Architectural Programme Brief
Clients brief in rooms and adjectives; buildings are designed from areas, adjacencies and constraints. The gap between the two is where scope creep lives. This converts the conversation into a schedule you can design against, tests the budget against the areas before anyone draws anything, and writes down what the project is not — the single most valuable page in any brief.
What This Skill Produces
- An accommodation schedule — every space with its area, occupancy, and the activity it must support
- Adjacency and circulation requirements — what must be near what, what must never be, and the routes between
- Site and statutory constraints — planning context, access, orientation, services, and known designations
- Performance requirements — servicing, acoustics, daylight, accessibility, and environmental targets, stated as requirements rather than aspirations
- The budget and programme reality check — the area total against the budget at a realistic rate, before design begins
- Explicit exclusions — what this project is not doing, agreed and written down
Required Inputs
Ask for these if not provided:
- The client and the driver — who they are, and what problem the building is supposed to solve
- The activities — what will actually happen in the building, by whom, and when
- The site — location, area, existing structures, access, orientation, and any known designations or constraints
- The budget and programme — the number they have and the date they need it, however soft
- The fixed points — anything already decided, promised, or non-negotiable
Framework: Activities Before Rooms, Areas Before Budget
- Brief the activity, not the room. 'A place for forty people to eat that empties in twenty minutes' designs better than 'a canteen'. Rooms are a solution; activities are the requirement.
- Put an area against everything. An unpriced schedule is a wish list. Areas are what make the budget conversation possible.
- Test the budget early and bluntly. Total area at a realistic rate per square metre, against the stated budget. If it does not work, say so in the brief rather than discovering it at tender.
- Map adjacencies as a matrix. Must-be-near, must-not-be-near, and the routes people take between them. This is where the plan actually comes from.
- Name constraints before they become surprises. Planning context, rights of light, access, ground conditions, services capacity, listed status.
- Write the exclusions down and get them agreed. The scope you did not include is only excluded if it is on paper.
Output Format
Project brief: [project] · [client] · [date] · rev [n]
Project driver: [the problem the building solves, in one paragraph]
Accommodation schedule
| Space |
Activity supported |
Area (m²) |
Occupancy |
Key requirements |
|
|
|
|
|
| Net area: [x] m² · Gross (at [n]% circulation/plant): [y] m² |
|
|
|
|
Adjacencies: must be adjacent [pairs] · must be separated [pairs] · key routes [list]
Site & statutory: [location, area, access, orientation, existing structures, designations, planning context, known constraints]
Performance: accessibility [standard] · environmental target [standard/rating] · acoustics [where it matters] · daylight [requirement] · servicing strategy [outline]
Budget check: [y] m² × [rate]/m² = [construction cost estimate] vs stated budget [amount] → [aligned / gap of [amount]]
If there is a gap: [the options — reduce area, change specification, phase, or increase budget]
Programme: [key dates, and whether they are achievable against a realistic consent and construction period]
Explicitly excluded: [what this project does not include — agreed with client on [date]]
Assumptions: [what has been assumed pending information, and what would change if wrong]
Quality Checks
Anti-Patterns
- Briefing in room names. Locks in a solution before the requirement is understood.
- A schedule with no areas. Guarantees the budget conversation happens after the design.
- Deferring the budget test. The gap does not shrink by being discovered later; it just costs more to fix.
- Aspirations written as requirements. 'Sustainable' is not a requirement; a target rating is.
- No exclusions page. Every undocumented exclusion becomes a variation.
- Accepting a programme without testing it. Consent periods are not negotiable by optimism.
Example Trigger Phrases
- "Write an architectural brief for a new community building"
- "Help me capture what the client actually needs"
- "Turn these client notes into a project brief"
- "Does this budget work for the accommodation they are asking for?"
- "Write a brief for a house extension"
1---2name: architectural-programme-brief-23description: Turn a client's wishes into an architectural brief that can actually be designed against — the accommodation schedule, the adjacencies, the budget reality, and the constraints named before they become change orders. Use when asked to write an architectural brief, prepare a project brief for a building, run a client briefing, or capture requirements for a new build or refurbishment. Produces the accommodation schedule with areas, the adjacency and circulation requirements, the site and statutory constraints, the budget and programme reality check, and the explicit exclusions.4---56# Architectural Programme Brief78Clients brief in rooms and adjectives; buildings are designed from areas, adjacencies and constraints. The gap between the two is where scope creep lives. This converts the conversation into a schedule you can design against, tests the budget against the areas before anyone draws anything, and writes down what the project is not — the single most valuable page in any brief.910## What This Skill Produces1112- **An accommodation schedule** — every space with its area, occupancy, and the activity it must support13- **Adjacency and circulation requirements** — what must be near what, what must never be, and the routes between14- **Site and statutory constraints** — planning context, access, orientation, services, and known designations15- **Performance requirements** — servicing, acoustics, daylight, accessibility, and environmental targets, stated as requirements rather than aspirations16- **The budget and programme reality check** — the area total against the budget at a realistic rate, before design begins17- **Explicit exclusions** — what this project is not doing, agreed and written down1819## Required Inputs2021Ask for these if not provided:22- **The client and the driver** — who they are, and what problem the building is supposed to solve23- **The activities** — what will actually happen in the building, by whom, and when24- **The site** — location, area, existing structures, access, orientation, and any known designations or constraints25- **The budget and programme** — the number they have and the date they need it, however soft26- **The fixed points** — anything already decided, promised, or non-negotiable2728## Framework: Activities Before Rooms, Areas Before Budget29301. **Brief the activity, not the room.** 'A place for forty people to eat that empties in twenty minutes' designs better than 'a canteen'. Rooms are a solution; activities are the requirement.312. **Put an area against everything.** An unpriced schedule is a wish list. Areas are what make the budget conversation possible.323. **Test the budget early and bluntly.** Total area at a realistic rate per square metre, against the stated budget. If it does not work, say so in the brief rather than discovering it at tender.334. **Map adjacencies as a matrix.** Must-be-near, must-not-be-near, and the routes people take between them. This is where the plan actually comes from.345. **Name constraints before they become surprises.** Planning context, rights of light, access, ground conditions, services capacity, listed status.356. **Write the exclusions down and get them agreed.** The scope you did not include is only excluded if it is on paper.3637## Output Format3839### Project brief: [project] · [client] · [date] · rev [n]4041**Project driver:** [the problem the building solves, in one paragraph]4243**Accommodation schedule**44| Space | Activity supported | Area (m²) | Occupancy | Key requirements |45|---|---|---|---|---|46| | | | | |47**Net area:** [x] m² · **Gross (at [n]% circulation/plant):** [y] m²4849**Adjacencies:** must be adjacent [pairs] · must be separated [pairs] · key routes [list]5051**Site & statutory:** [location, area, access, orientation, existing structures, designations, planning context, known constraints]5253**Performance:** accessibility [standard] · environmental target [standard/rating] · acoustics [where it matters] · daylight [requirement] · servicing strategy [outline]5455**Budget check:** [y] m² × [rate]/m² = **[construction cost estimate]** vs stated budget **[amount]** → [aligned / gap of [amount]]56**If there is a gap:** [the options — reduce area, change specification, phase, or increase budget]5758**Programme:** [key dates, and whether they are achievable against a realistic consent and construction period]5960**Explicitly excluded:** [what this project does not include — agreed with client on [date]]6162**Assumptions:** [what has been assumed pending information, and what would change if wrong]6364## Quality Checks65- [ ] Every space is justified by an activity, not just named66- [ ] Areas are stated and totalled, gross as well as net67- [ ] The budget is tested against the area before design begins68- [ ] Adjacencies are recorded as requirements, not left to the plan69- [ ] Statutory and site constraints are named rather than assumed away70- [ ] Exclusions are written down and agreed71- [ ] Assumptions are flagged with what changes if they turn out wrong7273## Anti-Patterns74- **Briefing in room names.** Locks in a solution before the requirement is understood.75- **A schedule with no areas.** Guarantees the budget conversation happens after the design.76- **Deferring the budget test.** The gap does not shrink by being discovered later; it just costs more to fix.77- **Aspirations written as requirements.** 'Sustainable' is not a requirement; a target rating is.78- **No exclusions page.** Every undocumented exclusion becomes a variation.79- **Accepting a programme without testing it.** Consent periods are not negotiable by optimism.8081## Example Trigger Phrases82- "Write an architectural brief for a new community building"83- "Help me capture what the client actually needs"84- "Turn these client notes into a project brief"85- "Does this budget work for the accommodation they are asking for?"86- "Write a brief for a house extension"