Risk Management Specialist
ISO 14971:2019 risk management implementation throughout the medical device lifecycle.
Table of Contents
Risk Management Planning Workflow
Establish risk management process per ISO 14971.
Workflow: Create Risk Management Plan
- Define scope of risk management activities:
- Medical device identification
- Lifecycle stages covered
- Applicable standards and regulations
- Establish risk acceptability criteria:
- Define probability categories (P1-P5)
- Define severity categories (S1-S5)
- Create risk matrix with acceptance thresholds
- Assign responsibilities:
- Risk management lead
- Subject matter experts
- Approval authorities
- Define verification activities:
- Methods for control verification
- Acceptance criteria
- Plan production and post-production activities:
- Information sources
- Review triggers
- Update procedures
- Obtain plan approval
- Establish risk management file
- Validation: Plan approved; acceptability criteria defined; responsibilities assigned; file established
Risk Management Plan Content
| Section |
Content |
Evidence |
| Scope |
Device and lifecycle coverage |
Scope statement |
| Criteria |
Risk acceptability matrix |
Risk matrix document |
| Responsibilities |
Roles and authorities |
RACI chart |
| Verification |
Methods and acceptance |
Verification plan |
| Production/Post-Production |
Monitoring activities |
Surveillance plan |
Risk Acceptability Matrix (5x5)
| Probability \ Severity |
Negligible |
Minor |
Serious |
Critical |
Catastrophic |
| Frequent (P5) |
Medium |
High |
High |
Unacceptable |
Unacceptable |
| Probable (P4) |
Medium |
Medium |
High |
High |
Unacceptable |
| Occasional (P3) |
Low |
Medium |
Medium |
High |
High |
| Remote (P2) |
Low |
Low |
Medium |
Medium |
High |
| Improbable (P1) |
Low |
Low |
Low |
Medium |
Medium |
Risk Level Actions
| Level |
Acceptable |
Action Required |
| Low |
Yes |
Document and accept |
| Medium |
ALARP |
Reduce if practicable; document rationale |
| High |
ALARP |
Reduction required; demonstrate ALARP |
| Unacceptable |
No |
Design change mandatory |
Risk Analysis Workflow
Identify hazards and estimate risks systematically.
Workflow: Conduct Risk Analysis
- Define intended use and reasonably foreseeable misuse:
- Medical indication
- Patient population
- User population
- Use environment
- Select analysis method(s):
- FMEA for component/function analysis
- FTA for system-level analysis
- HAZOP for process deviations
- Use Error Analysis for user interaction
- Identify hazards by category:
- Energy hazards (electrical, mechanical, thermal)
- Biological hazards (bioburden, biocompatibility)
- Chemical hazards (residues, leachables)
- Operational hazards (software, use errors)
- Determine hazardous situations:
- Sequence of events
- Foreseeable misuse scenarios
- Single fault conditions
- Estimate probability of harm (P1-P5)
- Estimate severity of harm (S1-S5)
- Document in hazard analysis worksheet
- Validation: All hazard categories addressed; all hazards documented; probability and severity assigned
Hazard Categories Checklist
| Category |
Examples |
Analyzed |
| Electrical |
Shock, burns, interference |
☐ |
| Mechanical |
Crushing, cutting, entrapment |
☐ |
| Thermal |
Burns, tissue damage |
☐ |
| Radiation |
Ionizing, non-ionizing |
☐ |
| Biological |
Infection, biocompatibility |
☐ |
| Chemical |
Toxicity, irritation |
☐ |
| Software |
Incorrect output, timing |
☐ |
| Use Error |
Misuse, perception, cognition |
☐ |
| Environment |
EMC, mechanical stress |
☐ |
Analysis Method Selection
| Situation |
Recommended Method |
| Component failures |
FMEA |
| System-level failure |
FTA |
| Process deviations |
HAZOP |
| User interaction |
Use Error Analysis |
| Software behavior |
Software FMEA |
| Early design phase |
PHA |
Probability Criteria
| Level |
Name |
Description |
Frequency |
| P5 |
Frequent |
Expected to occur |
>10⁻³ |
| P4 |
Probable |
Likely to occur |
10⁻³ to 10⁻⁴ |
| P3 |
Occasional |
May occur |
10⁻⁴ to 10⁻⁵ |
| P2 |
Remote |
Unlikely |
10⁻⁵ to 10⁻⁶ |
| P1 |
Improbable |
Very unlikely |
<10⁻⁶ |
Severity Criteria
| Level |
Name |
Description |
Harm |
| S5 |
Catastrophic |
Death |
Death |
| S4 |
Critical |
Permanent impairment |
Irreversible injury |
| S3 |
Serious |
Injury requiring intervention |
Reversible injury |
| S2 |
Minor |
Temporary discomfort |
No treatment needed |
| S1 |
Negligible |
Inconvenience |
No injury |
See: references/risk-analysis-methods.md
Risk Evaluation Workflow
Evaluate risks against acceptability criteria.
Workflow: Evaluate Identified Risks
- Calculate initial risk level from probability × severity
- Compare to risk acceptability criteria
- For each risk, determine:
- Acceptable: Document and accept
- ALARP: Proceed to risk control
- Unacceptable: Mandatory risk control
- Document evaluation rationale
- Identify risks requiring benefit-risk analysis
- Complete benefit-risk analysis if applicable
- Compile risk evaluation summary
- Validation: All risks evaluated; acceptability determined; rationale documented
Risk Evaluation Decision Tree
Risk Estimated
│
▼
Apply Acceptability Criteria
│
├── Low Risk ──────────► Accept and document
│
├── Medium Risk ───────► Consider risk reduction
│ │ Document ALARP if not reduced
│ ▼
│ Practicable to reduce?
│ │
│ Yes──► Implement control
│ No───► Document ALARP rationale
│
├── High Risk ─────────► Risk reduction required
│ │ Must demonstrate ALARP
│ ▼
│ Implement control
│ Verify residual risk
│
└── Unacceptable ──────► Design change mandatory
Cannot proceed without control
ALARP Demonstration Requirements
| Criterion |
Evidence Required |
| Technical feasibility |
Analysis of alternative controls |
| Proportionality |
Cost-benefit of further reduction |
| State of the art |
Comparison to similar devices |
| Stakeholder input |
Clinical/user perspectives |
Benefit-Risk Analysis Triggers
| Situation |
Benefit-Risk Required |
| Residual risk remains high |
Yes |
| No feasible risk reduction |
Yes |
| Novel device |
Yes |
| Unacceptable risk with clinical benefit |
Yes |
| All risks low |
No |
Risk Control Workflow
Implement and verify risk control measures.
Workflow: Implement Risk Controls
- Identify risk control options:
- Inherent safety by design (Priority 1)
- Protective measures in device (Priority 2)
- Information for safety (Priority 3)
- Select optimal control following hierarchy
- Analyze control for new hazards introduced
- Document control in design requirements
- Implement control in design
- Develop verification protocol
- Execute verification and document results
- Evaluate residual risk with control in place
- Validation: Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards
Risk Control Hierarchy
| Priority |
Control Type |
Examples |
Effectiveness |
| 1 |
Inherent Safety |
Eliminate hazard, fail-safe design |
Highest |
| 2 |
Protective Measures |
Guards, alarms, automatic shutdown |
High |
| 3 |
Information |
Warnings, training, IFU |
Lower |
Risk Control Option Analysis Template
RISK CONTROL OPTION ANALYSIS
Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]
OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]
IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]
VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]
Risk Control Verification Methods
| Method |
When to Use |
Evidence |
| Test |
Quantifiable performance |
Test report |
| Inspection |
Physical presence |
Inspection record |
| Analysis |
Design calculation |
Analysis report |
| Review |
Documentation check |
Review record |
Residual Risk Evaluation
| After Control |
Action |
| Acceptable |
Document, proceed |
| ALARP achieved |
Document rationale, proceed |
| Still unacceptable |
Additional control or design change |
| New hazard introduced |
Analyze and control new hazard |
Post-Production Risk Management
Monitor and update risk management throughout product lifecycle.
Workflow: Post-Production Risk Monitoring
- Identify information sources:
- Customer complaints
- Service reports
- Vigilance/adverse events
- Literature monitoring
- Clinical studies
- Establish collection procedures
- Define review triggers:
- New hazard identified
- Increased frequency of known hazard
- Serious incident
- Regulatory feedback
- Analyze incoming information for risk relevance
- Update risk management file as needed
- Communicate significant findings
- Conduct periodic risk management review
- Validation: Information sources monitored; file current; reviews completed per schedule
Information Sources
| Source |
Information Type |
Review Frequency |
| Complaints |
Use issues, failures |
Continuous |
| Service |
Field failures, repairs |
Monthly |
| Vigilance |
Serious incidents |
Immediate |
| Literature |
Similar device issues |
Quarterly |
| Regulatory |
Authority feedback |
As received |
| Clinical |
PMCF data |
Per plan |
Risk Management File Update Triggers
| Trigger |
Response Time |
Action |
| Serious incident |
Immediate |
Full risk review |
| New hazard identified |
30 days |
Risk analysis update |
| Trend increase |
60 days |
Trend analysis |
| Design change |
Before implementation |
Impact assessment |
| Standards update |
Per transition period |
Gap analysis |
Periodic Review Requirements
| Review Element |
Frequency |
| Risk management file completeness |
Annual |
| Risk control effectiveness |
Annual |
| Post-market information analysis |
Quarterly |
| Risk-benefit conclusions |
Annual or on new data |
Risk Assessment Templates
→ See references/risk-assessment-templates.md for details
Decision Frameworks
Risk Control Selection
What is the risk level?
│
├── Unacceptable ──► Can hazard be eliminated?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Eliminate Can protective
│ hazard measure reduce?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Add Add warning
│ protection + training
│
└── High/Medium ──► Apply hierarchy
starting at Level 1
New Hazard Analysis
| Question |
If Yes |
If No |
| Does control introduce new hazard? |
Analyze new hazard |
Proceed |
| Is new risk higher than original? |
Reject control option |
Acceptable trade-off |
| Can new hazard be controlled? |
Add control |
Reject control option |
Risk Acceptability Decision
| Condition |
Decision |
| All risks Low |
Acceptable |
| Medium risks with ALARP |
Acceptable |
| High risks with ALARP documented |
Acceptable if benefits outweigh |
| Any Unacceptable residual |
Not acceptable - redesign |
Tools and References
Scripts
| Tool |
Purpose |
Usage |
| risk_matrix_calculator.py |
Calculate risk levels and FMEA RPN |
python risk_matrix_calculator.py --help |
Risk Matrix Calculator Features:
- ISO 14971 5x5 risk matrix calculation
- FMEA RPN (Risk Priority Number) calculation
- Interactive mode for guided assessment
- Display risk criteria definitions
- JSON output for integration
References
| Document |
Content |
| iso14971-implementation-guide.md |
Complete ISO 14971:2019 implementation with templates |
| risk-analysis-methods.md |
FMEA, FTA, HAZOP, Use Error Analysis methods |
Quick Reference: ISO 14971 Process
| Stage |
Key Activities |
Output |
| Planning |
Define scope, criteria, responsibilities |
Risk Management Plan |
| Analysis |
Identify hazards, estimate risk |
Hazard Analysis |
| Evaluation |
Compare to criteria, ALARP assessment |
Risk Evaluation |
| Control |
Implement hierarchy, verify |
Risk Control Records |
| Residual |
Overall assessment, benefit-risk |
Risk Management Report |
| Production |
Monitor, review, update |
Updated RM File |
Related Skills
When to Use
Medical device risk management specialist implementing ISO 14971 throughout product lifecycle. Provides risk analysis, risk evaluation, risk control, and post-production information analysis.
Covers: Risk Management Planning Workflow, Workflow: Create Risk Management Plan, Risk Management Plan Content, Risk Acceptability Matrix (5x5), Risk Level Actions.
1---2name: risk-management-specialist3description: Medical device risk management specialist implementing ISO 14971 throughout4 product lifecycle. Provides risk analysis, risk evaluation, risk control, and post-production5 information analysis. Use when user mentions risk management, ISO 14971, risk analysis,6 FMEA, fault tree analysis, hazard ident...7risk: safe8source: community9license: MIT10metadata:11 source: https://skillmd.com/skills/jantoniofc/risk-management-specialist12---1314# Risk Management Specialist1516ISO 14971:2019 risk management implementation throughout the medical device lifecycle.1718---1920## Table of Contents2122- [Risk Management Planning Workflow](#risk-management-planning-workflow)23- [Risk Analysis Workflow](#risk-analysis-workflow)24- [Risk Evaluation Workflow](#risk-evaluation-workflow)25- [Risk Control Workflow](#risk-control-workflow)26- [Post-Production Risk Management](#post-production-risk-management)27- [Risk Assessment Templates](#risk-assessment-templates)28- [Decision Frameworks](#decision-frameworks)29- [Tools and References](#tools-and-references)3031---3233## Risk Management Planning Workflow3435Establish risk management process per ISO 14971.3637### Workflow: Create Risk Management Plan38391. Define scope of risk management activities:40 - Medical device identification41 - Lifecycle stages covered42 - Applicable standards and regulations432. Establish risk acceptability criteria:44 - Define probability categories (P1-P5)45 - Define severity categories (S1-S5)46 - Create risk matrix with acceptance thresholds473. Assign responsibilities:48 - Risk management lead49 - Subject matter experts50 - Approval authorities514. Define verification activities:52 - Methods for control verification53 - Acceptance criteria545. Plan production and post-production activities:55 - Information sources56 - Review triggers57 - Update procedures586. Obtain plan approval597. Establish risk management file608. **Validation:** Plan approved; acceptability criteria defined; responsibilities assigned; file established6162### Risk Management Plan Content6364| Section | Content | Evidence |65|---------|---------|----------|66| Scope | Device and lifecycle coverage | Scope statement |67| Criteria | Risk acceptability matrix | Risk matrix document |68| Responsibilities | Roles and authorities | RACI chart |69| Verification | Methods and acceptance | Verification plan |70| Production/Post-Production | Monitoring activities | Surveillance plan |7172### Risk Acceptability Matrix (5x5)7374| Probability \ Severity | Negligible | Minor | Serious | Critical | Catastrophic |75|------------------------|------------|-------|---------|----------|--------------|76| **Frequent (P5)** | Medium | High | High | Unacceptable | Unacceptable |77| **Probable (P4)** | Medium | Medium | High | High | Unacceptable |78| **Occasional (P3)** | Low | Medium | Medium | High | High |79| **Remote (P2)** | Low | Low | Medium | Medium | High |80| **Improbable (P1)** | Low | Low | Low | Medium | Medium |8182### Risk Level Actions8384| Level | Acceptable | Action Required |85|-------|------------|-----------------|86| Low | Yes | Document and accept |87| Medium | ALARP | Reduce if practicable; document rationale |88| High | ALARP | Reduction required; demonstrate ALARP |89| Unacceptable | No | Design change mandatory |9091---9293## Risk Analysis Workflow9495Identify hazards and estimate risks systematically.9697### Workflow: Conduct Risk Analysis98991. Define intended use and reasonably foreseeable misuse:100 - Medical indication101 - Patient population102 - User population103 - Use environment1042. Select analysis method(s):105 - FMEA for component/function analysis106 - FTA for system-level analysis107 - HAZOP for process deviations108 - Use Error Analysis for user interaction1093. Identify hazards by category:110 - Energy hazards (electrical, mechanical, thermal)111 - Biological hazards (bioburden, biocompatibility)112 - Chemical hazards (residues, leachables)113 - Operational hazards (software, use errors)1144. Determine hazardous situations:115 - Sequence of events116 - Foreseeable misuse scenarios117 - Single fault conditions1185. Estimate probability of harm (P1-P5)1196. Estimate severity of harm (S1-S5)1207. Document in hazard analysis worksheet1218. **Validation:** All hazard categories addressed; all hazards documented; probability and severity assigned122123### Hazard Categories Checklist124125| Category | Examples | Analyzed |126|----------|----------|----------|127| Electrical | Shock, burns, interference | ☐ |128| Mechanical | Crushing, cutting, entrapment | ☐ |129| Thermal | Burns, tissue damage | ☐ |130| Radiation | Ionizing, non-ionizing | ☐ |131| Biological | Infection, biocompatibility | ☐ |132| Chemical | Toxicity, irritation | ☐ |133| Software | Incorrect output, timing | ☐ |134| Use Error | Misuse, perception, cognition | ☐ |135| Environment | EMC, mechanical stress | ☐ |136137### Analysis Method Selection138139| Situation | Recommended Method |140|-----------|-------------------|141| Component failures | FMEA |142| System-level failure | FTA |143| Process deviations | HAZOP |144| User interaction | Use Error Analysis |145| Software behavior | Software FMEA |146| Early design phase | PHA |147148### Probability Criteria149150| Level | Name | Description | Frequency |151|-------|------|-------------|-----------|152| P5 | Frequent | Expected to occur | >10⁻³ |153| P4 | Probable | Likely to occur | 10⁻³ to 10⁻⁴ |154| P3 | Occasional | May occur | 10⁻⁴ to 10⁻⁵ |155| P2 | Remote | Unlikely | 10⁻⁵ to 10⁻⁶ |156| P1 | Improbable | Very unlikely | <10⁻⁶ |157158### Severity Criteria159160| Level | Name | Description | Harm |161|-------|------|-------------|------|162| S5 | Catastrophic | Death | Death |163| S4 | Critical | Permanent impairment | Irreversible injury |164| S3 | Serious | Injury requiring intervention | Reversible injury |165| S2 | Minor | Temporary discomfort | No treatment needed |166| S1 | Negligible | Inconvenience | No injury |167168See: [references/risk-analysis-methods.md](references/risk-analysis-methods.md)169170---171172## Risk Evaluation Workflow173174Evaluate risks against acceptability criteria.175176### Workflow: Evaluate Identified Risks1771781. Calculate initial risk level from probability × severity1792. Compare to risk acceptability criteria1803. For each risk, determine:181 - Acceptable: Document and accept182 - ALARP: Proceed to risk control183 - Unacceptable: Mandatory risk control1844. Document evaluation rationale1855. Identify risks requiring benefit-risk analysis1866. Complete benefit-risk analysis if applicable1877. Compile risk evaluation summary1888. **Validation:** All risks evaluated; acceptability determined; rationale documented189190### Risk Evaluation Decision Tree191192```193Risk Estimated194 │195 ▼196Apply Acceptability Criteria197 │198 ├── Low Risk ──────────► Accept and document199 │200 ├── Medium Risk ───────► Consider risk reduction201 │ │ Document ALARP if not reduced202 │ ▼203 │ Practicable to reduce?204 │ │205 │ Yes──► Implement control206 │ No───► Document ALARP rationale207 │208 ├── High Risk ─────────► Risk reduction required209 │ │ Must demonstrate ALARP210 │ ▼211 │ Implement control212 │ Verify residual risk213 │214 └── Unacceptable ──────► Design change mandatory215 Cannot proceed without control216```217218### ALARP Demonstration Requirements219220| Criterion | Evidence Required |221|-----------|-------------------|222| Technical feasibility | Analysis of alternative controls |223| Proportionality | Cost-benefit of further reduction |224| State of the art | Comparison to similar devices |225| Stakeholder input | Clinical/user perspectives |226227### Benefit-Risk Analysis Triggers228229| Situation | Benefit-Risk Required |230|-----------|----------------------|231| Residual risk remains high | Yes |232| No feasible risk reduction | Yes |233| Novel device | Yes |234| Unacceptable risk with clinical benefit | Yes |235| All risks low | No |236237---238239## Risk Control Workflow240241Implement and verify risk control measures.242243### Workflow: Implement Risk Controls2442451. Identify risk control options:246 - Inherent safety by design (Priority 1)247 - Protective measures in device (Priority 2)248 - Information for safety (Priority 3)2492. Select optimal control following hierarchy2503. Analyze control for new hazards introduced2514. Document control in design requirements2525. Implement control in design2536. Develop verification protocol2547. Execute verification and document results2558. Evaluate residual risk with control in place2569. **Validation:** Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards257258### Risk Control Hierarchy259260| Priority | Control Type | Examples | Effectiveness |261|----------|--------------|----------|---------------|262| 1 | Inherent Safety | Eliminate hazard, fail-safe design | Highest |263| 2 | Protective Measures | Guards, alarms, automatic shutdown | High |264| 3 | Information | Warnings, training, IFU | Lower |265266### Risk Control Option Analysis Template267268```269RISK CONTROL OPTION ANALYSIS270271Hazard ID: H-[XXX]272Hazard: [Description]273Initial Risk: P[X] × S[X] = [Level]274275OPTIONS CONSIDERED:276| Option | Control Type | New Hazards | Feasibility | Selected |277|--------|--------------|-------------|-------------|----------|278| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |279| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |280281SELECTED CONTROL: Option [X]282Rationale: [Justification for selection]283284IMPLEMENTATION:285- Requirement: [REQ-XXX]286- Design Document: [Reference]287288VERIFICATION:289- Method: [Test/Analysis/Review]290- Protocol: [Reference]291- Acceptance Criteria: [Criteria]292```293294### Risk Control Verification Methods295296| Method | When to Use | Evidence |297|--------|-------------|----------|298| Test | Quantifiable performance | Test report |299| Inspection | Physical presence | Inspection record |300| Analysis | Design calculation | Analysis report |301| Review | Documentation check | Review record |302303### Residual Risk Evaluation304305| After Control | Action |306|---------------|--------|307| Acceptable | Document, proceed |308| ALARP achieved | Document rationale, proceed |309| Still unacceptable | Additional control or design change |310| New hazard introduced | Analyze and control new hazard |311312---313314## Post-Production Risk Management315316Monitor and update risk management throughout product lifecycle.317318### Workflow: Post-Production Risk Monitoring3193201. Identify information sources:321 - Customer complaints322 - Service reports323 - Vigilance/adverse events324 - Literature monitoring325 - Clinical studies3262. Establish collection procedures3273. Define review triggers:328 - New hazard identified329 - Increased frequency of known hazard330 - Serious incident331 - Regulatory feedback3324. Analyze incoming information for risk relevance3335. Update risk management file as needed3346. Communicate significant findings3357. Conduct periodic risk management review3368. **Validation:** Information sources monitored; file current; reviews completed per schedule337338### Information Sources339340| Source | Information Type | Review Frequency |341|--------|------------------|------------------|342| Complaints | Use issues, failures | Continuous |343| Service | Field failures, repairs | Monthly |344| Vigilance | Serious incidents | Immediate |345| Literature | Similar device issues | Quarterly |346| Regulatory | Authority feedback | As received |347| Clinical | PMCF data | Per plan |348349### Risk Management File Update Triggers350351| Trigger | Response Time | Action |352|---------|---------------|--------|353| Serious incident | Immediate | Full risk review |354| New hazard identified | 30 days | Risk analysis update |355| Trend increase | 60 days | Trend analysis |356| Design change | Before implementation | Impact assessment |357| Standards update | Per transition period | Gap analysis |358359### Periodic Review Requirements360361| Review Element | Frequency |362|----------------|-----------|363| Risk management file completeness | Annual |364| Risk control effectiveness | Annual |365| Post-market information analysis | Quarterly |366| Risk-benefit conclusions | Annual or on new data |367368---369370## Risk Assessment Templates371→ See references/risk-assessment-templates.md for details372373## Decision Frameworks374375### Risk Control Selection376377```378What is the risk level?379 │380 ├── Unacceptable ──► Can hazard be eliminated?381 │ │382 │ Yes─┴─No383 │ │ │384 │ ▼ ▼385 │ Eliminate Can protective386 │ hazard measure reduce?387 │ │388 │ Yes─┴─No389 │ │ │390 │ ▼ ▼391 │ Add Add warning392 │ protection + training393 │394 └── High/Medium ──► Apply hierarchy395 starting at Level 1396```397398### New Hazard Analysis399400| Question | If Yes | If No |401|----------|--------|-------|402| Does control introduce new hazard? | Analyze new hazard | Proceed |403| Is new risk higher than original? | Reject control option | Acceptable trade-off |404| Can new hazard be controlled? | Add control | Reject control option |405406### Risk Acceptability Decision407408| Condition | Decision |409|-----------|----------|410| All risks Low | Acceptable |411| Medium risks with ALARP | Acceptable |412| High risks with ALARP documented | Acceptable if benefits outweigh |413| Any Unacceptable residual | Not acceptable - redesign |414415---416417## Tools and References418419### Scripts420421| Tool | Purpose | Usage |422|------|---------|-------|423| [risk_matrix_calculator.py](scripts/risk_matrix_calculator.py) | Calculate risk levels and FMEA RPN | `python risk_matrix_calculator.py --help` |424425**Risk Matrix Calculator Features:**426- ISO 14971 5x5 risk matrix calculation427- FMEA RPN (Risk Priority Number) calculation428- Interactive mode for guided assessment429- Display risk criteria definitions430- JSON output for integration431432### References433434| Document | Content |435|----------|---------|436| [iso14971-implementation-guide.md](references/iso14971-implementation-guide.md) | Complete ISO 14971:2019 implementation with templates |437| [risk-analysis-methods.md](references/risk-analysis-methods.md) | FMEA, FTA, HAZOP, Use Error Analysis methods |438439### Quick Reference: ISO 14971 Process440441| Stage | Key Activities | Output |442|-------|----------------|--------|443| Planning | Define scope, criteria, responsibilities | Risk Management Plan |444| Analysis | Identify hazards, estimate risk | Hazard Analysis |445| Evaluation | Compare to criteria, ALARP assessment | Risk Evaluation |446| Control | Implement hierarchy, verify | Risk Control Records |447| Residual | Overall assessment, benefit-risk | Risk Management Report |448| Production | Monitor, review, update | Updated RM File |449450---451452## Related Skills453454| Skill | Integration Point |455|-------|-------------------|456| [quality-manager-qms-iso13485](../quality-manager-qms-iso13485/) | QMS integration |457| [capa-officer](../capa-officer/) | Risk-based CAPA |458| [regulatory-affairs-head](../regulatory-affairs-head/) | Regulatory submissions |459| [quality-documentation-manager](../quality-documentation-manager/) | Risk file management |460461## When to Use462463Medical device risk management specialist implementing ISO 14971 throughout product lifecycle. Provides risk analysis, risk evaluation, risk control, and post-production information analysis.464465Covers: Risk Management Planning Workflow, Workflow: Create Risk Management Plan, Risk Management Plan Content, Risk Acceptability Matrix (5x5), Risk Level Actions.