VDA 6.3 Process Audit
When to use
Use this skill when:
- Conducting a VDA 6.3 process audit at a supplier or internally
- Preparing for an OEM process audit visit (BMW, VW, Audi, Mercedes, Porsche, Stellantis)
- Auditing a new supplier during qualification
- Responding to a customer concern by conducting a focused process audit
- Evaluating a supplier's manufacturing process capability before SOP
Prerequisites
- Customer audit scope (which process/product to audit)
- VDA 6.3 question catalogue (the auditor works from the standard questions)
- Process Flow Diagram, PFMEA, Control Plan, and Work Instructions for the audited process
- Access to the production area, equipment records, personnel, and quality records
Workflow
Step 1 — VDA 6.3 Structure Overview
VDA 6.3 is organised into 7 process elements (P1–P7):
| Element |
Name |
Applies to |
| P1 |
Potential Analysis |
New suppliers — evaluates readiness before series production |
| P2 |
Project Management |
APQP and product/process development process |
| P3 |
Planning the Product and Process Development |
Design and process planning activities |
| P4 |
Supplier Management (Purchasing) |
Sub-supplier control and qualification |
| P5 |
Process Input / Series |
Incoming materials and components |
| P6 |
Process Execution / Customer Satisfaction / Service |
The manufacturing process itself |
| P7 |
Customer Support / Customer Satisfaction / Service |
Delivery performance, escalation, field support |
For a focused series production audit (most common): P5, P6, P7 are mandatory. P1–P4 are added for new supplier qualification or product launch audits.
Step 2 — Rating system
Every question in VDA 6.3 is scored on a 0–10 scale:
| Score |
Meaning |
| 10 |
All requirements fulfilled — systematic, effective, and documented evidence exists |
| 8 |
Requirement largely fulfilled — minor gaps, no systematic risk |
| 6 |
Requirement partially fulfilled — deviations exist, limited risk |
| 4 |
Requirement insufficiently fulfilled — significant gaps, risk to quality |
| 2 |
Requirement not fulfilled — systematic failure, high risk |
| 0 |
Not applicable OR not fulfilled with no evidence |
A score of 4 or less on any question is a deficiency and must be documented with a finding and corrective action requirement.
Step 3 — Degree of Fulfillment calculation
For each process element:
Element score (%) = (Sum of all question scores) / (Maximum possible score) × 100
Weighting system (critical): Each question in the VDA 6.3 question catalogue has a pre-assigned weighting factor of 1, 2, or 3. These weights are fixed in the standard — the auditor cannot change them. Questions covering safety-critical topics (error-proofing, special characteristics control, non-conformance segregation) typically carry weight 2 or 3. The maximum possible score per question = 10 × weighting factor.
To calculate the degree of fulfillment correctly:
- Use the official VDA 6.3 question catalogue, which lists each question with its weight
- Sum (score × weight) for all applicable questions in the element
- Divide by the sum of (10 × weight) for all applicable questions
- Do not average raw scores — applying equal weight to all questions is a calculation error that produces incorrect element ratings
If a question is not applicable (N/A), it is excluded from both the numerator and denominator.
VDA 6.3 rating thresholds
| Degree of fulfillment |
Rating |
Interpretation |
| ≥ 90% |
A |
Process suitable for series production — no significant concerns |
| 75% – < 90% |
B |
Conditionally suitable — corrective actions required within agreed timeframe |
| < 75% |
C |
Not suitable — series production release blocked until corrective action complete |
A rating of C blocks SOP — the customer will not release the supplier for series production until re-audit achieves at least B.
Step 4 — P6 — Process Execution (the core audit)
P6 is the most extensive element and covers the actual manufacturing process. Key areas:
P6.1 — Process inputs
- Are incoming materials and components controlled?
- Are change management procedures in place and effective?
- Are specifications current and accessible at point of use?
P6.2 — Personnel
- Are operators qualified and trained for the tasks they perform?
- Are training records current?
- Is a qualification matrix maintained and used?
P6.3 — Resources (equipment, tools, gauges)
- Is equipment maintained per a preventive maintenance plan?
- Are calibration records current for all measurement equipment?
- Are work instructions present at every workstation and at the correct revision?
P6.4 — Failure mode prevention (error-proofing)
- Are poka-yoke devices in place for all High-AP failure modes?
- Are error-proofing devices checked at the correct frequency?
- Is the check result documented?
P6.5 — Quality inspections and tests
- Are incoming inspection, in-process inspection, and final inspection defined and performed?
- Are inspection records maintained and traceable?
- Is SPC in place for all special characteristics?
P6.6 — Non-conformance management
- Is non-conforming material identified, segregated, and controlled?
- Is there a defined reaction plan for out-of-control conditions?
- Are non-conformances escalated to quality and documented?
P6.7 — Continuous improvement
- Are quality KPIs tracked (reject rate, scrap, rework, OEE)?
- Are improvement actions driven by data?
- Are lessons learned captured and applied?
Step 5 — Conduct the audit
Pre-audit:
- Request all relevant documentation: Process Flow, PFMEA, Control Plan, WIs, maintenance records, calibration records, training records
- Review and identify gaps before the site visit
- Confirm auditor qualification: VDA 6.3 audits require a trained, qualified auditor — internal auditors must hold a recognised VDA 6.3 auditor qualification (VDA QMC certification or OEM-equivalent). An unqualified person conducting the audit invalidates the result.
- Confirm auditor independence: the auditor must not have direct responsibility for the process being audited. Self-assessment by the process owner is not a substitute for an independent audit.
Opening meeting:
- Confirm scope, timing, and audit plan
- Introduce audit team and request the process owner to accompany
Process walk (the audit):
- Follow the process flow physically — start from incoming material, end at shipment
- For each step: observe, ask, verify records
- Ask: "Show me the record for this" — never accept verbal confirmation
- Score each question in real time; document evidence (positive and negative)
Findings classification:
- Score 6: Partial fulfilment — finding documented, corrective action required; deadline typically 90 days
- Score 4: Insufficient fulfilment — significant gap, represents active risk to quality; escalate deadline; customer OEMs often treat score-4 findings on critical questions (P6.4, P6.5, P6.6) as major deficiencies requiring immediate corrective action
- Score 2: Not fulfilled — systematic failure, high risk; corrective action with accelerated timeline required before next delivery
- Score 0: No evidence / not implemented — blocking; re-audit required before SOP release (if P1 applicable)
Closing meeting:
- Present scores and degree of fulfillment per element
- Confirm overall rating (A, B, or C)
- Agree on corrective action deadlines (typically 90 days for B-rating findings; accelerated for score-2 and score-4 findings)
- For B rating: schedule a follow-up audit or evidence review within 3 months to verify corrective actions are implemented — do not close the audit without this commitment in writing
- Confirm re-audit requirements if applicable (mandatory for C rating)
Step 6 — Audit report structure
The VDA 6.3 report must contain:
- Audit information: date, location, auditor, auditee, scope
- Degree of fulfillment per element (P1–P7 as applicable)
- Overall rating (A, B, C)
- Finding list: for each score ≤ 6 — question, observation, evidence, score, deadline
- Positive findings: best practices worth noting
- Corrective action plan (CAP): supplier-signed, with root cause and due date per finding
- Re-audit requirement if C rating
Validation criteria
A VDA 6.3 audit is complete when:
- All applicable elements (P5, P6, P7 minimum for series) have been scored
- All findings (score ≤ 6) are documented with evidence
- Degree of fulfillment calculated and overall rating stated
- Corrective action plan signed by supplier quality management
- Re-audit scheduled if rating is C
Common mistakes
- Auditor accepts verbal confirmation as evidence — always request the record
- Skipping the process walk and only reviewing documents — P6 requires observation of the live process
- Not documenting positive evidence — the report must balance findings and strengths
- Calculating degree of fulfillment without applying question weights
- Not confirming error-proofing device checks are being performed at the required frequency
- Closing meeting without confirming the corrective action deadline in writing
- Rating B without scheduling a follow-up to verify corrective actions are implemented
Output Format
At the start of each use, ask the user:
"How would you like to receive the output?
A — Structured Markdown (formatted tables and sections, ready to copy)
B — Plain tables (simplified structure for Excel or Word)
C — Narrative report (flowing text for a formal document or email)
Default: A."
Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.
Changelog
| Version |
Date |
Author |
Change |
| 1.0 |
2026-06-06 |
@RBraga01 |
Initial release |
| 1.1 |
2026-06-06 |
@migmcc |
Expanded weighting system explanation in Step 3; added auditor qualification and independence requirements; improved findings classification (score 4 vs 6 distinction); added B-rating follow-up timeline |
1---2name: vda-6-3-audit3description: >-4 VDA 6.3 Process Audit — conduct or prepare for a process audit using the VDA 6.3 methodology,5 evaluate process elements P1–P7, calculate degree of fulfillment, classify findings, and generate6 an audit report. Use when a customer requests a VDA 6.3 audit, when auditing a supplier's7 manufacturing process, or when preparing for a VDA process audit visit. Covers VDA 6.3 4th edition (2023).8license: MIT9metadata:10 source: https://skillmd.com/skills/hashgraph-online/vda-6-3-audit11 author: RBraga0112 version: "1.1"13 iatf-16949: "9.2.2"14 vda-reference: "VDA 6.3 Process Audit 4th Edition 2023"15 domain: quality-engineering16 subdomain: audit17 industries: automotive,electronics,general18 status: approved19 created: "2026-06-06"20 last_updated: "2026-06-06"21 updated_by: migmcc22 reviewed_by: RBraga0123 standard_edition: "VDA 6.3 Process Audit 4th Edition (2023)"24---2526# VDA 6.3 Process Audit2728## When to use2930Use this skill when:31- Conducting a VDA 6.3 process audit at a supplier or internally32- Preparing for an OEM process audit visit (BMW, VW, Audi, Mercedes, Porsche, Stellantis)33- Auditing a new supplier during qualification34- Responding to a customer concern by conducting a focused process audit35- Evaluating a supplier's manufacturing process capability before SOP3637## Prerequisites3839- Customer audit scope (which process/product to audit)40- VDA 6.3 question catalogue (the auditor works from the standard questions)41- Process Flow Diagram, PFMEA, Control Plan, and Work Instructions for the audited process42- Access to the production area, equipment records, personnel, and quality records4344## Workflow4546### Step 1 — VDA 6.3 Structure Overview4748VDA 6.3 is organised into 7 process elements (P1–P7):4950| Element | Name | Applies to |51|---------|------|-----------|52| P1 | Potential Analysis | New suppliers — evaluates readiness before series production |53| P2 | Project Management | APQP and product/process development process |54| P3 | Planning the Product and Process Development | Design and process planning activities |55| P4 | Supplier Management (Purchasing) | Sub-supplier control and qualification |56| P5 | Process Input / Series | Incoming materials and components |57| P6 | Process Execution / Customer Satisfaction / Service | The manufacturing process itself |58| P7 | Customer Support / Customer Satisfaction / Service | Delivery performance, escalation, field support |5960**For a focused series production audit (most common):** P5, P6, P7 are mandatory. P1–P4 are added for new supplier qualification or product launch audits.6162---6364### Step 2 — Rating system6566Every question in VDA 6.3 is scored on a 0–10 scale:6768| Score | Meaning |69|-------|---------|70| **10** | All requirements fulfilled — systematic, effective, and documented evidence exists |71| **8** | Requirement largely fulfilled — minor gaps, no systematic risk |72| **6** | Requirement partially fulfilled — deviations exist, limited risk |73| **4** | Requirement insufficiently fulfilled — significant gaps, risk to quality |74| **2** | Requirement not fulfilled — systematic failure, high risk |75| **0** | Not applicable OR not fulfilled with no evidence |7677A score of **4 or less** on any question is a deficiency and must be documented with a finding and corrective action requirement.7879---8081### Step 3 — Degree of Fulfillment calculation8283For each process element:8485**Element score (%) = (Sum of all question scores) / (Maximum possible score) × 100**8687**Weighting system (critical):** Each question in the VDA 6.3 question catalogue has a pre-assigned weighting factor of 1, 2, or 3. These weights are fixed in the standard — the auditor cannot change them. Questions covering safety-critical topics (error-proofing, special characteristics control, non-conformance segregation) typically carry weight 2 or 3. The maximum possible score per question = 10 × weighting factor.8889To calculate the degree of fulfillment correctly:90- Use the official VDA 6.3 question catalogue, which lists each question with its weight91- Sum (score × weight) for all applicable questions in the element92- Divide by the sum of (10 × weight) for all applicable questions93- Do not average raw scores — applying equal weight to all questions is a calculation error that produces incorrect element ratings9495If a question is not applicable (N/A), it is excluded from both the numerator and denominator.9697#### VDA 6.3 rating thresholds9899| Degree of fulfillment | Rating | Interpretation |100|----------------------|--------|----------------|101| ≥ 90% | A | Process suitable for series production — no significant concerns |102| 75% – < 90% | B | Conditionally suitable — corrective actions required within agreed timeframe |103| < 75% | C | Not suitable — series production release blocked until corrective action complete |104105A rating of **C blocks SOP** — the customer will not release the supplier for series production until re-audit achieves at least B.106107---108109### Step 4 — P6 — Process Execution (the core audit)110111P6 is the most extensive element and covers the actual manufacturing process. Key areas:112113**P6.1 — Process inputs**114- Are incoming materials and components controlled?115- Are change management procedures in place and effective?116- Are specifications current and accessible at point of use?117118**P6.2 — Personnel**119- Are operators qualified and trained for the tasks they perform?120- Are training records current?121- Is a qualification matrix maintained and used?122123**P6.3 — Resources (equipment, tools, gauges)**124- Is equipment maintained per a preventive maintenance plan?125- Are calibration records current for all measurement equipment?126- Are work instructions present at every workstation and at the correct revision?127128**P6.4 — Failure mode prevention (error-proofing)**129- Are poka-yoke devices in place for all High-AP failure modes?130- Are error-proofing devices checked at the correct frequency?131- Is the check result documented?132133**P6.5 — Quality inspections and tests**134- Are incoming inspection, in-process inspection, and final inspection defined and performed?135- Are inspection records maintained and traceable?136- Is SPC in place for all special characteristics?137138**P6.6 — Non-conformance management**139- Is non-conforming material identified, segregated, and controlled?140- Is there a defined reaction plan for out-of-control conditions?141- Are non-conformances escalated to quality and documented?142143**P6.7 — Continuous improvement**144- Are quality KPIs tracked (reject rate, scrap, rework, OEE)?145- Are improvement actions driven by data?146- Are lessons learned captured and applied?147148---149150### Step 5 — Conduct the audit151152**Pre-audit:**153- Request all relevant documentation: Process Flow, PFMEA, Control Plan, WIs, maintenance records, calibration records, training records154- Review and identify gaps before the site visit155- Confirm auditor qualification: VDA 6.3 audits require a trained, qualified auditor — internal auditors must hold a recognised VDA 6.3 auditor qualification (VDA QMC certification or OEM-equivalent). An unqualified person conducting the audit invalidates the result.156- Confirm auditor independence: the auditor must not have direct responsibility for the process being audited. Self-assessment by the process owner is not a substitute for an independent audit.157158**Opening meeting:**159- Confirm scope, timing, and audit plan160- Introduce audit team and request the process owner to accompany161162**Process walk (the audit):**163- Follow the process flow physically — start from incoming material, end at shipment164- For each step: observe, ask, verify records165- Ask: "Show me the record for this" — never accept verbal confirmation166- Score each question in real time; document evidence (positive and negative)167168**Findings classification:**169- **Score 6:** Partial fulfilment — finding documented, corrective action required; deadline typically 90 days170- **Score 4:** Insufficient fulfilment — significant gap, represents active risk to quality; escalate deadline; customer OEMs often treat score-4 findings on critical questions (P6.4, P6.5, P6.6) as major deficiencies requiring immediate corrective action171- **Score 2:** Not fulfilled — systematic failure, high risk; corrective action with accelerated timeline required before next delivery172- **Score 0:** No evidence / not implemented — blocking; re-audit required before SOP release (if P1 applicable)173174**Closing meeting:**175- Present scores and degree of fulfillment per element176- Confirm overall rating (A, B, or C)177- Agree on corrective action deadlines (typically 90 days for B-rating findings; accelerated for score-2 and score-4 findings)178- For B rating: schedule a follow-up audit or evidence review within 3 months to verify corrective actions are implemented — do not close the audit without this commitment in writing179- Confirm re-audit requirements if applicable (mandatory for C rating)180181---182183### Step 6 — Audit report structure184185The VDA 6.3 report must contain:1861871. Audit information: date, location, auditor, auditee, scope1882. Degree of fulfillment per element (P1–P7 as applicable)1893. Overall rating (A, B, C)1904. Finding list: for each score ≤ 6 — question, observation, evidence, score, deadline1915. Positive findings: best practices worth noting1926. Corrective action plan (CAP): supplier-signed, with root cause and due date per finding1937. Re-audit requirement if C rating194195---196197## Validation criteria198199A VDA 6.3 audit is complete when:200- All applicable elements (P5, P6, P7 minimum for series) have been scored201- All findings (score ≤ 6) are documented with evidence202- Degree of fulfillment calculated and overall rating stated203- Corrective action plan signed by supplier quality management204- Re-audit scheduled if rating is C205206## Common mistakes207208- Auditor accepts verbal confirmation as evidence — always request the record209- Skipping the process walk and only reviewing documents — P6 requires observation of the live process210- Not documenting positive evidence — the report must balance findings and strengths211- Calculating degree of fulfillment without applying question weights212- Not confirming error-proofing device checks are being performed at the required frequency213- Closing meeting without confirming the corrective action deadline in writing214- Rating B without scheduling a follow-up to verify corrective actions are implemented215216## Output Format217218At the start of each use, ask the user:219220> "How would you like to receive the output?221> **A** — Structured Markdown (formatted tables and sections, ready to copy)222> **B** — Plain tables (simplified structure for Excel or Word)223> **C** — Narrative report (flowing text for a formal document or email)224>225> Default: A."226227Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.228229## Changelog230231| Version | Date | Author | Change |232|---------|------|--------|--------|233| 1.0 | 2026-06-06 | @RBraga01 | Initial release |234| 1.1 | 2026-06-06 | @migmcc | Expanded weighting system explanation in Step 3; added auditor qualification and independence requirements; improved findings classification (score 4 vs 6 distinction); added B-rating follow-up timeline |