pain in their own words"]144- [ ] [Specific milestone — e.g., "3 potential customers state willingness to pay $X/month"]145- [ ] [Specific milestone — e.g., "Primary distribution channel identified with access confirmed"]146- [ ] [Specific milestone — e.g., "Landing page live with 100+ visitors and X% email signup rate"]147148### Week 1: [Week theme — e.g., "Customer Discovery Sprint"]149150| Day(s) | Action | Deliverable | Time Est. |151|--------|--------|-------------|-----------|152| 1-2 | [Specific action] | [Tangible output] | [hours] |153| 3-4 | [Specific action] | [Tangible output] | [hours] |154| 5-7 | [Specific action] | [Tangible output] | [hours] |155156**Week 1 checkpoint:** [What you should know by end of week — a specific question answered]157158### Week 2: [Week theme]159160| Day(s) | Action | Deliverable | Time Est. |161|--------|--------|-------------|-----------|162| 8-9 | [Specific action] | [Tangible output] | [hours] |163| 10-11 | [Specific action] | [Tangible output] | [hours] |164| 12-14 | [Specific action] | [Tangible output] | [hours] |165166**Week 2 checkpoint:** [What you should know by end of week]167168### Week 3: [Week theme]169170| Day(s) | Action | Deliverable | Time Est. |171|--------|--------|-------------|-----------|172| 15-17 | [Specific action] | [Tangible output] | [hours] |173| 18-19 | [Specific action] | [Tangible output] | [hours] |174| 20-21 | [Specific action] | [Tangible output] | [hours] |175176**Week 3 checkpoint:** [What you should know by end of week]177178### Week 4: [Week theme]179180| Day(s) | Action | Deliverable | Time Est. |181|--------|--------|-------------|-----------|182| 22-24 | [Specific action] | [Tangible output] | [hours] |183| 25-26 | [Specific action] | [Tangible output] | [hours] |184| 27-30 | [Specific action] | [Tangible output] | [hours] |185186**Week 4 checkpoint:** [What you should know by end of week]187188### DECISION GATE 1 (Day 30)189190**Question:** Is the problem validated with enough evidence to build?191192| Signal | Threshold | Actual | Pass/Fail |193|--------|-----------|--------|-----------|194| Customer conversations completed | ≥10 | [_] | |195| Confirmed pain (unprompted) | ≥7/10 | [_] | |196| Stated willingness to pay | ≥5/10 | [_] | |197| Landing page signup rate | ≥5% | [_] | |198| Distribution channel access | Confirmed | [_] | |199200**If PASS:** Proceed to Phase 2.201**If MARGINAL (3-4/5):** Extend Phase 1 by 2 weeks, focus on failing signals.202**If FAIL (<3/5):** KILL or PIVOT. [Specific guidance on what to do]203204---205206## PHASE 2: BUILD & TEST (Days 31-60)207208**Phase goal:** Build the minimum product, get it into real users' hands, and test the core value proposition with actual usage.209210**Phase exit criteria:**211- [ ] [Specific milestone — e.g., "MVP live and functional"]212- [ ] [Specific milestone — e.g., "10 beta users actively using the product"]213- [ ] [Specific milestone — e.g., "First payment processed (even if discounted)"]214- [ ] [Specific milestone — e.g., "Core retention metric: X% of users return in Week 2"]215216### Week 5: [Week theme — e.g., "MVP Sprint Start"]217218| Day(s) | Action | Deliverable | Time Est. |219|--------|--------|-------------|-----------|220| 31-33 | [Specific action] | [Tangible output] | [hours] |221| 34-35 | [Specific action] | [Tangible output] | [hours] |222| 36-37 | [Specific action] | [Tangible output] | [hours] |223224**Week 5 checkpoint:** [What you should know by end of week]225226### Week 6: [Week theme]227[Same structure]228229### Week 7: [Week theme]230[Same structure]231232### Week 8: [Week theme]233[Same structure]234235### DECISION GATE 2 (Day 60)236237**Question:** Does the product deliver value that users will pay for?238239| Signal | Threshold | Actual | Pass/Fail |240|--------|-----------|--------|-----------|241| Beta users active | ≥10 | [_] | |242| Users reporting value | ≥7/10 | [_] | |243| Payment conversion (even early) | ≥1 | [_] | |244| Retention (Week 2 return) | ≥40% | [_] | |245| NPS or satisfaction signal | Positive | [_] | |246247**If PASS:** Proceed to Phase 3.248**If MARGINAL:** Fix the weakest signal. Extend Phase 2 by 2 weeks.249**If FAIL:** Evaluate pivot options. [Specific guidance]250251---252253## PHASE 3: LAUNCH & GROW (Days 61-90)254255**Phase goal:** Public launch, first paying customers from organic channels, repeatable acquisition motion established.256257**Phase exit criteria:**258- [ ] [Specific milestone — e.g., "$1K MRR or 10 paying customers"]259- [ ] [Specific milestone — e.g., "Primary acquisition channel producing consistent leads"]260- [ ] [Specific milestone — e.g., "Customer retention above X% at 30 days"]261- [ ] [Specific milestone — e.g., "Unit economics validated: LTV > 3x CAC"]262263### Week 9: [Week theme — e.g., "Launch Preparation"]264[Same structure]265266### Week 10: [Week theme — e.g., "Public Launch"]267[Same structure]268269### Week 11: [Week theme — e.g., "Post-Launch Optimization"]270[Same structure]271272### Week 12: [Week theme — e.g., "Growth Foundation"]273[Same structure]274275### DECISION GATE 3 (Day 90)276277**Question:** Is this a business worth continuing?278279| Signal | Threshold | Actual | Pass/Fail |280|--------|-----------|--------|-----------|281| Paying customers | ≥10 | [_] | |282| MRR | ≥$500 | [_] | |283| Organic acquisition | Repeatable | [_] | |284| Customer satisfaction | Positive | [_] | |285| Founder energy | Sustainable | [_] | |286287**If PASS:** Continue — build the 6-month growth plan.288**If MARGINAL:** Identify the bottleneck. Give yourself 30 more days on the weakest signal.289**If FAIL:** Honest evaluation time. [Specific kill/pivot/persist guidance]290291---292293## KILL CRITERIA294295**Kill this idea at any point if:**2961. [Specific kill signal — e.g., "30 customer conversations and <3 confirm the pain unprompted"]2972. [Specific kill signal — e.g., "Nobody converts to paid after 60 days of free usage"]2983. [Specific kill signal — e.g., "Primary distribution channel proves inaccessible or too expensive"]2994. [Specific kill signal — e.g., "Founder runway drops below 3 months with no revenue"]3005. [Specific kill signal — e.g., "A well-funded competitor launches identical product with better distribution"]301302**Killing is not failing.** Killing a bad idea in 30 days to pursue a better one is the highest-leverage action a bootstrapper can take. The plan is designed to produce a kill signal FAST — before you've invested months of building.303304---305306## TOOLS & RESOURCES307308| Category | Tool/Resource | Cost | When Needed |309|----------|-------------|------|-------------|310| **Landing page** | [Specific tool] | [$/mo or free] | Week 1 |311| **Email capture** | [Specific tool] | [$/mo or free] | Week 1-2 |312| **MVP building** | [Specific tool/approach] | [$/mo or free] | Week 5-8 |313| **Analytics** | [Specific tool] | [$/mo or free] | Week 1 |314| **Payment processing** | [Specific tool] | [% per transaction] | Week 7-8 |315| **Customer communication** | [Specific tool] | [$/mo or free] | Week 1 |316| **SEO/Content** | [Specific tool] | [$/mo or free] | Week 9+ |317| **Social/Community** | [Specific platforms] | Free | Week 1 |318| **Domain/Hosting** | [Specific service] | [$/mo] | Week 1 |319320---321322## 90-DAY BUDGET ESTIMATE323324| Category | Month 1 | Month 2 | Month 3 | Total |325|----------|---------|---------|---------|-------|326| Tools & subscriptions | $[_] | $[_] | $[_] | $[_] |327| Paid marketing (if any) | $[_] | $[_] | $[_] | $[_] |328| Domain, hosting, infrastructure | $[_] | $[_] | $[_] | $[_] |329| Other (legal, design, etc.) | $[_] | $[_] | $[_] | $[_] |330| **TOTAL** | **$[_]** | **$[_]** | **$[_]** | **$[_]** |331332**Budget philosophy:** Spend as little as possible in Month 1 (validation should be nearly free). Increase in Month 2 only if validation passes. Month 3 is the first real marketing spend.333334---335336## BOTTOM LINE337338**Your 90-day mission:** [One sentence — the concrete outcome this plan produces]339340**The honest answer about execution:** [One sentence — is this plan achievable given the founder's constraints? What's the biggest execution risk?]341342**If you only do 3 things from this entire plan:**3431. [The single most important validation action]3442. [The single most important building action]3453. [The single most important distribution action]346```347348## Important Rules349350See `_shared/philosophy.md` Universal Skill Rules.351352**Skill-specific rules:**353- **Every action must have a deliverable** — "Research the market" is not an action. "Interview 10 target buyers and document their top 3 pain points in a spreadsheet" is. If it doesn't produce a tangible output, it's not a task.354- **Time estimates are mandatory** — founders need to know if this is a 5-hour week or a 40-hour week. Be realistic about time requirements.355- **Decision gates are non-negotiable** — every phase ends with a go/no-go decision. Without gates, founders drift into building mode without validation.356- **Kill criteria save lives** — or at least months. The plan must include specific, measurable signals that mean "stop." This is the hardest part for founders and the most valuable.357- **Adapt to prior analysis** — if dimension skills revealed specific risks, the plan must address them. If validation is already strong (high gate pass rates), Phase 1 can be compressed. If evidence is thin, Phase 1 extends.358- **Budget must be explicit** — founders need to know the cash requirement before they start. Hidden costs kill bootstrapped businesses.359- **This is a Meta skill** — it synthesizes all prior skill outputs into a sequenced execution plan. No validation gates, no digest mode. The output is a complete roadmap.360- **No building in Phase 1** — validation always comes first. If the plan has "build MVP" in Week 1, something is wrong. The exception is when prior analysis already validated the problem and customer (gates passed).361- **Standalone must work** — when run without prior analysis, the plan must include its own validation activities. It will be less precise but still functional.