Product Capability
This skill turns product intent into explicit engineering constraints.
Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"
When to Use
- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit
- A feature crosses multiple services, repos, or teams and needs a capability contract before coding
- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy
- Senior engineers keep restating the same hidden assumptions during review
- You need a reusable artifact that can survive across harnesses and sessions
Canonical Artifact
If the repo has a durable product-context file such as PRODUCT.md, docs/product/, or a program-spec directory, update it there.
If no capability manifest exists yet, create one using the template at:
docs/examples/product-capability-template.md
The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.
Non-Negotiable Rules
- Do not invent product truth. Mark unresolved questions explicitly.
- Separate user-visible promises from implementation details.
- Call out what is fixed policy, what is architecture preference, and what is still open.
- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.
- Prefer one reusable capability artifact over scattered ad hoc notes.
Inputs
Read only what is needed:
- Product intent
- issue, discussion, PRD, roadmap note, founder message
- Current architecture
- relevant repo docs, contracts, schemas, routes, existing workflows
- Existing capability context
PRODUCT.md, design docs, RFCs, migration notes, operating-model docs
- Delivery constraints
- auth, billing, compliance, rollout, backwards compatibility, performance, review policy
Core Workflow
1. Restate the capability
Compress the ask into one precise statement:
- who the user or operator is
- what new capability exists after this ships
- what outcome changes because of it
If this statement is weak, the implementation will drift.
2. Resolve capability constraints
Extract the constraints that must hold before implementation:
- business rules
- scope boundaries
- invariants
- trust boundaries
- data ownership
- lifecycle transitions
- rollout / migration requirements
- failure and recovery expectations
These are the things that often live only in senior-engineer memory.
3. Define the implementation-facing contract
Produce an SRS-style capability plan with:
- capability summary
- explicit non-goals
- actors and surfaces
- required states and transitions
- interfaces / inputs / outputs
- data model implications
- security / billing / policy constraints
- observability and operator requirements
- open questions blocking implementation
4. Translate into execution
End with the exact handoff:
- ready for direct implementation
- needs architecture review first
- needs product clarification first
If useful, point to the next ECC-native lane:
project-flow-ops
workspace-surface-audit
api-connector-builder
dashboard-builder
tdd-workflow
verification-loop
Output Format
Return the result in this order:
CAPABILITY
- one-paragraph restatement
CONSTRAINTS
- fixed rules, invariants, and boundaries
IMPLEMENTATION CONTRACT
- actors
- surfaces
- states and transitions
- interface/data implications
NON-GOALS
- what this lane explicitly does not own
OPEN QUESTIONS
- blockers or product decisions still required
HANDOFF
- what should happen next and which ECC lane should take it
Good Outcomes
- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.
- Engineering review has a durable artifact instead of relying on memory or Slack context.
- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.
1---2name: product-capability3description: Translate PRD intent, roadmap asks, or product discussions into an implementation-ready4 capability plan that exposes constraints, invariants, interfaces, and unresolved5 decisions before multi-service work starts. Use when the user needs an ECC-native6 PRD-to-SRS lane instead of vague planning prose.7origin: ECC8risk: safe9source: community10license: MIT11metadata:12 source: https://skillmd.com/skills/jantoniofc/product-capability13---1415# Product Capability1617This skill turns product intent into explicit engineering constraints.1819Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"2021## When to Use2223- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit24- A feature crosses multiple services, repos, or teams and needs a capability contract before coding25- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy26- Senior engineers keep restating the same hidden assumptions during review27- You need a reusable artifact that can survive across harnesses and sessions2829## Canonical Artifact3031If the repo has a durable product-context file such as `PRODUCT.md`, `docs/product/`, or a program-spec directory, update it there.3233If no capability manifest exists yet, create one using the template at:3435- `docs/examples/product-capability-template.md`3637The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.3839## Non-Negotiable Rules4041- Do not invent product truth. Mark unresolved questions explicitly.42- Separate user-visible promises from implementation details.43- Call out what is fixed policy, what is architecture preference, and what is still open.44- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.45- Prefer one reusable capability artifact over scattered ad hoc notes.4647## Inputs4849Read only what is needed:50511. Product intent52 - issue, discussion, PRD, roadmap note, founder message532. Current architecture54 - relevant repo docs, contracts, schemas, routes, existing workflows553. Existing capability context56 - `PRODUCT.md`, design docs, RFCs, migration notes, operating-model docs574. Delivery constraints58 - auth, billing, compliance, rollout, backwards compatibility, performance, review policy5960## Core Workflow6162### 1. Restate the capability6364Compress the ask into one precise statement:6566- who the user or operator is67- what new capability exists after this ships68- what outcome changes because of it6970If this statement is weak, the implementation will drift.7172### 2. Resolve capability constraints7374Extract the constraints that must hold before implementation:7576- business rules77- scope boundaries78- invariants79- trust boundaries80- data ownership81- lifecycle transitions82- rollout / migration requirements83- failure and recovery expectations8485These are the things that often live only in senior-engineer memory.8687### 3. Define the implementation-facing contract8889Produce an SRS-style capability plan with:9091- capability summary92- explicit non-goals93- actors and surfaces94- required states and transitions95- interfaces / inputs / outputs96- data model implications97- security / billing / policy constraints98- observability and operator requirements99- open questions blocking implementation100101### 4. Translate into execution102103End with the exact handoff:104105- ready for direct implementation106- needs architecture review first107- needs product clarification first108109If useful, point to the next ECC-native lane:110111- `project-flow-ops`112- `workspace-surface-audit`113- `api-connector-builder`114- `dashboard-builder`115- `tdd-workflow`116- `verification-loop`117118## Output Format119120Return the result in this order:121122```text123CAPABILITY124- one-paragraph restatement125126CONSTRAINTS127- fixed rules, invariants, and boundaries128129IMPLEMENTATION CONTRACT130- actors131- surfaces132- states and transitions133- interface/data implications134135NON-GOALS136- what this lane explicitly does not own137138OPEN QUESTIONS139- blockers or product decisions still required140141HANDOFF142- what should happen next and which ECC lane should take it143```144145## Good Outcomes146147- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.148- Engineering review has a durable artifact instead of relying on memory or Slack context.149- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.