Plant layout study
Use neqsim layout-study through @plant-layout-study. Companions are neqsim-plant-layout-geometry and
neqsim-plant-layout-delivery. Read the implementation guide.
The workflow owns physical layout; process simulation stays with existing process agents and the process-report dataset.
Scope and inputs
Create or resume the task folder. Read the decision, jurisdiction, facility type, maturity, coordinate frame/datum,
plot/decks, equipment schedule, topology, existing geometry, vendor/sizing evidence, maintenance/materials handling,
escape reservations, standards register and acceptance criteria. Ask only for missing information that changes the result.
Keep unanswered items in data_gaps; assumptions are explicit and traceable.
The plant_layout_study.v1 model uses metres and kilograms. Equipment requires dimensions and their source, allowed decks,
orientations, optional locked positions and separate envelopes. Process import preserves stream identities and connectivity;
it never invents package dimensions or interprets a schematic symbol as a scaled footprint.
Reuse ProcessDiagramGraphAdapter and EngineeringGraph for semantic identities where available, and numeric
SystemMechanicalDesign / MechanicalDesign summaries for explicitly preliminary dimensions. Check
SystemMechanicalDesignResult completeness and per-equipment outcomes before accepting calculated geometry.
Execute
- Initialize a task-local specification with
neqsim layout-study --init DIR. - Generate and inspect synthetic examples using
--demo onshoreor--demo offshore, with explicit--out DIR. - Run the specification with
neqsim layout-study study.yaml --out DIR; use--strictwhen complete required evidence is an acceptance gate. Read command help for supported stages and process-data input. - Preserve dataset fingerprints and source snapshots. A stale stage cache must be regenerated before use.
- Reconcile process tags, coordinates and connection metrics. A centre-to-centre length proxy is not installed piping MTO.
- Review checks, CAD adapter availability/losses, drawings and report before handoff to
@plant-layout-review.
Standards and maturity
Flow-diagram gate: accompanying flow/connection diagrams pass neqsim pfd-check (skill neqsim-pfd-layout-review) before use;
plot/deck drawings follow the geometry and delivery checks.
Establish applicability and the adopted edition. Candidate sources include Havtil regulations where in scope; NORSOK
S-001, S-002, L-002, P-002 and relevant C/R standards; ISO 13702/17776 for applicable offshore installations;
IEC 60079-10-1 for its hazardous-area scope; API RP 752/753/756 for applicable onshore buildings/tents.
Add LNG, storage, flare, electrical, structural and marine/class sources where relevant.
Use neqsim-standards-lookup and inspected authorized text. Public metadata cannot establish a spacing requirement.
Mandatory law prevails over project decisions; no project deviation can waive statutory obligations.
Software checks return PASS, FAIL, NOT_EVALUATED or NOT_APPLICABLE with evidence. An alternative is INFEASIBLE on required failure and INCOMPLETE on missing required evidence. FEASIBLE means feasible against the supplied modeled criteria only; it is not design approval or a statement of full standard compliance. Demonstrations remain SCREENING and synthetic.
Handoffs and failure behavior
Invalid geometry/units/tags stop input processing. Failed geometric alternatives stay visible. Missing required hazard, structural, vendor or marine evidence remains unassessed; do not relabel it PASS to make strict mode succeed. Use process/mechanical/safety/standards specialists and optional community/enterprise overlays through current catalogs. Do not commit project reports, plant data or licensed standards to public repositories.