A dependency is a permanent liability accepted for a temporary convenience. Sometimes that trade is excellent. It is never free, and it is never reversed casually.
1. The three questions before the evaluation
Asked in order. Two of them end the discussion most of the time.
- Does the project already solve this? Search the codebase and the installed tree. Adding a second date library, a second HTTP client, a second validation library or a second state manager is a defect.
- Does the platform solve this? Standard library, runtime API, framework feature. Many dependencies exist because they predate a platform feature that now ships everywhere the project runs.
- Is the problem small enough to own? Fifty lines the team understands beat a package with nine transitive dependencies for a formatting helper. The inverse is also true: cryptography, date arithmetic across timezones, parsers and accessibility primitives are not written by hand.
2. The twelve point evaluation
Applied only to candidates that survive section 1.
| # | Criterion | Reject when |
|---|---|---|
| 1 | solves the actual need | it solves a superset and the excess is most of the cost |
| 2 | framework and runtime compatibility | it needs a version the project cannot adopt |
| 3 | maintenance | no release or no answered issue in a long period, single maintainer with no succession |
| 4 | security | known unfixed advisories, or a history of slow response |
| 5 | licence | incompatible with the project's distribution |
| 6 | size | the bundle or runtime cost exceeds the benefit, measured |
| 7 | transitive tree | it pulls in a large tree, or a package with a poor reputation |
| 8 | types | no types, or types that lie, in a typed project |
| 9 | accessibility | a UI library whose components are not keyboard operable |
| 10 | documentation | the answer to a normal question requires reading the source |
| 11 | escape cost | it captures the data model or the API surface so deeply that leaving is a rewrite |
| 12 | alternatives | a smaller or already present option covers the need |
Each criterion is answered with evidence: a version number, a date, a measured size, a licence identifier. Not an impression.
3. Measuring the cost
Never estimated when it can be measured.
Bundle impact build before and after, compare the output size
Install impact count the added packages in the lockfile diff
Runtime impact the operation timed with and without, where it matters
Transitive risk read the lockfile diff, not the manifest line
A single manifest line that adds ninety packages is ninety packages of maintenance, audit surface and install time.
4. The decision record
Need what the project cannot currently do
Existing what was searched, and why it does not cover the need
Platform what the platform offers, and why it is insufficient
Candidates two or three, with the twelve points answered
Decision chosen, with the deciding criterion named
Cost packages added, bundle delta, licence
Escape what leaving costs, in one sentence
Recorded where the project keeps decisions, or in the continuity notes when it has no such place.
5. Upgrades
| Kind | Approach |
|---|---|
| patch | apply, run the suite, ship |
| minor | read the release notes, apply, run the suite, check the touched paths |
| major | read the migration guide, plan, apply in its own commit, test the changed behaviour explicitly |
| security | apply promptly, judge the reachability of the advisory, do not assume it applies |
Rules: one dependency change per commit, so a regression can be bisected. Never upgrade a major version inside a feature commit. Never apply a bulk update across a whole tree without reading what changed.
6. Removal
A dependency that is no longer used is removed in its own commit. Check the lockfile, not the manifest, to confirm nothing else pulls it in. Removing a package that another package depends on transitively changes nothing except the manifest, and pretending otherwise is a false cleanup.
7. Refusals
Refuse, with the reason stated once:
- a second library for a problem already solved in the project;
- a package for a task the platform performs in a few lines;
- an unmaintained package chosen because it is familiar;
- a UI library whose components fail keyboard operation;
- a package whose licence conflicts with the project's distribution;
- a heavy library imported for one function that can be imported alone;
- a framework adopted inside a feature commit.
8. Protocol
- Ask the three questions of section 1. Stop if answered.
- Identify two or three candidates.
- Answer the twelve points for each, with evidence.
- Measure the cost, section 3.
- Decide, naming the deciding criterion.
- Install with the project's package manager, exactly.
- Read the lockfile diff before committing it.
- Run the security audit command and the test suite.
- Record the decision.
- Commit the dependency change alone.
9. Auto-critique
Score from 0 to 5: existing solution genuinely searched, platform capability considered, evidence behind each criterion, cost measured rather than estimated, alternatives real rather than straw men, escape cost stated, commit isolated.
Threshold: no axis below 3, average at least 4. A decision with no measured cost and no named alternative is not a decision, it is a preference.
10. Interfaces
- Upstream:
architecture-design,project-exploration,ui-ux-engineeringfor UI libraries. - Downstream:
security-auditfor the advisory check,performance-engineeringfor the size impact,testing-quality,git-workflowfor the isolated commit,technical-documentation.