Create PRD
Trigger
Use when the user asks for requirements, acceptance criteria, user stories, product scope, success metrics, or a feature spec.
When To Use
- After discovery is clear enough to define behaviour.
- Before UX, system mapping, technical design, or engineering planning.
- When scope needs to be testable.
What Makes This Document Useful
A PRD earns its place by being testable and bounded. Two rules carry most of that weight:
- Every requirement must be verifiable. If nobody can tell whether it is met, it is a wish. "The page should be fast" is a wish; "the product list renders within 1.5s at the 75th percentile on a 4G connection" is a requirement.
- Requirements describe outcomes, not implementations. Naming the database table in a PRD forecloses a design decision that has not been made yet. The exception is a genuine product constraint ("must remain usable offline"), which belongs here precisely because it is not the engineer's call.
Inputs Inspected
- Discovery brief and product profile from the same initiative.
- Existing issues, docs, designs, and the user's prompt.
- Current behaviour in the codebase where the feature already partly exists.
Workflow
Inspect discovery context, product profile, existing docs, issues and designs, and current behaviour before defining anything.
State the problem and who has it, then the goals, then non-goals.
Describe the users as roles with distinct needs and permissions, not demographics.
Write user stories in the form As a
<role>, I want<capability>, so that<outcome>. The "so that" clause is the part that catches a feature nobody needs; do not omit it.Convert goals into functional requirements, each individually verifiable and individually numbered so later artifacts can cite them.
Write non-functional requirements with numbers: performance, availability, scale, security, accessibility, compliance, supported browsers or devices.
Write acceptance criteria as Given/When/Then, tied to user-visible behaviour or an operational constraint:
Given a tenant admin with 5,000 audit events When they export a filtered date range Then the file contains only their tenant's events, and download begins within 10 seconds.
Record assumptions (things believed true but unverified) and dependencies (other teams, systems, vendors, or work that must land first). Both change the plan if wrong, which is why they are written down rather than carried in someone's head.
Define success metrics: how you will know afterwards whether this worked, with the current baseline where one exists. "Adoption" is not a metric; "40% of active tenants run at least one export within 30 days" is.
Define release criteria: what must be true to ship. This is distinct from acceptance criteria, which describe correct behaviour.
Split must-have scope from later enhancements, and record explicit out of scope decisions.
Capture open questions whose answers would change scope, acceptance criteria or release risk. These are scraped into the open-questions store automatically, so write them as a list, one question per line.
Validate:
python "${CLAUDE_PLUGIN_ROOT}/scripts/validate-artifact.py" <artifact paths>
Outputs
.project/docs/engineering/<initiative-id>/prd.md
Required Sections
- Problem
- Goals
- Non-Goals
- Users
- User Stories
- Functional Requirements
- Non-Functional Requirements
- Permissions And Data Handling
- Assumptions
- Dependencies
- Success Metrics
- Acceptance Criteria
- Release Criteria
- Edge Cases
- Out Of Scope
- Open Questions
Required Front Matter
initiative_idskillcreated_atstatusconfidencesource_artifacts
Safety Constraints
- Do not over-specify implementation unless it is a genuine product constraint.
- Separate must-have requirements from later enhancements.
- Keep acceptance criteria measurable, and success metrics baselined.
- Never invent usage figures, user counts or conversion rates. If a baseline is unknown, write "unknown" and make finding it an open question.
- Distinguish confirmed requirements from proposed ones.