verification-before-completion
Intent
- 用于最终验收:当准备声称任务已完成、已修复、已通过,尤其是在最终交付、commit 或 PR 之前,需要新的验证证据时使用。Prefer
systematic-debuggingfor 诊断,Prefertest-driven-developmentfor 实现过程。
Default operating pattern
- Capture the actual engineering goal and the next decision that matters.
- Inspect the current code, tests, branch state, or CI context before acting.
- Take the smallest next action that reduces uncertainty or advances delivery.
- Collect fresh evidence before claiming progress.
- Summarize status, risks, and the next recommended step.
Pack fit
- Included in:
engineering-workflow,release-quality,skill-authoring - Keep examples generic, privacy-safe, and portable across hosts.
Boundary
- Do not replace earlier debugging or design thinking with a final checklist too early.