VASP Band Preparation (Subskill)
Scope
This skill prepares band-structure-stage input tasks only.
It should:
- verify prerequisite SCF context is available
- generate line-mode/high-symmetry-path
KPOINTS - prepare stage-appropriate INCAR settings
- report assumptions and unresolved choices
It should not submit or execute jobs.
Prerequisites
Require explicit prior SCF context and a clear crystal/path convention for band calculation.
If prerequisites are missing, stop and ask for them.
Must provide
- source SCF context path
- crystal/path convention (or explicit k-path)
- band intent and output expectations
- key electronic/smearing policy for the band stage
Usually should be explicit
- line-mode path source and tolerance
ISMEARpolicy for band stageLORBITand projection-related options when requested
Expected output
- band-stage task directory/input updates
- generated line-mode
KPOINTSsummary - prerequisite check summary
- settings summary and assumptions
- handoff note to
dpdisp-submitif execution is requested