Phase Acceptance Gate

Every batch acceptance report must include:

1. Scope Check

  • Intended scope
  • Actual files changed
  • Out-of-scope changes
  • Forbidden changes detected

2. Requirement-to-Evidence Matrix

Each row must include:

  • Requirement
  • Implementation file
  • Test file or command
  • Evidence
  • Status: PASS / GAP / FAIL

3. Quality Gate Evidence

Include exact results for:

  • ruff
  • pytest
  • OpenSpec validation
  • Docker config if relevant
  • secret scan
  • integration tests if relevant
  • evaluation scripts if relevant

4. Skipped Test Audit

Skipped tests must be listed with:

  • test name
  • reason
  • whether skip is acceptable
  • what is needed to remove the skip

5. Risk Assessment

Classify remaining risks as:

  • blocking
  • non-blocking
  • deferred by design

6. Final Decision

End with exactly one:

  • ACCEPTED
  • ACCEPTED_WITH_GAPS
  • REJECTED

Rules:

  • Do not mark a batch ACCEPTED if core integration tests are skipped.
  • Do not mark a requirement complete without test or command evidence.
  • Do not allow implementation agents to silently change requirements.