Faa Ams Vv

Knowledge base from the FAA AMS Lifecycle V&V Guidelines (verification and validation), Version 3.0, dated April 2017. Use for applying verification and validation across the FAA Acquisition Management System (AMS) lifecycle: the verify-vs-validate distinction (built right vs. right thing), the work-product/component/product tiers, the nine V&V planning elements, the four method catalogs (Appendix C), decision-point-gated V&V (SASP, CRD, Investment Analysis, Solution Implementation, In-Service Management), the Appendix B document checklists (PRD/APB/ISPD/PMP), and the DT/OT/IOA test triad. Scope limits: this is an FAA acquisition-V&V doctrine, NOT a general SE process model, requirements-engineering manual, or test-design textbook. It borrows its core V&V definitions from CMMI v1.2 (SEI, paraphrased) and presumes the surrounding AMS lifecycle (see the FAA SEM pack); its phase tables are policy snapshots as of April 2017 and it is thin on detailed test methods, tool specifics, and anything outside FAA acquisit

jgsystemsconsulting Updated 70 repo stars

File contents

jgsystemsconsulting/jgs-se-knowledge-packs commit 6d8c0690ad

Frequently asked questions

npx get-skill add jgsystemsconsulting/faa-ams-vv