When to use
Use this skill when:
- Creating a new Control Plan for prototype, pre-launch, or production
- Reviewing an existing Control Plan for completeness and accuracy
- Updating the CP after a process change, corrective action (D7), or PFMEA update
- Auditing a supplier's Control Plan during qualification or an IATF audit
- Linking PFMEA controls to the Control Plan after FMEA review
Prerequisites
- Process Flow Diagram (required — CP must mirror the process flow sequence)
- PFMEA (required — CP controls derive from PFMEA recommended actions)
- Drawing with ballooned characteristics and tolerance data
- List of special and significant characteristics (SC, CC, KPC, KCC)
- MSA results for measurement systems referenced in the CP (for production CP)
Workflow
Step 1 — Determine the CP type
| Type |
When |
Purpose |
| Prototype |
During prototype builds |
Describes dimensional, material, and functional tests in prototype phase |
| Pre-launch |
After prototype, before PPAP |
Describes controls in place during pilot/pre-production runs |
| Production |
After PPAP approval, at SOP |
The living document — updated throughout product life |
All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.
Step 2 — Build the Control Plan structure
The CP is a table with one row per characteristic per process step. Each row contains:
Header section (document-level):
- Control Plan number and revision
- Part number and revision
- Part name / description
- Supplier / plant
- Supplier code (OEM code)
- Key contact / phone
- Core team (multi-functional)
- Date (original) and date (revised)
- Customer engineering approval (name/date) — if required
- Customer quality approval (name/date) — if required
- Supplier approval (name/date)
Detail columns (one row per characteristic):
| Column |
What to enter |
| Part/process number |
Reference number from Process Flow |
| Process name / operation description |
Name of the process step |
| Machine, device, jig, or tool |
Equipment used at this step |
| Number |
Characteristic number (links to balloon drawing) |
| Product characteristic |
Product feature being controlled (dimension, material property, appearance) |
| Process characteristic |
Process parameter being controlled (temperature, pressure, speed, torque) |
| Special characteristic classification |
SC, CC, KPC, KCC, *, ▲ per customer symbology |
| Product/process specification / tolerance |
Nominal value and tolerance band |
| Evaluation / measurement technique |
Gauge type, method, or test used |
| Sample size |
Number of parts per sample |
| Frequency |
How often samples are taken (every hour, every lot, 100%) |
| Control method |
How the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection) |
| Reaction plan |
What to do if out-of-control or out-of-specification (who, what action, containment) |
Step 3 — Populate from PFMEA
For each high-severity failure mode in the PFMEA:
- Identify the current prevention and detection controls from the PFMEA
- Transfer these controls into the corresponding CP row
- The reaction plan must address what happens if the control detects a non-conformance
Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.
Every recommended action completed in the PFMEA must be reflected in the updated CP controls.
Step 4 — Special characteristics — mandatory coverage
| Classification |
OEM symbol |
CP requirement |
| Safety / Regulatory |
★ SC / ⬟ |
100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |
| Critical Characteristic |
CC / ◆ |
Same as above — automatic stop if out of spec |
| Significant Characteristic |
SC (Ford) / KPC |
Process monitoring with defined sample plan and reaction |
| Key Control Characteristic |
KCC |
Process parameter monitoring (not product) — SPC or other control |
OEM symbol conventions vary. Always use the exact symbol specified in the customer's CSR:
- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆
- GM: ★ for safety-critical; Δ for significant
- VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q
- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard
- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment
Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.
For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.
Step 5 — Reaction plan requirements
Every row in the CP must have a reaction plan. Minimum requirements:
- Who is responsible for taking action
- What immediate containment is applied (tag, sort, hold, stop production)
- Who is notified (supervisor, quality, engineering)
- When production may restart (after what verification)
- Reference to relevant Work Instruction or SOP for the reaction
A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.
Step 6 — Audit an existing Control Plan
When reviewing a supplier's or internal CP, check:
Structure:
Characteristics:
Controls:
Reaction plan:
Alignment:
Validation criteria
A complete Production Control Plan for PPAP submission must:
- Cover every operation in the Process Flow
- Include every special and significant characteristic with correct classification
- Have a MSA-validated measurement system for every variable characteristic on SC/CC
- Have a reaction plan for every row
- Be signed by the APQP team (multi-functional) and have customer approval if required
- Match the PFMEA revision level
Common mistakes
- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes
- Reaction plan says "notify supervisor" only — not a reaction plan, just escalation
- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque
- Sample plan says "as required" — must specify a number and frequency
- SC/CC characteristics not identified with correct customer symbol — auditor will flag this immediately
- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems
- Gauge type not specified — "visual inspection" or "measure" is not sufficient; must name the tool
Output Format
At the start of each use, ask the user:
"How would you like to receive the output?
A — Structured Markdown (formatted tables and sections, ready to copy)
B — Plain tables (simplified structure for Excel or Word)
C — Narrative report (flowing text for a formal document or email)
Default: A."
Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.
Changelog
| Version |
Date |
Author |
Change |
| 1.0 |
2026-06-06 |
@RBraga01 |
Initial release |
| 1.1 |
2026-06-06 |
@migmcc |
Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |
1---2name: control-plan3description: >-4 Control Plan — build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked5 to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process6 change or corrective action, or auditing an existing CP for completeness and PFMEA alignment.7 Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.8license: MIT9metadata:10 source: https://skillmd.com/skills/hashgraph-online/control-plan11 author: RBraga0112 version: "1.1"13 iso-9001: "8.5.1"14 iatf-16949: "8.5.1"15 aiag-reference: "AIAG Control Plan Reference Manual"16 domain: quality-engineering17 subdomain: planning18 industries: automotive,electronics,aerospace,medical,general19 status: approved20 created: "2026-06-06"21 last_updated: "2026-06-06"22 updated_by: migmcc23 reviewed_by: RBraga0124 standard_edition: "AIAG Control Plan Reference Manual (1995) / IATF 16949:2016 §8.5.1"25---2627# Control Plan2829## When to use3031Use this skill when:32- Creating a new Control Plan for prototype, pre-launch, or production33- Reviewing an existing Control Plan for completeness and accuracy34- Updating the CP after a process change, corrective action (D7), or PFMEA update35- Auditing a supplier's Control Plan during qualification or an IATF audit36- Linking PFMEA controls to the Control Plan after FMEA review3738## Prerequisites3940- Process Flow Diagram (required — CP must mirror the process flow sequence)41- PFMEA (required — CP controls derive from PFMEA recommended actions)42- Drawing with ballooned characteristics and tolerance data43- List of special and significant characteristics (SC, CC, KPC, KCC)44- MSA results for measurement systems referenced in the CP (for production CP)4546## Workflow4748### Step 1 — Determine the CP type4950| Type | When | Purpose |51|------|------|---------|52| **Prototype** | During prototype builds | Describes dimensional, material, and functional tests in prototype phase |53| **Pre-launch** | After prototype, before PPAP | Describes controls in place during pilot/pre-production runs |54| **Production** | After PPAP approval, at SOP | The living document — updated throughout product life |5556All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.5758### Step 2 — Build the Control Plan structure5960The CP is a table with one row per characteristic per process step. Each row contains:6162**Header section (document-level):**63- Control Plan number and revision64- Part number and revision65- Part name / description66- Supplier / plant67- Supplier code (OEM code)68- Key contact / phone69- Core team (multi-functional)70- Date (original) and date (revised)71- Customer engineering approval (name/date) — if required72- Customer quality approval (name/date) — if required73- Supplier approval (name/date)7475**Detail columns (one row per characteristic):**7677| Column | What to enter |78|--------|--------------|79| Part/process number | Reference number from Process Flow |80| Process name / operation description | Name of the process step |81| Machine, device, jig, or tool | Equipment used at this step |82| Number | Characteristic number (links to balloon drawing) |83| Product characteristic | Product feature being controlled (dimension, material property, appearance) |84| Process characteristic | Process parameter being controlled (temperature, pressure, speed, torque) |85| Special characteristic classification | SC, CC, KPC, KCC, *, ▲ per customer symbology |86| Product/process specification / tolerance | Nominal value and tolerance band |87| Evaluation / measurement technique | Gauge type, method, or test used |88| Sample size | Number of parts per sample |89| Frequency | How often samples are taken (every hour, every lot, 100%) |90| Control method | How the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection) |91| Reaction plan | What to do if out-of-control or out-of-specification (who, what action, containment) |9293### Step 3 — Populate from PFMEA9495For each high-severity failure mode in the PFMEA:961. Identify the current prevention and detection controls from the PFMEA972. Transfer these controls into the corresponding CP row983. The reaction plan must address what happens if the control detects a non-conformance99100Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP.101Every recommended action completed in the PFMEA must be reflected in the updated CP controls.102103### Step 4 — Special characteristics — mandatory coverage104105| Classification | OEM symbol | CP requirement |106|----------------|-----------|----------------|107| Safety / Regulatory | ★ SC / ⬟ | 100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring |108| Critical Characteristic | CC / ◆ | Same as above — automatic stop if out of spec |109| Significant Characteristic | SC (Ford) / KPC | Process monitoring with defined sample plan and reaction |110| Key Control Characteristic | KCC | Process parameter monitoring (not product) — SPC or other control |111112**OEM symbol conventions vary.** Always use the exact symbol specified in the customer's CSR:113- Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆114- GM: ★ for safety-critical; Δ for significant115- VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q116- BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard117- Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment118119Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.120121For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.122123### Step 5 — Reaction plan requirements124125Every row in the CP must have a reaction plan. Minimum requirements:126127- **Who** is responsible for taking action128- **What** immediate containment is applied (tag, sort, hold, stop production)129- **Who** is notified (supervisor, quality, engineering)130- **When** production may restart (after what verification)131- Reference to relevant Work Instruction or SOP for the reaction132133A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.134135### Step 6 — Audit an existing Control Plan136137When reviewing a supplier's or internal CP, check:138139**Structure:**140- [ ] All process steps from the Process Flow are represented141- [ ] Each special characteristic has its own dedicated row142- [ ] Revision level matches the current PFMEA and drawing revision143144**Characteristics:**145- [ ] All SC/CC/KPC/KCC are listed with correct classification symbols146- [ ] Product AND process characteristics are both covered (not just product)147- [ ] Tolerances match the current released drawing148149**Controls:**150- [ ] Measurement technique is specific (gauge type, not just "measure")151- [ ] Sample size and frequency are defined (not "as required" or "as needed")152- [ ] 100% inspection is specified where Cpk < 1.33153- [ ] SPC control charts are specified for characteristics where they are required154155**Reaction plan:**156- [ ] Every row has a reaction plan157- [ ] Reaction plans specify concrete actions (not just "notify supervisor")158- [ ] Reaction plans are consistent with PFMEA failure mode severity159160**Alignment:**161- [ ] CP controls match PFMEA current controls column for each failure mode162- [ ] Completed PFMEA recommended actions are reflected in updated controls163- [ ] CP revision date is more recent than most recent PFMEA update date164165## Validation criteria166167A complete Production Control Plan for PPAP submission must:168- Cover every operation in the Process Flow169- Include every special and significant characteristic with correct classification170- Have a MSA-validated measurement system for every variable characteristic on SC/CC171- Have a reaction plan for every row172- Be signed by the APQP team (multi-functional) and have customer approval if required173- Match the PFMEA revision level174175## Common mistakes176177- Control Plan created without reference to PFMEA — controls are generic, not linked to actual failure modes178- Reaction plan says "notify supervisor" only — not a reaction plan, just escalation179- Missing process characteristics — CP only controls product dimensions, not process parameters like temperature or torque180- Sample plan says "as required" — must specify a number and frequency181- SC/CC characteristics not identified with correct customer symbol — auditor will flag this immediately182- CP not updated after D7 of an 8D — the most common disconnect in corrective action systems183- Gauge type not specified — "visual inspection" or "measure" is not sufficient; must name the tool184185## Output Format186187At the start of each use, ask the user:188189> "How would you like to receive the output?190> **A** — Structured Markdown (formatted tables and sections, ready to copy)191> **B** — Plain tables (simplified structure for Excel or Word)192> **C** — Narrative report (flowing text for a formal document or email)193>194> Default: A."195196Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.197198## Changelog199200| Version | Date | Author | Change |201|---------|------|--------|--------|202| 1.0 | 2026-06-06 | @RBraga01 | Initial release |203| 1.1 | 2026-06-06 | @migmcc | Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |