Product Strategy
Priority: P0 (CRITICAL)
Frame strategic opportunities and falsifiable hypotheses anchored in reviewed strategic authority, explicit non-goals, and viability constraints, without conflating prioritization scores with financial ROI or fabricating approval.
1. Capability Preflight
Verify product-evidence capability before validating or committing changes to docs/product/<slug>/evidence.json:
- Skill Resolution: Load through MCP (
get_skill("product-management", "product-evidence")) or resolve installed root paths <root>/product-management/product-evidence/SKILL.md, <root>/product-evidence/SKILL.md, or flattened Kiro <root>/product-management-product-evidence/SKILL.md. A missing/excluded skill is a capability gap; never infer installation from source checkout.
- Companion Resource: Resolve
scripts/validate-product-evidence.mjs relative to the loaded package directory (ordinary <root>/product-management/product-evidence/; flattened <root>/product-management-product-evidence/). Missing companion is a separate resource gap.
- Runtime: Check Node.js >=20 separately. Missing runtime is not a missing skill/resource.
- Offline Mode: If any prerequisite is absent, safe research/proposal work may proceed only as
unvalidated; no simulated validation, readiness claim, or silent sync/install.
2. Core Protocol
- Strategic Authority & Gap Audit:
- Inspect
strategy_authority in docs/product/<slug>/evidence.json. It must bind to an exact AUTH record revision in the strategy domain (never the technical SRS or H1 implementation hash).
- If strategy authority is absent or conflicting, set
strategy_authority: null and record an explicit strategy_gap. Permit proposal-only synthesis; never record binding decisions or invent strategy mandates.
- Opportunity Framing (
OPP):
- Synthesize verified problems and customer jobs from
CLM records into OPP records.
- Mandate explicit non-goals and trade-offs in
rationale. Define what the product deliberately will NOT do.
- Always include the "do nothing / defer" option alongside active alternatives.
- Hypothesis Synthesis & Disconfirmation (
HYP):
- Formulate falsifiable hypotheses: prediction, proposed causal mechanism, and supporting claims.
- Define unambiguous disconfirmation criteria (the exact observation that would prove the hypothesis false).
- Link candidate primary metrics (
MET refs) without claiming premature validation.
- Decision Recommendation Framing (
DEC):
- Create proposed decision recommendations (
status: "proposed", outcome: "propose").
- Strategy binding is
null for proposed learning decisions; it is required only for recorded investment, specification, or value_review decisions. Include all critical_claims in depends_on.
- Immutable DEC Invariant: Once recorded, a DEC row is immutable in
records. Supersession or revocation requires issuing a new DEC ID in records with supersedes: { id, revision }. Never move an immutable recorded DEC to record_history.
- Define explicit
revisit_triggers on data (distinct from freshness.review_triggers).
- Authority Gate: Product strategy proposals recommend actions; they do NOT grant budget or authorize spend without separate human/operator approval.
- No Score-to-ROI Conversion:
- Heuristic scores (RICE, WSJF, Kano) are relative ordering tools, not financial accounting. Never convert a prioritization score into monetary benefit, net ROI, or NPV.
3. Anti-Patterns & Red Flags
- No Missing Non-Goals: Reject strategy documents that promise everything without trade-offs.
- No Score as ROI: Never claim a high RICE score proves positive financial return.
- No Rewriting Recorded Decisions: Never edit or move a recorded DEC to
record_history.
- Stop if Strategy Conflicted: If two directives conflict, set
strategy_authority: null, record gap, and halt recording decisions.
4. References
- Strategy Protocol — Strategic alignment, non-goals, and authority binding.
- Opportunity Framing — Structuring
OPP records, hypotheses, and trade-offs.
- Evidence Mapping — Schema mapping to
OPP, HYP, and proposed DEC records.
- Citations and Sources — Conceptual citations and independent authorship statement.
- Semantic Rubrics — Outcome-based grading rubrics and false-pass rejection criteria.
- Synthetic Example Ledger — Complete valid standalone synthetic ledger.
1---2name: product-strategy3description: 'Formulate coherent product strategy, synthesize opportunity frames and falsifiable hypotheses, establish non-goals and trade-offs, and bind decisions to verified strategic authority. (triggers: `product strategy decision`, `product opportunity framing`)'4guardrail: true5metadata:6 source: https://skillmd.com/skills/hoangnguyen0403/product-strategy7 triggers:8 files: []9 keywords:10 - product strategy decision11 - product opportunity framing12---1314# Product Strategy1516## **Priority: P0 (CRITICAL)**1718Frame strategic opportunities and falsifiable hypotheses anchored in reviewed strategic authority, explicit non-goals, and viability constraints, without conflating prioritization scores with financial ROI or fabricating approval.1920## 1. Capability Preflight2122Verify `product-evidence` capability before validating or committing changes to `docs/product/<slug>/evidence.json`:231. **Skill Resolution**: Load through MCP (`get_skill("product-management", "product-evidence")`) or resolve installed root paths `<root>/product-management/product-evidence/SKILL.md`, `<root>/product-evidence/SKILL.md`, or flattened Kiro `<root>/product-management-product-evidence/SKILL.md`. A missing/excluded skill is a capability gap; never infer installation from source checkout.242. **Companion Resource**: Resolve `scripts/validate-product-evidence.mjs` relative to the loaded package directory (ordinary `<root>/product-management/product-evidence/`; flattened `<root>/product-management-product-evidence/`). Missing companion is a separate resource gap.253. **Runtime**: Check Node.js >=20 separately. Missing runtime is not a missing skill/resource.264. **Offline Mode**: If any prerequisite is absent, safe research/proposal work may proceed only as `unvalidated`; no simulated validation, readiness claim, or silent sync/install.2728## 2. Core Protocol29301. **Strategic Authority & Gap Audit**:31 - Inspect `strategy_authority` in `docs/product/<slug>/evidence.json`. It must bind to an exact `AUTH` record revision in the `strategy` domain (never the technical SRS or H1 implementation hash).32 - If strategy authority is absent or conflicting, set `strategy_authority: null` and record an explicit `strategy_gap`. Permit proposal-only synthesis; never record binding decisions or invent strategy mandates.332. **Opportunity Framing (`OPP`)**:34 - Synthesize verified problems and customer jobs from `CLM` records into `OPP` records.35 - Mandate explicit **non-goals** and trade-offs in `rationale`. Define what the product deliberately will NOT do.36 - Always include the "do nothing / defer" option alongside active alternatives.373. **Hypothesis Synthesis & Disconfirmation (`HYP`)**:38 - Formulate falsifiable hypotheses: prediction, proposed causal mechanism, and supporting claims.39 - Define unambiguous **disconfirmation criteria** (the exact observation that would prove the hypothesis false).40 - Link candidate primary metrics (`MET` refs) without claiming premature validation.414. **Decision Recommendation Framing (`DEC`)**:42 - Create proposed decision recommendations (`status: "proposed"`, `outcome: "propose"`).43 - Strategy binding is `null` for proposed learning decisions; it is required only for recorded investment, specification, or value_review decisions. Include all `critical_claims` in `depends_on`.44 - **Immutable DEC Invariant**: Once recorded, a DEC row is immutable in `records`. Supersession or revocation requires issuing a new DEC ID in `records` with `supersedes: { id, revision }`. Never move an immutable recorded DEC to `record_history`.45 - Define explicit `revisit_triggers` on `data` (distinct from `freshness.review_triggers`).46 - **Authority Gate**: Product strategy proposals recommend actions; they do NOT grant budget or authorize spend without separate human/operator approval.475. **No Score-to-ROI Conversion**:48 - Heuristic scores (RICE, WSJF, Kano) are relative ordering tools, not financial accounting. Never convert a prioritization score into monetary benefit, net ROI, or NPV.4950## 3. Anti-Patterns & Red Flags5152- **No Missing Non-Goals**: Reject strategy documents that promise everything without trade-offs.53- **No Score as ROI**: Never claim a high RICE score proves positive financial return.54- **No Rewriting Recorded Decisions**: Never edit or move a recorded DEC to `record_history`.55- **Stop if Strategy Conflicted**: If two directives conflict, set `strategy_authority: null`, record gap, and halt recording decisions.5657## 4. References5859- [Strategy Protocol](references/strategy-protocol.md) — Strategic alignment, non-goals, and authority binding.60- [Opportunity Framing](references/opportunity-framing.md) — Structuring `OPP` records, hypotheses, and trade-offs.61- [Evidence Mapping](references/evidence-mapping.md) — Schema mapping to `OPP`, `HYP`, and proposed `DEC` records.62- [Citations and Sources](references/citations-and-sources.md) — Conceptual citations and independent authorship statement.63- [Semantic Rubrics](references/semantic-rubrics.md) — Outcome-based grading rubrics and false-pass rejection criteria.64- [Synthetic Example Ledger](references/examples/synthetic-strategy-ledger.json) — Complete valid standalone synthetic ledger.