Control Plan
When to use
Use this skill when:
- Creating a new Control Plan for prototype, pre-launch, or production
- Reviewing an existing Control Plan for completeness and accuracy
- Updating the CP after a process change, corrective action (D7), or PFMEA update
- Auditing a supplier's Control Plan during qualification or an IATF audit
- Linking PFMEA controls to the Control Plan after FMEA review
Prerequisites
- Process Flow Diagram (required — CP must mirror the process flow sequence)
- PFMEA (required — CP controls derive from PFMEA recommended actions)
- Drawing with ballooned characteristics and tolerance data
- List of special and significant characteristics (SC, CC, KPC, KCC)
- MSA results for measurement systems referenced in the CP (for production CP)
Workflow
Step 1 — Determine the CP type
| Type |
When |
Purpose |
| Prototype |
During prototype builds |
Describes dimensional, material, and functional tests in prototype phase |
| Pre-launch |
After prototype, before PPAP |
Describes controls in place during pilot/pre-production runs |
| Production |
After PPAP approval, at SOP |
The living document — updated throughout product life |
All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.
Step 2 — Build the Control Plan structure
The CP is a table with one row per characteristic per process step. Each row contains:
Header section (document-level):
- Control Plan number and revision
- Part number and revision
- Part name / description
- Supplier / plant
- Supplier code (OEM code)
- Key contact / phone
- Core team (multi-functional)
- Date (original) and date (revised)
- Customer engineering approval (name/date) — if required
- Customer quality approval (name/date) — if required
- Supplier approval (name/date)
Detail columns (one row per characteristic):
| Column |
What to enter |
| Part/process number |
Reference number from Process Flow |
| Process name / operation description |
Name of the process step |
| Machine, device, jig, or tool |
Equipment used at this step |
| Number |
Characteristic number (links to balloon drawing) |
| Product characteristic |
Product feature being controlled (dimension, material property, appearance) |
| Process characteristic |
Process parameter being controlled (temperature, pressure, speed, torque) |
| Special characteristic classification |
SC, CC, KPC, KCC, *, ▲ per customer symbology |
| Product/process specification / tolerance |
Nominal value and tolerance band |
| Evaluation / measurement technique |
Gauge type, method, or test used |
| Sample size |
Number of parts per sample |
| Frequency |
How often samples are taken (every hour, every lot, 100%) |
| Control method |
How the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection) |
| Reaction plan |
What to do if out-of-control or out-of-specification (who, what action, containment) |
Step 3 — Populate from PFMEA
For each high-severity failure mode in the PFMEA:
- Identify the current prevention and detection controls from the PFMEA
- Transfer these controls into the corresponding CP row
- The reaction plan must address what happens if the control detects a non-conformance
Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.
Every recommended action completed in the PFMEA must be reflected in the updated CP controls.
Step 4 — Special characteristics — mandatory coverage
| Classification |
OEM symbol |
CP requirement |
| Safety / Regulatory |
★ SC / ⬟ |
100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |
| Critical Characteristic |
CC / ◆ |
Same as above — automatic stop if out of spec |
| Significant Characteristic |
SC (Ford) / KPC |
Process monitoring with defined sample plan and reaction |
| Key Control Characteristic |
KCC |
Process parameter monitoring (not product) — SPC or other control |
OEM symbol conventions vary. Always use the exact symbol specified in the customer's CSR:
- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆
- GM: ★ for safety-critical; Δ for significant
- VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q
- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard
- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment
Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.
For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.
Step 5 — Reaction plan requirements
Every row in the CP must have a reaction plan. Minimum requirements:
- Who is responsible for taking action
- What immediate containment is applied (tag, sort, hold, stop production)
- Who is notified (supervisor, quality, engineering)
- When production may restart (after what verification)
- Reference to relevant Work Instruction or SOP for the reaction
A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.
Step 6 — Audit an existing Control Plan
When reviewing a supplier's or internal CP, check:
Structure:
Characteristics:
Controls:
Reaction plan:
Alignment:
Validation criteria
A complete Production Control Plan for PPAP submission must:
- Cover every operation in the Process Flow
- Include every special and significant characteristic with correct classification
- Have a MSA-validated measurement system for every variable characteristic on SC/CC
- Have a reaction plan for every row
- Be signed by the APQP team (multi-functional) and have customer approval if required
- Match the PFMEA revision level
Common mistakes
- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes
- Reaction plan says "notify supervisor" only — not a reaction plan, just escalation
- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque
- Sample plan says "as required" — must specify a number and frequency
- SC/CC characteristics not identified with correct customer symbol — auditor will flag this immediately
- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems
- Gauge type not specified — "visual inspection" or "measure" is not sufficient; must name the tool
Output Format
At the start of each use, ask the user:
"How would you like to receive the output?
A — Structured Markdown (formatted tables and sections, ready to copy)
B — Plain tables (simplified structure for Excel or Word)
C — Narrative report (flowing text for a formal document or email)
Default: A."
Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.
Changelog
| Version |
Date |
Author |
Change |
| 1.0 |
2026-06-06 |
@RBraga01 |
Initial release |
| 1.1 |
2026-06-06 |
@migmcc |
Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |
1---2name: control-plan3description: >-4 Control Plan — build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked5 to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process6 change or corrective action, or auditing an existing CP for completeness and PFMEA alignment.7 Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.8license: MIT9metadata:10 author: RBraga0111 version: "1.1"12 iso-9001: "8.5.1"13 iatf-16949: "8.5.1"14 aiag-reference: "AIAG Control Plan Reference Manual"15 domain: quality-engineering16 subdomain: planning17 industries: automotive,electronics,aerospace,medical,general18 status: approved19 created: "2026-06-06"20 last_updated: "2026-06-06"21 updated_by: migmcc22 reviewed_by: RBraga0123 standard_edition: "AIAG Control Plan Reference Manual (1995) / IATF 16949:2016 §8.5.1"24---2526# Control Plan2728## When to use2930Use this skill when:31- Creating a new Control Plan for prototype, pre-launch, or production32- Reviewing an existing Control Plan for completeness and accuracy33- Updating the CP after a process change, corrective action (D7), or PFMEA update34- Auditing a supplier's Control Plan during qualification or an IATF audit35- Linking PFMEA controls to the Control Plan after FMEA review3637## Prerequisites3839- Process Flow Diagram (required — CP must mirror the process flow sequence)40- PFMEA (required — CP controls derive from PFMEA recommended actions)41- Drawing with ballooned characteristics and tolerance data42- List of special and significant characteristics (SC, CC, KPC, KCC)43- MSA results for measurement systems referenced in the CP (for production CP)4445## Workflow4647### Step 1 — Determine the CP type4849| Type | When | Purpose |50|------|------|---------|51| **Prototype** | During prototype builds | Describes dimensional, material, and functional tests in prototype phase |52| **Pre-launch** | After prototype, before PPAP | Describes controls in place during pilot/pre-production runs |53| **Production** | After PPAP approval, at SOP | The living document — updated throughout product life |5455All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.5657### Step 2 — Build the Control Plan structure5859The CP is a table with one row per characteristic per process step. Each row contains:6061**Header section (document-level):**62- Control Plan number and revision63- Part number and revision64- Part name / description65- Supplier / plant66- Supplier code (OEM code)67- Key contact / phone68- Core team (multi-functional)69- Date (original) and date (revised)70- Customer engineering approval (name/date) — if required71- Customer quality approval (name/date) — if required72- Supplier approval (name/date)7374**Detail columns (one row per characteristic):**7576| Column | What to enter |77|--------|--------------|78| Part/process number | Reference number from Process Flow |79| Process name / operation description | Name of the process step |80| Machine, device, jig, or tool | Equipment used at this step |81| Number | Characteristic number (links to balloon drawing) |82| Product characteristic | Product feature being controlled (dimension, material property, appearance) |83| Process characteristic | Process parameter being controlled (temperature, pressure, speed, torque) |84| Special characteristic classification | SC, CC, KPC, KCC, *, ▲ per customer symbology |85| Product/process specification / tolerance | Nominal value and tolerance band |86| Evaluation / measurement technique | Gauge type, method, or test used |87| Sample size | Number of parts per sample |88| Frequency | How often samples are taken (every hour, every lot, 100%) |89| Control method | How the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection) |90| Reaction plan | What to do if out-of-control or out-of-specification (who, what action, containment) |9192### Step 3 — Populate from PFMEA9394For each high-severity failure mode in the PFMEA:951. Identify the current prevention and detection controls from the PFMEA962. Transfer these controls into the corresponding CP row973. The reaction plan must address what happens if the control detects a non-conformance9899Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.100Every recommended action completed in the PFMEA must be reflected in the updated CP controls.101102### Step 4 — Special characteristics — mandatory coverage103104| Classification | OEM symbol | CP requirement |105|----------------|-----------|----------------|106| Safety / Regulatory | ★ SC / ⬟ | 100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |107| Critical Characteristic | CC / ◆ | Same as above — automatic stop if out of spec |108| Significant Characteristic | SC (Ford) / KPC | Process monitoring with defined sample plan and reaction |109| Key Control Characteristic | KCC | Process parameter monitoring (not product) — SPC or other control |110111**OEM symbol conventions vary.** Always use the exact symbol specified in the customer's CSR:112- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆113- GM: ★ for safety-critical; Δ for significant114- VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q115- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard116- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment117118Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.119120For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.121122### Step 5 — Reaction plan requirements123124Every row in the CP must have a reaction plan. Minimum requirements:125126- **Who** is responsible for taking action127- **What** immediate containment is applied (tag, sort, hold, stop production)128- **Who** is notified (supervisor, quality, engineering)129- **When** production may restart (after what verification)130- Reference to relevant Work Instruction or SOP for the reaction131132A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.133134### Step 6 — Audit an existing Control Plan135136When reviewing a supplier's or internal CP, check:137138**Structure:**139- [ ] All process steps from the Process Flow are represented140- [ ] Each special characteristic has its own dedicated row141- [ ] Revision level matches the current PFMEA and drawing revision142143**Characteristics:**144- [ ] All SC/CC/KPC/KCC are listed with correct classification symbols145- [ ] Product AND process characteristics are both covered (not just product)146- [ ] Tolerances match the current released drawing147148**Controls:**149- [ ] Measurement technique is specific (gauge type, not just "measure")150- [ ] Sample size and frequency are defined (not "as required" or "as needed")151- [ ] 100% inspection is specified where Cpk < 1.33152- [ ] SPC control charts are specified for characteristics where they are required153154**Reaction plan:**155- [ ] Every row has a reaction plan156- [ ] Reaction plans specify concrete actions (not just "notify supervisor")157- [ ] Reaction plans are consistent with PFMEA failure mode severity158159**Alignment:**160- [ ] CP controls match PFMEA current controls column for each failure mode161- [ ] Completed PFMEA recommended actions are reflected in updated controls162- [ ] CP revision date is more recent than most recent PFMEA update date163164## Validation criteria165166A complete Production Control Plan for PPAP submission must:167- Cover every operation in the Process Flow168- Include every special and significant characteristic with correct classification169- Have a MSA-validated measurement system for every variable characteristic on SC/CC170- Have a reaction plan for every row171- Be signed by the APQP team (multi-functional) and have customer approval if required172- Match the PFMEA revision level173174## Common mistakes175176- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes177- Reaction plan says "notify supervisor" only — not a reaction plan, just escalation178- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque179- Sample plan says "as required" — must specify a number and frequency180- SC/CC characteristics not identified with correct customer symbol — auditor will flag this immediately181- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems182- Gauge type not specified — "visual inspection" or "measure" is not sufficient; must name the tool183184## Output Format185186At the start of each use, ask the user:187188> "How would you like to receive the output?189> **A** — Structured Markdown (formatted tables and sections, ready to copy)190> **B** — Plain tables (simplified structure for Excel or Word)191> **C** — Narrative report (flowing text for a formal document or email)192>193> Default: A."194195Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.196197## Changelog198199| Version | Date | Author | Change |200|---------|------|--------|--------|201| 1.0 | 2026-06-06 | @RBraga01 | Initial release |202| 1.1 | 2026-06-06 | @migmcc | Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |