Sprint Planning Automation
Core Principles
- Transparency Enables Collaboration: Sprint plan is visible to all, with objectives, Story assignments, and capacity matching information transparent
- Risk Early Identification: Identify risks and dependencies during Sprint Planning, rather than discovering issues during execution
- Automated Tracking: Sprint progress and Story status are automatically tracked, reducing manual reporting burden
Interaction Mode
🤖→👤 AI Suggests, Human Approves
- AI automatically completes Step 1-5, generating a complete Sprint plan
- Human review focus: Sprint Goal accuracy, Story selection reasonableness, capacity appropriateness
- Human can request AI adjustments, AI regenerates
- After Product Owner approval, the Sprint officially begins
Input
| Input Item |
Type |
Required |
Source |
Description |
| product_backlog |
object[] |
Yes |
output/pm-monitoring/iteration-backlog-grooming/prioritized_items |
Product backlog |
| sprint_goal |
string |
○ |
User provided |
Sprint goal description |
| team_capacity |
object |
Yes |
output/pm-project/planning-resource/resource_plan |
Team capacity data |
| sprint_duration_days |
number |
Yes |
User provided |
Sprint duration in days |
Execution Steps
Step 1: Sprint Goal Auto-suggestion [Core]
Actions:
- Analyze high-priority Stories in Product Backlog
- Identify themes or feature areas
- Generate 1-2 sentence Sprint Goal
- Ensure Goal is specific, measurable, and valuable
Output:
{
"sprint_goal_suggestion": {
"goal": "string",
"focus_area": "string",
"success_indicator": "string",
"confidence": 0.0-1.0
}
}
Step 2: Story Auto-selection [Core]
Actions:
- Sort Backlog Stories by priority
- Consider dependencies between Stories
- Match Stories with team capabilities
- Greedy algorithm to select optimal combination up to capacity limit
Output:
{
"selected_stories": [{
"id": "STORY-001",
"title": "string",
"priority": "P0 | P1 | P2 | P3",
"dependencies": ["STORY-ID"],
"estimated_points": number,
"recommended_assignee": "string | null",
"selection_reason": "string"
}],
"rejected_stories": [{
"id": "string",
"reason": "string"
}],
"selection_confidence": 0.0-1.0
}
Step 3: Workload Auto-estimation [Core]
Actions:
- Estimate Story Points for each selected Story
- Use Planning Poker or T-Shirt Size as reference
- Consider technical complexity and uncertainty
- Summarize total points
Output:
{
"story_points_estimation": [{
"story_id": "STORY-001",
"title": "string",
"story_points": number,
"estimation_method": "fibonacci | t-shirt | ai-suggested",
"confidence": 0.0-1.0,
"notes": "string"
}],
"total_story_points": number,
"velocity_reference": number,
"estimation_confidence": 0.0-1.0
}
Step 4: Capacity Matching Validation [Core]
Actions:
- Calculate team available capacity (person-days × team size)
- Compare planned points with capacity
- Validate within safe range (recommend 80% utilization)
- If exceeding capacity, suggest adjustments
Output:
{
"capacity_validation": {
"team_capacity": {
"total_available_hours": number,
"story_points_capacity": number,
"recommended_utilization": 0.0-1.0
},
"sprint_plan": {
"planned_story_points": number,
"planned_hours": number,
"utilization_rate": 0.0-1.0
},
"validation_result": "green | yellow | red",
"validation_message": "string",
"adjustment_suggestions": ["string"]
}
}
Step 5: Sprint Plan Document Generation [Core]
Actions:
- Integrate outputs from the above steps
- Generate complete Sprint plan document
- Include risk alerts and recommendations
- Prepare human approval version
Output:
# sprint_plan
## Sprint Information
- Sprint Number:
- Sprint Goal:
- Start Date:
- End Date:
- Team:
## Sprint Goal
{Step 1 Output}
## Planned Stories
{Step 2 & 3 Output}
## Capacity Validation
{Step 4 Output}
## Risks & Recommendations
- Identified risks:
- Recommended focus areas:
## Approval
- Approval Status: Pending
Output Depth Grading
| Depth Level |
Output Scope |
Description |
| quick |
Sprint plan and Story allocation |
Core conclusions + minimum viable deliverable |
| standard |
Full deliverables (current default) |
Complete deliverables including all Step outputs |
| deep |
Full plan + risk buffer design + dependency analysis + capacity optimization suggestions |
Full deliverables + extended analysis + deep simulation |
Output
Storage Path: output/pm-project/agile-sprint-planning/
Output Files: sprint_plan.json, metadata.json
Output Schema:
{
"type": "object",
"required": ["sprint_plan", "metadata"],
"properties": {
"sprint_plan": {"type": "object", "description": "Sprint plan including objectives, Story list, capacity validation, and risks"},
"metadata": {"type": "object", "description": "Metadata including Sprint ID, confidence, and approval status"}
}
}
Output Validation Rules
| Field Path |
Type |
Required |
Description |
| sprint_plan.sprint_goal |
string |
Yes |
Sprint goal description, must be specific and measurable |
| sprint_plan.stories |
array |
Yes |
Planned Story list, each must contain id, title, story_points, assignee |
| sprint_plan.stories[].story_points |
number |
Yes |
Story point estimate, must be positive integer |
| sprint_plan.stories[].status |
string |
Yes |
Story status, enum value planned |
| sprint_plan.capacity_validation.status |
string |
Yes |
Capacity validation result, enum values green/yellow/red |
| sprint_plan.capacity_validation.message |
string |
Yes |
Validation explanation message |
| sprint_plan.risks |
array |
No |
Risk list, each must contain description and priority |
| sprint_plan.risks[].priority |
string |
Yes |
Risk priority, enum values high/medium/low |
| metadata.sprint_id |
string |
Yes |
Sprint unique identifier |
| metadata.generated_at |
string |
Yes |
Generation time, ISO 8601 format |
| metadata.confidence |
number |
Yes |
Overall confidence, range 0.0-1.0 |
| metadata.human_approval_required |
boolean |
Yes |
Whether human approval is required, must be true for Sprint Planning |
| metadata.approval_status |
string |
Yes |
Approval status, enum values pending/approved/rejected |
{
"sprint_plan": {
"sprint_goal": "string",
"stories": [{
"id": "string",
"title": "string",
"story_points": number,
"assignee": "string",
"status": "planned"
}],
"capacity_validation": {
"status": "green | yellow | red",
"message": "string"
},
"risks": [{
"description": "string",
"priority": "high | medium | low"
}]
},
"metadata": {
"sprint_id": "string",
"generated_at": "ISO datetime",
"confidence": 0.0-1.0,
"human_approval_required": true,
"approval_status": "pending | approved | rejected"
}
}
Capacity Calculation Rules
Available Capacity = Team Size × Available Hours Per Person Per Day × Sprint Days × Utilization Factor
Recommended Configuration:
- Utilization Factor: 0.8 (reserve 20% for meetings, ad-hoc tasks)
- Available Hours Per Person Per Day: 6 hours (not 8 hours)
Decision Rules
| Condition |
Action |
| Backlog Stories < Sprint capacity 50% |
Escalate to Product Owner to supplement requirements |
| Capacity validation red (> 100%) |
Mandatory requirement to reduce Stories or extend Sprint |
| Complex dependencies preventing selection |
Output multiple options, escalate to human decision |
| Story estimation confidence < 0.5 |
Mark uncertainty, escalate to team for confirmation |
Quality Checks
P0 Checks (must pass for quick/standard/deep)
P1 Checks (must pass for standard/deep)
P2 Checks (must pass for deep only)
Degradation Strategy
Upstream File Missing Degradation Plan
| Missing Upstream Input |
Degradation Plan |
Output Impact |
| Product Backlog |
User provides requirements list (title + priority + estimate), AI generates Sprint plan accordingly |
Sprint plan generated from user input, lacking structured Backlog data support |
| Sprint goal |
AI infers Sprint Goal from high-priority Stories, marks for PO confirmation |
Sprint Goal is AI-inferred, requires Product Owner confirmation before execution |
| Team capacity |
Skip capacity validation, mark "Requires manual confirmation of capacity matching" in plan |
Sprint plan has no capacity validation result, requires manual supplementation |
| Sprint duration |
If user does not provide Sprint days, prompt user to provide or skip related steps |
Capacity calculation and scheduling lack time range, requires manual supplementation |
Data Acquisition Instructions
When upstream files are missing, obtain necessary data through the following methods:
- Product Backlog missing: Ask user to provide requirements list, including requirement title, priority (P0-P3), and rough estimate; AI will perform Story selection and Sprint plan generation accordingly
- Sprint goal missing: AI will infer Sprint Goal from highest priority Stories, mark in output "AI-inferred, requires Product Owner confirmation"
- Team capacity missing: Skip capacity matching validation step, mark in Sprint plan "Requires manual confirmation of team capacity support", suggest confirming with team before submitting for approval
Upstream Change Response
Upstream Change Impact Table
| Upstream Change |
Impact Scope |
Response Strategy |
| Product Backlog change (priority adjustment/Story additions/removals) |
Story selection results, Sprint Goal suggestion |
Re-execute Story selection, update Sprint plan and Goal suggestion |
| Team capacity change (personnel changes/holiday adjustments) |
Capacity validation results, Story selection upper limit |
Recalculate capacity, adjust Story selection and capacity validation |
| Sprint duration adjustment |
Capacity calculation, scheduling timeline |
Recalculate available capacity, update Sprint plan time range |
Downstream Notification Mechanism Table
| Change Type |
Impact Scope |
Notification Method |
| Sprint plan change (Story additions/removals/Goal adjustment) |
Daily sync, Sprint review, risk management |
Update sprint_plan.json, notify agile-daily-sync, agile-review, risk-management |
| Capacity validation result change |
Resource planning, team scheduling |
Update sprint_plan.json, notify planning-resource |
| Approval status change |
All downstream Pipelines dependent on Sprint plan |
Update metadata.json, notify all downstream consumers |
1---2name: agile-sprint-planning3description: "Use when planning a Sprint. Sprint Planning automation, transforming Product Backlog into Sprint Backlog, including Sprint Goal suggestions, Story auto-selection, workload estimation, and capacity matching validation, outputting a complete Sprint plan. Keywords: Sprint planning, Sprint plan, iteration planning, Story selection, capacity matching, scheduling, what to do this iteration."4metadata:5 source: https://skillmd.com/skills/luckyonetwothree/agile-sprint-planning6 module: "Project Management & Execution"7 sub-module: "Agile Execution"8 type: "pipeline"9 version: "3.1"10 domain_tags: ["Internet", "SaaS", "General"]11 trigger_examples:12 - "How to plan the next Sprint"13 - "Which requirements for this iteration"14 - "How to schedule the Sprint plan"15 interaction_mode: "ai_suggest_human_approve"16execution_depth:17 default: standard18 quick_description: "Output Sprint plan and Story allocation directly"19 deep_description: "Full plan + risk buffer design + dependency analysis + capacity optimization suggestions"20---2122# Sprint Planning Automation2324## Core Principles25261. **Transparency Enables Collaboration**: Sprint plan is visible to all, with objectives, Story assignments, and capacity matching information transparent272. **Risk Early Identification**: Identify risks and dependencies during Sprint Planning, rather than discovering issues during execution283. **Automated Tracking**: Sprint progress and Story status are automatically tracked, reducing manual reporting burden2930## Interaction Mode3132**🤖→👤 AI Suggests, Human Approves**3334- AI automatically completes Step 1-5, generating a complete Sprint plan35- Human review focus: Sprint Goal accuracy, Story selection reasonableness, capacity appropriateness36- Human can request AI adjustments, AI regenerates37- After Product Owner approval, the Sprint officially begins3839---4041## Input4243| Input Item | Type | Required | Source | Description |44|--------|------|------|------|------|45| product_backlog | object[] | Yes | output/pm-monitoring/iteration-backlog-grooming/prioritized_items | Product backlog |46| sprint_goal | string | ○ | User provided | Sprint goal description |47| team_capacity | object | Yes | output/pm-project/planning-resource/resource_plan | Team capacity data |48| sprint_duration_days | number | Yes | User provided | Sprint duration in days |4950---5152## Execution Steps5354### Step 1: Sprint Goal Auto-suggestion [Core]5556**Actions**:57- Analyze high-priority Stories in Product Backlog58- Identify themes or feature areas59- Generate 1-2 sentence Sprint Goal60- Ensure Goal is specific, measurable, and valuable6162**Output**:63```json64{65 "sprint_goal_suggestion": {66 "goal": "string",67 "focus_area": "string",68 "success_indicator": "string",69 "confidence": 0.0-1.070 }71}72```7374### Step 2: Story Auto-selection [Core]7576**Actions**:77- Sort Backlog Stories by priority78- Consider dependencies between Stories79- Match Stories with team capabilities80- Greedy algorithm to select optimal combination up to capacity limit8182**Output**:83```json84{85 "selected_stories": [{86 "id": "STORY-001",87 "title": "string",88 "priority": "P0 | P1 | P2 | P3",89 "dependencies": ["STORY-ID"],90 "estimated_points": number,91 "recommended_assignee": "string | null",92 "selection_reason": "string"93 }],94 "rejected_stories": [{95 "id": "string",96 "reason": "string"97 }],98 "selection_confidence": 0.0-1.099}100```101102### Step 3: Workload Auto-estimation [Core]103104**Actions**:105- Estimate Story Points for each selected Story106- Use Planning Poker or T-Shirt Size as reference107- Consider technical complexity and uncertainty108- Summarize total points109110**Output**:111```json112{113 "story_points_estimation": [{114 "story_id": "STORY-001",115 "title": "string",116 "story_points": number,117 "estimation_method": "fibonacci | t-shirt | ai-suggested",118 "confidence": 0.0-1.0,119 "notes": "string"120 }],121 "total_story_points": number,122 "velocity_reference": number,123 "estimation_confidence": 0.0-1.0124}125```126127### Step 4: Capacity Matching Validation [Core]128129**Actions**:130- Calculate team available capacity (person-days × team size)131- Compare planned points with capacity132- Validate within safe range (recommend 80% utilization)133- If exceeding capacity, suggest adjustments134135**Output**:136```json137{138 "capacity_validation": {139 "team_capacity": {140 "total_available_hours": number,141 "story_points_capacity": number,142 "recommended_utilization": 0.0-1.0143 },144 "sprint_plan": {145 "planned_story_points": number,146 "planned_hours": number,147 "utilization_rate": 0.0-1.0148 },149 "validation_result": "green | yellow | red",150 "validation_message": "string",151 "adjustment_suggestions": ["string"]152 }153}154```155156### Step 5: Sprint Plan Document Generation [Core]157158**Actions**:159- Integrate outputs from the above steps160- Generate complete Sprint plan document161- Include risk alerts and recommendations162- Prepare human approval version163164**Output**:165```yaml166# sprint_plan167168## Sprint Information169- Sprint Number:170- Sprint Goal:171- Start Date:172- End Date:173- Team:174175## Sprint Goal176{Step 1 Output}177178## Planned Stories179{Step 2 & 3 Output}180181## Capacity Validation182{Step 4 Output}183184## Risks & Recommendations185- Identified risks:186- Recommended focus areas:187188## Approval189- Approval Status: Pending190```191192---193194### Output Depth Grading195196| Depth Level | Output Scope | Description |197|----------|----------|------|198| quick | Sprint plan and Story allocation | Core conclusions + minimum viable deliverable |199| standard | Full deliverables (current default) | Complete deliverables including all Step outputs |200| deep | Full plan + risk buffer design + dependency analysis + capacity optimization suggestions | Full deliverables + extended analysis + deep simulation |201202## Output203204**Storage Path**: `output/pm-project/agile-sprint-planning/`205206**Output Files**: sprint_plan.json, metadata.json207208**Output Schema**:209210```json211{212 "type": "object",213 "required": ["sprint_plan", "metadata"],214 "properties": {215 "sprint_plan": {"type": "object", "description": "Sprint plan including objectives, Story list, capacity validation, and risks"},216 "metadata": {"type": "object", "description": "Metadata including Sprint ID, confidence, and approval status"}217 }218}219```220221### Output Validation Rules222223| Field Path | Type | Required | Description |224|----------|------|------|------|225| sprint_plan.sprint_goal | string | Yes | Sprint goal description, must be specific and measurable |226| sprint_plan.stories | array | Yes | Planned Story list, each must contain id, title, story_points, assignee |227| sprint_plan.stories[].story_points | number | Yes | Story point estimate, must be positive integer |228| sprint_plan.stories[].status | string | Yes | Story status, enum value planned |229| sprint_plan.capacity_validation.status | string | Yes | Capacity validation result, enum values green/yellow/red |230| sprint_plan.capacity_validation.message | string | Yes | Validation explanation message |231| sprint_plan.risks | array | No | Risk list, each must contain description and priority |232| sprint_plan.risks[].priority | string | Yes | Risk priority, enum values high/medium/low |233| metadata.sprint_id | string | Yes | Sprint unique identifier |234| metadata.generated_at | string | Yes | Generation time, ISO 8601 format |235| metadata.confidence | number | Yes | Overall confidence, range 0.0-1.0 |236| metadata.human_approval_required | boolean | Yes | Whether human approval is required, must be true for Sprint Planning |237| metadata.approval_status | string | Yes | Approval status, enum values pending/approved/rejected |238239```json240{241 "sprint_plan": {242 "sprint_goal": "string",243 "stories": [{244 "id": "string",245 "title": "string",246 "story_points": number,247 "assignee": "string",248 "status": "planned"249 }],250 "capacity_validation": {251 "status": "green | yellow | red",252 "message": "string"253 },254 "risks": [{255 "description": "string",256 "priority": "high | medium | low"257 }]258 },259 "metadata": {260 "sprint_id": "string",261 "generated_at": "ISO datetime",262 "confidence": 0.0-1.0,263 "human_approval_required": true,264 "approval_status": "pending | approved | rejected"265 }266}267```268269---270271## Capacity Calculation Rules272273```274Available Capacity = Team Size × Available Hours Per Person Per Day × Sprint Days × Utilization Factor275276Recommended Configuration:277- Utilization Factor: 0.8 (reserve 20% for meetings, ad-hoc tasks)278- Available Hours Per Person Per Day: 6 hours (not 8 hours)279```280281---282283## Decision Rules284285| Condition | Action |286|------|------|287| Backlog Stories < Sprint capacity 50% | Escalate to Product Owner to supplement requirements |288| Capacity validation red (> 100%) | Mandatory requirement to reduce Stories or extend Sprint |289| Complex dependencies preventing selection | Output multiple options, escalate to human decision |290| Story estimation confidence < 0.5 | Mark uncertainty, escalate to team for confirmation |291292## Quality Checks293294### P0 Checks (must pass for quick/standard/deep)295296- [ ] Sprint Goal is clear and contains ≥1 quantifiable acceptance criteria297- [ ] Selected Stories total points ≤ team available capacity × 1.1 (10% buffer reserved)298299### P1 Checks (must pass for standard/deep)300301- [ ] 100% of cross-team dependencies identified with resolution plan or timeline302- [ ] Each Story estimate confirmed by ≥2 team members303- [ ] Sprint includes ≥1 tech debt or improvement item (if backlog exists)304- [ ] No P0 risks excluded from Sprint consideration305306### P2 Checks (must pass for deep only)307308- [ ] Extended analysis complete (deep simulation and roadmap generated)309- [ ] Decision records complete (key decisions have rationale and alternatives)310311## Degradation Strategy312313### Upstream File Missing Degradation Plan314315| Missing Upstream Input | Degradation Plan | Output Impact |316|---------------|---------|---------|317| Product Backlog | User provides requirements list (title + priority + estimate), AI generates Sprint plan accordingly | Sprint plan generated from user input, lacking structured Backlog data support |318| Sprint goal | AI infers Sprint Goal from high-priority Stories, marks for PO confirmation | Sprint Goal is AI-inferred, requires Product Owner confirmation before execution |319| Team capacity | Skip capacity validation, mark "Requires manual confirmation of capacity matching" in plan | Sprint plan has no capacity validation result, requires manual supplementation |320| Sprint duration | If user does not provide Sprint days, prompt user to provide or skip related steps | Capacity calculation and scheduling lack time range, requires manual supplementation |321322### Data Acquisition Instructions323324When upstream files are missing, obtain necessary data through the following methods:3253261. **Product Backlog missing**: Ask user to provide requirements list, including requirement title, priority (P0-P3), and rough estimate; AI will perform Story selection and Sprint plan generation accordingly3272. **Sprint goal missing**: AI will infer Sprint Goal from highest priority Stories, mark in output "AI-inferred, requires Product Owner confirmation"3283. **Team capacity missing**: Skip capacity matching validation step, mark in Sprint plan "Requires manual confirmation of team capacity support", suggest confirming with team before submitting for approval329330## Upstream Change Response331332### Upstream Change Impact Table333334| Upstream Change | Impact Scope | Response Strategy |335|----------|----------|----------|336| Product Backlog change (priority adjustment/Story additions/removals) | Story selection results, Sprint Goal suggestion | Re-execute Story selection, update Sprint plan and Goal suggestion |337| Team capacity change (personnel changes/holiday adjustments) | Capacity validation results, Story selection upper limit | Recalculate capacity, adjust Story selection and capacity validation |338| Sprint duration adjustment | Capacity calculation, scheduling timeline | Recalculate available capacity, update Sprint plan time range |339340### Downstream Notification Mechanism Table341342| Change Type | Impact Scope | Notification Method |343|----------|----------|----------|344| Sprint plan change (Story additions/removals/Goal adjustment) | Daily sync, Sprint review, risk management | Update sprint_plan.json, notify agile-daily-sync, agile-review, risk-management |345| Capacity validation result change | Resource planning, team scheduling | Update sprint_plan.json, notify planning-resource |346| Approval status change | All downstream Pipelines dependent on Sprint plan | Update metadata.json, notify all downstream consumers |