Anlogic FPGA TD Project Creation Skill
Use this skill only after the verification chain has released the design.
Role
Turn validated design inputs into a synthesis-ready TD project without re-opening resolved verification decisions.
Inputs
- the latest
doc/stage-S3-summary.mdand comparison release conclusion - device, package, speed, constraints, IP, wrappers, and validated RTL inputs
Boundaries
- do not redesign RTL architecture
- do not replace requirement analysis
- do not replace testbench or simulation release
- do not use project creation as a workaround for failed comparison
Outputs
- synthesis-ready TD project input
- standard-directory mapping note when needed
doc/stage-S4-summary.md
Not Doing
- not reopening large historical layouts before checking indexes and stage summaries
Upstream Inputs
Prefer inputs from:
anlogic-needs-analysis: device, resources, interfaces, clocks, and primitive guidanceanlogic-python-signal-pre-research: saved reference signal baselineanlogic-code-design: RTL structure and wrapper choicesanlogic-modelsim: simulation conclusion and preserved waveform artifactsanlogic-signal-comparison: clean pass result
If the comparison gate has not passed, do not enter this stage.
Responsibilities
- Create or copy the TD project
- Select device / package / speed
- Organize
.al/.prj - Import RTL, constraints, IP, wrappers, and include paths
- Prepare the project inputs for synthesis and later implementation
- Keep the standard root structure such as
doc/src/tb/msim/prj/bit/constrain
Not Responsible For
- Do not redesign RTL architecture
- Do not replace requirement analysis
- Do not replace testbench or simulation release
- Do not use project creation as a workaround for failed comparison
Default Flow
- Confirm
anlogic-signal-comparisonhas passed. - Lock device, package, and speed grade.
- Establish the project directory structure.
- Clean only unrelated stale implementation leftovers that would pollute the current project audit.
- Organize sources, constraints, IP, and wrappers.
- Prepare the handoff to
anlogic-synthesis.
Gate Rules
- If requirement inputs are incomplete: go back to
anlogic-needs-analysis - If the reference baseline is missing or wrong: go back to
anlogic-python-signal-pre-research - If RTL or interfaces are still changing: go back to
anlogic-code-design - If simulation artifacts or comparison are not clean: go back to
anlogic-modelsim,anlogic-wave-signal-analyzer, oranlogic-signal-comparison - Only a clean comparison pass may release to this stage
Strong Rules
- Use
constrain/as the main constraints directory for new projects. - Do not delete ModelSim artifacts such as
work/,transcript, or.wlf; those remain owned by the simulation and waveform-analysis stages. - Only clean unrelated stale implementation leftovers after confirming they are not part of the current verification evidence.
Output Requirements
- valid TD project
- selected device / package / speed result
- source / constraint / IP / wrapper import result
- minimum synthesis-ready project input
- clear statement that the stage entered only after a clean
anlogic-signal-comparisonpass - fixed summary fields:
current_stagegoalconfirmed_constraintsartifactsdecisionblocking_reasonnext_action
2026-05-06 Rule: Hard-IP Identity And Legacy IP Compatibility
- Before importing DDR hard-IP assets, lock these identities explicitly:
- board name
- device and package
- DDR generation
- whether DDR IO is owned by hard-IP top-level connection rather than normal board ADC/SDC enumeration
- For AP111/AP110 class projects, do not treat DDR2 and DDR3 reference projects as drop-in interchangeable just because both are hard-IP based.
- If a legacy packaged IP fails inside encrypted or packaged vendor sources during project creation or first synthesis, prefer this order:
- regenerate the same hard IP with the matching TD version for the same target device/package
- only if regeneration is not available or still blocked, evaluate a same-device validated replacement asset
- Do not normalize "borrow IP from another project" as the default project-creation path; it is a fallback that must be called out as such in the stage conclusion.
- If a historical TD layout is preserved instead of the standard
doc/src/tb/msim/prj/bit/constrainlayout, add an explicit mapping note so later stages know where evidence and ownership live.