Sprint Roadmap Skill
Runs at Phase 4.4 of WIZARD.md — last step before coding.
Use after BP v0.0.2, the approved prototype direction, the Product Brief, and the Technical Plan all exist.
Create a 14–20 sprint roadmap. Sequencing and clarity matter more than time accuracy.
Sprint -1 changed job in v0.5.0
Sprint -1 used to build the Prototype Lab. The prototype now happens in Phase 3, before this roadmap is written, so Sprint -1 has a different purpose:
Sprint -1 — Design System. Consolidate the approved prototype and docs/product/DESIGN-DIRECTION.md into real design tokens, components, and layout primitives that Sprint 1 can build on.
Required file: docs/sprints/sprint--1-design-system.md.
Do not generate a sprint--1-prototype-lab.md — that sprint no longer exists.