Faa Ams Vv

Knowledge base from the FAA AMS Lifecycle V&V Guidelines (verification and validation), Version 3.0, dated April 2017. Use for applying verification and validation across the FAA Acquisition Management System (AMS) lifecycle: the verify-vs-validate distinction (built right vs. right thing), the work-product/component/product tiers, the nine V&V planning elements, the four method catalogs (Appendix C), decision-point-gated V&V (SASP, CRD, Investment Analysis, Solution Implementation, In-Service Management), the Appendix B document checklists (PRD/APB/ISPD/PMP), and the DT/OT/IOA test triad. Scope limits: this is an FAA acquisition-V&V doctrine, NOT a general SE process model, requirements-engineering manual, or test-design textbook. It borrows its core V&V definitions from CMMI v1.2 (SEI, paraphrased) and presumes the surrounding AMS lifecycle (see the FAA SEM pack); its phase tables are policy snapshots as of April 2017 and it is thin on detailed test methods, tool specifics, and anything outside FAA acquisit

jgsystemsconsulting 6d8c069 13 files · 143.2 KB Updated

File contents

jgsystemsconsulting/jgs-se-knowledge-packs/tree/main/packs/faa-ams-vv commit 6d8c0690ad

Frequently asked questions

npx skillmds@latest add jgsystemsconsulting/faa-ams-vv