1---2name: draft-construction-contract3task_id: real-estate/draft-construction-contract4description: Guides drafting of an AIA-style modified construction agreement by synthesizing multi-document source materials into a coherent single-document structure and flagging cross-document inconsistencies in a companion memo.5activates_for: [planner, solver, checker]6metadata:7 source: https://skillmd.com/skills/finchipaiorg/draft-construction-contract8---910# Skill: Draft AIA-Style Modified Construction Agreement for Mixed-Use Development1112## 1. Subject-matter triage13- Confirm the primary deliverable is the construction agreement itself; draft that document first, then prepare the issues memo only after the contract exists and is complete enough to review.14- Treat the source set as potentially containing multiple commercial inputs, technical exhibits, financing terms, and follow-up edits; map each to the contract before drafting prose.15- If only one operative source controls a topic, state that explicitly; if multiple sources address the same topic, compare them before choosing language.1617## 2. Failure modes the skill is correcting18- Drafting a generic AIA-style contract that ignores negotiated project terms and therefore does not reflect the deal.19- Using a standard two-document AIA structure when the task requires a modified single-document form.20- Omitting lender- or project-required provisions such as bonds, retainage, insurance, payment mechanics, or change-order controls when the source materials make them mandatory.21- Failing to harmonize scope, pricing, schedule, and risk-allocation provisions across the documents.22- Producing a companion memo that describes issues generally but does not identify concrete cross-document inconsistencies and a path to resolution.23- Letting the draft rely on implied defaults instead of expressly stating the modified provisions that displace standard AIA assumptions.2425## 3. Legal frameworks / domain conventions that apply26- Use an AIA-style integrated contract architecture: commercial terms and general conditions are merged into one instrument, with defined terms, article numbering, and exhibit cross-references used consistently.27- Draft the price clause to reflect the agreed pricing structure, including any guaranteed maximum price mechanics, inclusions and exclusions, contingency treatment, and fee treatment as the source materials require.28- Define substantial completion in a way that ties to the project’s practical completion standard used in the sources, because that date controls final payment, punch-list timing, and any delay remedy cutoff.29- Express delay consequences clearly, including any liquidated-damages regime, cap, or offset, and reconcile that regime with any no-consequential-damages language.30- Use monthly payment applications and schedule-of-values support unless the source materials prescribe a different mechanism; address retainage, reduction points, release timing, and lien-period conditions where required.31- Include a change-order framework that states who may direct changes, how pricing is set, whether work must continue during disputes, and when time extensions are available.32- Include bond requirements if the source materials require them, and tie form, amount, and beneficiary to the project’s financing or procurement terms.33- Include insurance requirements with the coverage types, limits, endorsements, and waiver concepts reflected in the source set, and align indemnity language with that allocation of risk.34- State dispute resolution in a stepped sequence when required: claim presentation, initial decision maker, mediation, and then the forum chosen by the parties.35- Support each major drafting choice with the governing contract principle or source authority the materials indicate; do not state a legal proposition as settled unless the controlling authority is identified in the source set or is a standard construction-contract convention.3637## 4. Analytical scaffolds38- Build a clause-by-clause matrix of the source materials before drafting: identify scope, price, schedule, payment, bonds, insurance, change control, indemnity, dispute resolution, warranties, closeout, and termination.39- For each topic, identify the controlling source, any inconsistent source, and the drafting choice needed to harmonize them.40- When a term appears in more than one source, resolve it by priority, specificity, or later-in-time amendment logic; if priority is unclear, flag it in the memo rather than burying it in the contract.41- Draft the contract so that defined terms are reused consistently and exhibit references point to the correct schedule or attachment.42- When the sources contain technical specifications or project assumptions, convert them into operative contract obligations rather than leaving them as background description.43- For the companion memo, identify each inconsistency, explain why it matters, and recommend the fix or the source that should control.44- If more than one party, period, milestone, or coverage category is in play, enumerate the set explicitly before analyzing the implications so that no item is collapsed into a generic pass.4546## 5. Vertical / structural / temporal relationships47- Keep the price, schedule, and completion provisions internally consistent: scope assumptions should support the pricing model, and the completion date should match the work program and any milestone commitments.48- Link payment timing to performance status, approvals, and retainage release conditions so that the payment clause does not contradict closeout obligations.49- Make sure change-order pricing and time-extension language do not undercut the guaranteed price or scheduled completion date unless the source materials expressly allow that result.50- Align indemnity, insurance, and builder’s-risk concepts so that insured losses, contract claims, and consequential-loss waivers do not overlap incoherently.51- If financing requirements affect contractor obligations, incorporate them expressly rather than leaving them in a side document that conflicts with the contract.52- Treat closeout, substantial completion, punch-list, and final payment as a sequence; do not draft them as independent events if the source materials link them.5354## 6. Output structure conventions55- Draft the construction contract in a single-document AIA-style format with conventional article flow, defined terms, and embedded general conditions provisions.56- Use article and section headings that read like a construction contract, not a memo or checklist.57- Include exhibits and schedules only where needed to operationalize the deal terms, and cross-reference them from the operative clauses.58- Prepare the issues memo as a separate advisory document that tracks cross-document conflicts, explains the impact of each conflict, and states the proposed resolution.59- Organize the memo by issue topic or source pairing, not by narrative summary.60- Give each issue a concise description, the conflicting source references, the practical consequence, and the recommended fix.61- End the memo with an explicit Recommended Actions section identifying the next drafting or business steps, the responsible role, and the timing anchor tied to the drafting or deal milestone.62- Label the deliverables exactly as instructed for file naming, and ensure the contract file is complete before the memo is finalized.