Gtm Strategy Builder
Advanced operational skill for gtm-strategy-builder.
## Activation trigger
Use this skill when the user requests **gtm strategy builder** and needs a high-confidence, decision-ready outcome in **gtm-growth**.
## Required inputs
- ICP segments and current traction data.
Positioning hypotheses and pricing assumptions.
Channel constraints (budget, team bandwidth, timelines).
Success metrics (CAC, payback, activation, retention).
Optional inputs
- Previous outputs from this skill family.
- Team ownership map and delivery timeline.
- Explicit constraints for cost, risk, or compliance.
Files to inspect
concept/,templates/,examples/,scripts/in this skill folder.- User-referenced repository files and related modules.
- Prior artifacts that constrain or inform this decision.
Execution workflow
- Prioritize segments/channels using evidence-weighted scoring.
Build positioning/messaging assets mapped to ICP pain and value proof.
Design measurable GTM experiments with clear stop/scale rules.
Quantify unit economics assumptions and sensitivity ranges.
Produce execution roadmap and weekly review cadence.
Generated artifacts
outputs/gtm-strategy.md
outputs/experiment-matrix.mdoutputs/metrics-dashboard-spec.mdOutput contract
Final response must include:
- Objective and scope boundaries.
- Inputs and assumptions used.
- Analysis and decision rationale.
- Artifact paths and summary.
- Validation result and residual risks.
- Next actions ordered by priority.
Validation checklist
- Required sections are complete and non-empty.
No placeholder content (
TODO,TBD,lorem,placeholder).Claims are traceable to provided inputs or inspected files.
Output includes explicit decisions, risks, and next steps.
Safety / failure rules
- Pause and ask for clarification if required inputs are missing or contradictory.
Do not invent metrics, user evidence, or repository facts.
Do not modify unrelated files or broaden scope silently.
If high-risk uncertainty remains, return a gated recommendation instead of false precision.
Example commands
$gtm-strategy-builder "Run gtm strategy builder on my current project context" python scripts/run.py --input examples/input-example.md python scripts/validate.py --file examples/output-example.mdAdvanced usage
- Run in phased mode: discovery -> draft -> validation -> final.
- Compare two decision branches and include tradeoff table.
- Enforce stricter gates for production/release-critical use.