Brazil Offshore Infrastructure and Market
Use this skill to state what is public, what is UNKNOWN and how big the gas and host effects are, before they enter a Brazilian block evaluation. The packaged data is a snapshot of 2026-10-14 and goes stale.
When to Use
- A Brazilian pre-salt block or tie-back needs gas export routes, plants, tariffs, gas quality or market context.
- A report must separate public facts from declared assumptions and list every UNKNOWN.
- A host FPSO's capacity must be checked for a tie-back, including a gas-handling limit.
Inputs
- Declared gas CO2 (mol %), GOR (Sm3/Sm3), recoverable oil volume (MMbbl), export fraction, city-gate price.
- Host nameplate, host demand and, if known, the oil rate at which host compression limits (kbbl/d).
- Entry name for dataset lookups (for example
Rota 3, Bacalhau).
Outputs
- Dataset entries with value, unit,
source_id, confidence (official, company, press, estimate, declared, UNKNOWN) and as_of.
- CO2 removal fraction, wellhead net-back, gas export revenue and share of oil revenue, host ullage and binding constraint.
- The explicit list of UNKNOWN entries to quote in the report.
Engineering Method
Source-id convention: INF-S<n> for the infrastructure file and MKT-S<n> for the market file; sources() resolves each id to a URL. null value or confidence UNKNOWN is a gap, never zero.
Routes and plants
- Rota 1 (Tupi to Mexilhao to UTGCA Caraguatatuba): 10 MMm3/d, about 359 km, since 2011. Rota 2 (to UTGCAB Cabiunas): 20 MMm3/d, 401 km, 24 in, since 2016 (official). Rota 3 (to Boaventura/GASLUB Itaborai): 18 MMm3/d, 355 km, commercial from Sep-Nov 2024.
- Rota 4A/4B (Cosan/Compass, about 21 MMm3/d): proposed, start year UNKNOWN, outside the EPE PDE 2035 base case. Planned export pipelines in EPE: Raia (16 MMm3/d, 2028; about 200 km to Cabiunas per the Equinor record) and SEAP (18 MMm3/d, 2030-32). Rota 5/6/SPA: UNKNOWN.
- Plants: UTGCAB Cabiunas 25.2 MMm3/d, Boaventura 21 MMm3/d (two modules), UTGCA capacity UNKNOWN, national fleet 120.1 MMm3/d (about 90 % Petrobras). Spare capacity per route and plant: UNKNOWN.
- Bacalhau FPSO: 220 kbopd, 530 MMscfd (about 15 MMm3/d) gas handling, no export pipeline in Phase 1 (associated gas re-injected); Phase 2 pipeline route UNKNOWN.
Tariff status
- No numeric offshore escoamento, processing or transport tariff (Rota 1/2/3, UTG, NTS, TAG, TBG) is public; they are negotiated bilaterally or published on dynamic pages.
- The only number is the MME estimate that escoamento plus processing is 46 % of the delivered gas price (INF-S20, press).
wellhead_netback applies it; it is not a tariff.
- City gate: EPE PDE 2035 shows 10.4-11.8 and 15.0-16.5 USD/MMBtu series (labelling ambiguous). Contracts are mostly indexed to Brent and/or Henry Hub.
Third-party access
ANP approved a 45-day consultation on 2026-07-10 for a draft resolution on negotiated, non-discriminatory access to escoamento pipelines and processing plants; owner preference right ends 30 years after start-up. It covers pipelines and plants, not FPSO topsides. A tie-back to an FPSO is a commercial deal with the host, not regulated access.
Gas specification
ANP Res 16/2008: CO2 max 3.0 mol %, total sulphur 70 mg/m3, H2S 10 mg/m3 (SE/S/CO), water dew point -45 C (SE/S/CO), Wobbe 46,500-53,500 kJ/m3. Res 982/2025 adds methane and ethane limits with a pre-salt waiver; ANP refused Petrobras's Itaborai waiver on 2026-10-02. Declared pre-salt gas CO2 is 6-34 mol %, so export needs membranes or similar and the base case re-injects. Use co2_removal_fraction.
Oil marketing
No oil pipelines: oil leaves by FPSO and shuttle tanker. PPSA markets the Union profit oil; the contractor owns cost oil and its profit-oil share. ANP reference prices (Aug 2026, about 63-85 USD/bbl by field) and PPSA spot differentials (-7.4 to +4.7 USD/bbl to Dated Brent) are in the market file. Crude differential for a new block and shuttle-tanker cost: UNKNOWN.
Market
Brazil produced 4.50 MMbbl/d oil and 215 MMSm3/d gas in Jul 2026 (pre-salt 82 % of boe). EPE PDE 2035: potential integrated-grid gas supply 128 to 169 MMm3/d, gross gas 299 MMSm3/d in 2035, net/gross about 42 % (derived). Gas export was about 8 % of oil revenue in the 2026-10-14 evaluation (5.9 USD/MMBtu net-back, 50 % exportable): a small upside next to oil.
Regulation
Gas Law 14.134/2021 (entry-exit, ANP-approved tariffs), Lei 12.351/2010 (unitisation via AIP; Rodocrosita is flagged non-unitisable in the edital while Bacalhau is a shared deposit under an AIP), Repetro-Sped (Lei 13.586/2017), SBCE carbon market (Lei 15.042/2024, caps and price UNKNOWN), corporate tax 34 % (estimate, not verified).
Host capacity
A host's oil nameplate is not its ullage. Gas handling or compression can bind first, so a tie-back competes for gas capacity. Pass the host-owner or process-model limit to host_capacity_check; without it the result is nameplate-only and says so. Public Bacalhau facts: 220 kbopd nameplate, 102.5 kbd in Jul 2026 (ANP bulletin, about 34 kbd per producer on the three producing wells reported).
Python Usage Pattern
import brazil_offshore_infrastructure_market as bim
bim.co2_removal_fraction(19.5) # 0.17 of gas moles to reach 3 mol %
nb = bim.wellhead_netback(11.0) # 5.94 USD/MMBtu (MME 46 % share)
up = bim.gas_export_upside(350, 325, 0.5, nb, oil_net_price_usd_bbl=65) # about 8.5 % of oil revenue
chk = bim.host_capacity_check(220, 102.5, compression_limit_kbd=123, additional_demand_kbd=30)
bim.find("Rota 3", section="pipelines") # entries with source ids
bim.unknown_entries() # quote these as UNKNOWN
bim.dataset_age_days() # warn when the snapshot is old
Neighbouring discoveries
Host capacity and gas-export routes only matter next to the discoveries that compete for them. For a Brazilian
target list the nearby fields, evaluation-plan areas and discovery candidates with
neqsim-near-field-discoveries (brazil_records, near_field, plot_near_field) before ranking hosts, and
carry the in-development and in-evaluation neighbours into host_capacity_check as demand on the same host or
export line. ANP gives no discovery volumes: take them from the operator and record the source.
Validation Checklist
Common Mistakes
| Symptom |
Cause |
Fix |
| Gas export treated as a large upside |
Tariff-free gas price used at the wellhead |
Apply the MME net-back; gas is about 8 % of oil revenue |
| Tie-back fits on paper |
Oil nameplate used as ullage |
Check the compression or gas-handling limit |
| Third-party access cited for an FPSO tie-back |
Draft resolution covers pipelines and plants only |
Treat as a commercial negotiation |
| UNKNOWN shown as 0 |
value null read as a number |
Use is_unknown and print UNKNOWN |
| Pre-salt gas assumed export-ready |
CO2 6-34 mol % against a 3 mol % spec |
Include CO2 removal or re-injection |
Limitations
- Snapshot of public sources read on 2026-10-14; confidence ranges from official to press and estimate. Re-check before use.
- No numeric offshore tariff, spare route capacity, TPA terms or crude differential is available.
- Screening arithmetic only; not a gas commercialisation or regulatory opinion.
Related NeqSim Functionality
neqsim.thermo.system.SystemPrEos or SystemSrkEos for gas CO2 and dew points behind the declared fluid; neqsim.process.equipment.pipeline.PipeBeggsAndBrills for tie-back hydraulics.
neqsim.process.fielddevelopment.tieback.HostSynergyScreening for host ullage cover; this skill supplies public inputs and the gas-handling check.
- Tuned fluid recipe: nested bisection on the C7+ amount and a common density offset on the TBP cuts (never molar masses); feed CO2 0.04/0.14/0.30 gave gas CO2 6.5/19.5/34.1 mol % at GOR 325 Sm3/Sm3, 31.5 API.
- Chain with
neqsim-psc-bid-economics-screening, neqsim-anp-open-data, neqsim-brazil-presalt-analogue-basis, neqsim-production-optimization and neqsim-reservoir-facility-value-chain.
References
- ANP Res 16/2008, Res 982/2025; Lei 14.134/2021, 12.351/2010, 13.586/2017, 15.042/2024.
- EPE PDE 2035 (gas, production, international prices), Petrobras route pages, Equinor and MODEC Bacalhau pages, ANP bulletin Jul 2026 and PPSA spot sales; URLs in
sources().
1---2name: neqsim-brazil-offshore-infrastructure-market3calculation_basis: "screening"4version: "0.1.0"5description: "Public data and helpers for Brazilian offshore (Santos and Campos pre-salt) gas export routes, processing plants, tariff status, third-party access, gas spec, oil marketing and host capacity, with explicit UNKNOWNs and source ids. USE WHEN: a Brazilian block or tie-back evaluation needs gas export, CO2 removal, wellhead net-back, host ullage or market context, and no numeric offshore tariff is public."6last_verified: "2026-10-14"7requires:8 python_packages: []9 java_packages: []10 env: []11 network: []12metadata:13 source: https://skillmd.com/skills/equinor/neqsim-brazil-offshore-infrastructure-market14---1516# Brazil Offshore Infrastructure and Market1718Use this skill to state what is public, what is UNKNOWN and how big the gas and host effects are, before they enter a Brazilian block evaluation. The packaged data is a snapshot of 2026-10-14 and goes stale.1920## When to Use2122- A Brazilian pre-salt block or tie-back needs gas export routes, plants, tariffs, gas quality or market context.23- A report must separate public facts from declared assumptions and list every UNKNOWN.24- A host FPSO's capacity must be checked for a tie-back, including a gas-handling limit.2526## Inputs2728- Declared gas CO2 (mol %), GOR (Sm3/Sm3), recoverable oil volume (MMbbl), export fraction, city-gate price.29- Host nameplate, host demand and, if known, the oil rate at which host compression limits (kbbl/d).30- Entry name for dataset lookups (for example `Rota 3`, `Bacalhau`).3132## Outputs3334- Dataset entries with value, unit, `source_id`, confidence (`official`, `company`, `press`, `estimate`, `declared`, `UNKNOWN`) and `as_of`.35- CO2 removal fraction, wellhead net-back, gas export revenue and share of oil revenue, host ullage and binding constraint.36- The explicit list of UNKNOWN entries to quote in the report.3738## Engineering Method3940Source-id convention: `INF-S<n>` for the infrastructure file and `MKT-S<n>` for the market file; `sources()` resolves each id to a URL. `null` value or confidence `UNKNOWN` is a gap, never zero.4142### Routes and plants4344- Rota 1 (Tupi to Mexilhao to UTGCA Caraguatatuba): 10 MMm3/d, about 359 km, since 2011. Rota 2 (to UTGCAB Cabiunas): 20 MMm3/d, 401 km, 24 in, since 2016 (official). Rota 3 (to Boaventura/GASLUB Itaborai): 18 MMm3/d, 355 km, commercial from Sep-Nov 2024.45- Rota 4A/4B (Cosan/Compass, about 21 MMm3/d): proposed, start year UNKNOWN, outside the EPE PDE 2035 base case. Planned export pipelines in EPE: Raia (16 MMm3/d, 2028; about 200 km to Cabiunas per the Equinor record) and SEAP (18 MMm3/d, 2030-32). Rota 5/6/SPA: UNKNOWN.46- Plants: UTGCAB Cabiunas 25.2 MMm3/d, Boaventura 21 MMm3/d (two modules), UTGCA capacity UNKNOWN, national fleet 120.1 MMm3/d (about 90 % Petrobras). Spare capacity per route and plant: UNKNOWN.47- Bacalhau FPSO: 220 kbopd, 530 MMscfd (about 15 MMm3/d) gas handling, no export pipeline in Phase 1 (associated gas re-injected); Phase 2 pipeline route UNKNOWN.4849### Tariff status5051- No numeric offshore escoamento, processing or transport tariff (Rota 1/2/3, UTG, NTS, TAG, TBG) is public; they are negotiated bilaterally or published on dynamic pages.52- The only number is the MME estimate that escoamento plus processing is 46 % of the delivered gas price (INF-S20, press). `wellhead_netback` applies it; it is not a tariff.53- City gate: EPE PDE 2035 shows 10.4-11.8 and 15.0-16.5 USD/MMBtu series (labelling ambiguous). Contracts are mostly indexed to Brent and/or Henry Hub.5455### Third-party access5657ANP approved a 45-day consultation on 2026-07-10 for a draft resolution on negotiated, non-discriminatory access to escoamento pipelines and processing plants; owner preference right ends 30 years after start-up. It covers pipelines and plants, not FPSO topsides. A tie-back to an FPSO is a commercial deal with the host, not regulated access.5859### Gas specification6061ANP Res 16/2008: CO2 max 3.0 mol %, total sulphur 70 mg/m3, H2S 10 mg/m3 (SE/S/CO), water dew point -45 C (SE/S/CO), Wobbe 46,500-53,500 kJ/m3. Res 982/2025 adds methane and ethane limits with a pre-salt waiver; ANP refused Petrobras's Itaborai waiver on 2026-10-02. Declared pre-salt gas CO2 is 6-34 mol %, so export needs membranes or similar and the base case re-injects. Use `co2_removal_fraction`.6263### Oil marketing6465No oil pipelines: oil leaves by FPSO and shuttle tanker. PPSA markets the Union profit oil; the contractor owns cost oil and its profit-oil share. ANP reference prices (Aug 2026, about 63-85 USD/bbl by field) and PPSA spot differentials (-7.4 to +4.7 USD/bbl to Dated Brent) are in the market file. Crude differential for a new block and shuttle-tanker cost: UNKNOWN.6667### Market6869Brazil produced 4.50 MMbbl/d oil and 215 MMSm3/d gas in Jul 2026 (pre-salt 82 % of boe). EPE PDE 2035: potential integrated-grid gas supply 128 to 169 MMm3/d, gross gas 299 MMSm3/d in 2035, net/gross about 42 % (derived). Gas export was about 8 % of oil revenue in the 2026-10-14 evaluation (5.9 USD/MMBtu net-back, 50 % exportable): a small upside next to oil.7071### Regulation7273Gas Law 14.134/2021 (entry-exit, ANP-approved tariffs), Lei 12.351/2010 (unitisation via AIP; Rodocrosita is flagged non-unitisable in the edital while Bacalhau is a shared deposit under an AIP), Repetro-Sped (Lei 13.586/2017), SBCE carbon market (Lei 15.042/2024, caps and price UNKNOWN), corporate tax 34 % (estimate, not verified).7475### Host capacity7677A host's oil nameplate is not its ullage. Gas handling or compression can bind first, so a tie-back competes for gas capacity. Pass the host-owner or process-model limit to `host_capacity_check`; without it the result is nameplate-only and says so. Public Bacalhau facts: 220 kbopd nameplate, 102.5 kbd in Jul 2026 (ANP bulletin, about 34 kbd per producer on the three producing wells reported).7879## Python Usage Pattern8081```python82import brazil_offshore_infrastructure_market as bim8384bim.co2_removal_fraction(19.5) # 0.17 of gas moles to reach 3 mol %85nb = bim.wellhead_netback(11.0) # 5.94 USD/MMBtu (MME 46 % share)86up = bim.gas_export_upside(350, 325, 0.5, nb, oil_net_price_usd_bbl=65) # about 8.5 % of oil revenue87chk = bim.host_capacity_check(220, 102.5, compression_limit_kbd=123, additional_demand_kbd=30)88bim.find("Rota 3", section="pipelines") # entries with source ids89bim.unknown_entries() # quote these as UNKNOWN90bim.dataset_age_days() # warn when the snapshot is old91```9293## Neighbouring discoveries9495Host capacity and gas-export routes only matter next to the discoveries that compete for them. For a Brazilian96target list the nearby fields, evaluation-plan areas and discovery candidates with97`neqsim-near-field-discoveries` (`brazil_records`, `near_field`, `plot_near_field`) before ranking hosts, and98carry the in-development and in-evaluation neighbours into `host_capacity_check` as demand on the same host or99export line. ANP gives no discovery volumes: take them from the operator and record the source.100101## Validation Checklist102103- [ ] Every number quoted from the dataset carries its `source_id` and `as_of`; UNKNOWN is written as UNKNOWN.104- [ ] No tariff was invented; the net-back states it uses the MME 46 % share.105- [ ] Dataset age was checked with `dataset_age_days()` and stale values re-read from the source.106- [ ] Host ullage uses a gas-handling limit when one exists, or states that only nameplate was used.107- [ ] The gas CO2 case (low, base, high) carried into `co2_removal_fraction` matches the fluid basis.108109## Common Mistakes110111| Symptom | Cause | Fix |112| --- | --- | --- |113| Gas export treated as a large upside | Tariff-free gas price used at the wellhead | Apply the MME net-back; gas is about 8 % of oil revenue |114| Tie-back fits on paper | Oil nameplate used as ullage | Check the compression or gas-handling limit |115| Third-party access cited for an FPSO tie-back | Draft resolution covers pipelines and plants only | Treat as a commercial negotiation |116| UNKNOWN shown as 0 | `value` null read as a number | Use `is_unknown` and print UNKNOWN |117| Pre-salt gas assumed export-ready | CO2 6-34 mol % against a 3 mol % spec | Include CO2 removal or re-injection |118119## Limitations120121- Snapshot of public sources read on 2026-10-14; confidence ranges from official to press and estimate. Re-check before use.122- No numeric offshore tariff, spare route capacity, TPA terms or crude differential is available.123- Screening arithmetic only; not a gas commercialisation or regulatory opinion.124125## Related NeqSim Functionality126127- `neqsim.thermo.system.SystemPrEos` or `SystemSrkEos` for gas CO2 and dew points behind the declared fluid; `neqsim.process.equipment.pipeline.PipeBeggsAndBrills` for tie-back hydraulics.128- `neqsim.process.fielddevelopment.tieback.HostSynergyScreening` for host ullage cover; this skill supplies public inputs and the gas-handling check.129- Tuned fluid recipe: nested bisection on the C7+ amount and a common density offset on the TBP cuts (never molar masses); feed CO2 0.04/0.14/0.30 gave gas CO2 6.5/19.5/34.1 mol % at GOR 325 Sm3/Sm3, 31.5 API.130- Chain with `neqsim-psc-bid-economics-screening`, `neqsim-anp-open-data`, `neqsim-brazil-presalt-analogue-basis`, `neqsim-production-optimization` and `neqsim-reservoir-facility-value-chain`.131132## References133134- ANP Res 16/2008, Res 982/2025; Lei 14.134/2021, 12.351/2010, 13.586/2017, 15.042/2024.135- EPE PDE 2035 (gas, production, international prices), Petrobras route pages, Equinor and MODEC Bacalhau pages, ANP bulletin Jul 2026 and PPSA spot sales; URLs in `sources()`.