Experiment Design Orchestrator
Core Principles
Experiments are the fastest way to learn
Every experiment is a controlled exploration. The goal is not to prove hypotheses correct, but to gain reliable learning as quickly as possible. The value of experiments lies in learning speed, not experiment count.
Orchestration Philosophy
- Design -> Execution: both stages are essential: Execution without design is blind; the execution stage includes result analysis and report generation
- Human review is a necessary gate for experiments: Both experiment plans and experiment reports must be reviewed by humans; the execution process can be automated
- Guardrail metrics have veto power: No matter how positive the primary metric, guardrail metric breaches trigger immediate pause
Orchestration Protocol
The orchestration protocol follows the unified standard in orchestrator-protocol.md.
Pipeline
pipeline: experiment-orchestrator
version: 8.0
post_pipeline:
- action: stage-summary
output: output/phase-reports/pm-metrics-ops/experiment-orchestrator.md
stages:
- id: phase-1
name: "Experiment Design"
depends_on: []
skills: [experiment-design]
gate:
condition: "Experiment design reviewed and confirmed by human"
fail_action: "Block experiment launch, modify and re-review"
- id: phase-2
name: "Experiment Execution"
depends_on: [phase-1]
skills: [experiment-execution]
gate:
condition: "Sample size sufficient and statistical testing complete, experiment report reviewed and confirmed by human"
fail_action: "Extend experiment period or expand traffic"
Stage Execution Plan
Invoke experiment-design
Invoke: ${experiment-design}
Input:
hypothesis: provided by user (hypothesis statement)
available_traffic: provided by user (available traffic)
metrics_system: metrics-system -> metrics.json (optional)
historical_data: analysis-funnel/analysis-retention (optional)
Output: output/pm-metrics-ops/experiment-design/
Validation: Hypothesis structured (If-Then-Because-For); primary metric directly corresponds to hypothesis; guardrail metrics cover retention, revenue, and technical dimensions; sample size calculation parameters well-founded
Mode: AI->Human
Invoke experiment-execution
Invoke: ${experiment-execution}
Input:
experiment_design: output/pm-metrics-ops/experiment-design/experiment_design.json
experiment_data: provided by user
termination_conditions: output/pm-metrics-ops/experiment-design/experiment_design.json
product_background: provided by user (optional)
Output: output/pm-metrics-ops/experiment-execution/
Validation: Experiment group traffic allocation correct; guardrail metrics not triggered; experiment data collection complete; statistical significance calculated correctly; statistical conclusions consistent with data; action recommendations consistent with conclusions; guardrail metrics fully covered; heterogeneity effects analyzed (at least 3 segment dimensions)
Mode: AI->Human
Stage Summary (post_pipeline)
Follows the stage summary protocol in orchestrator-protocol.md.
| Parameter | Value |
|---|---|
| Sub-Skill output path | output/pm-metrics-ops/ |
| Summary output path | output/phase-reports/pm-metrics-ops/experiment-orchestrator.md |
Downstream connections: primary: decision-orchestrator (experiment complete, convert experiment conclusions into decision actions) alternatives: - target: release-orchestrator reason: Experiment results significant, recommend full rollout condition: Experiment results statistically significant (p < 0.05) and business impact meets threshold - target: analysis-orchestrator reason: Experiment results need deeper data analysis condition: Experiment results have anomalies or need multi-dimensional drill-down special_cases: []
Stage Gates
| Gate | Condition | Failure Handling |
|---|---|---|
| Experiment plan reviewed by human | Experiment design reviewed and confirmed by human | Block experiment launch, modify and re-review |
| Statistical significance determined | experiment-result output file generated and non-empty | Extend experiment period or expand traffic |
| Experiment report reviewed | Experiment report reviewed and confirmed by human | Supplement analysis or modify conclusions |
| Stage summary generated | output/phase-reports/pm-metrics-ops/experiment-orchestrator.md generated and all 6 structural items non-empty | Supplement missing structural items and regenerate |
Human Decision Points
| Decision Point | Trigger Condition | Decision Content |
|---|---|---|
| Experiment plan review | Experiment design complete | Review hypothesis reasonableness, metric selection, traffic allocation plan |
| Full rollout / termination decision | Experiment result analysis complete | Decide on full rollout, terminate experiment, or extend period |
| Experiment report confirmation | Experiment report generation complete | Confirm report conclusions and action recommendations |
Decision Rules
| Condition | Action |
|---|---|
| Sample size reaches 100% | Immediately trigger result analysis |
| Statistically significant (p < 0.05) and stable | Consider early termination |
| Guardrail metric significantly declined | Trigger alert, consider termination |
| Novelty effect significant | Extend experiment period |
| Experiment group consistently negative | Consider early termination |
Exception Handling
| Exception Type | Handling Strategy |
|---|---|
| Experiment design human review not passed | Block experiment launch, return to design stage for modification, do not enter execution stage |
| Guardrail metric exceeds threshold | Immediately pause experiment execution, trigger alert, submit to human decision on whether to terminate experiment |
| Experiment data collection anomaly | Mark data anomaly, pause statistical testing, prompt human to check data pipeline |
| Experiment report human review not passed | Return to execution stage for supplementary analysis, do not pass downstream |
| Multiple experiment traffic conflicts | Queue by priority, lower-priority experiments paused, mark "traffic conflict" |
| Stage summary generation failed | Generate partial summary based on completed sub-Skill outputs, mark missing items as "data missing", do not block orchestration completion |
Standalone Usage Input Acquisition Strategy
Standalone Trigger Scenario Identification
When this orchestrator is invoked directly (not through a parent orchestrator), it is considered a standalone trigger scenario. Typical trigger methods:
- User directly requests capabilities within this orchestrator's domain
- Triggered as an independent skill by external systems
- Parent orchestrator not executed, but user only needs this orchestrator's capability
Required Input Acquisition Strategy
| Required Input | Priority: Read from output/ | Fallback: Get from user conversation | Last Resort: AI knowledge base inference |
|---|---|---|---|
| PRD (prd.md) | Read output/pm-design/design-prd/prd.md | Ask user for PRD document or verbal requirements | Infer requirements from user description (low confidence, mark "PRD is AI-inferred") |
| project_dir | — | Ask user for project directory path | Cannot infer, user must provide |
Upstream Orchestrator Auto-Backtracking
When critical required inputs are missing, suggest user execute upstream orchestrators in the following priority:
| Missing Input | Suggested Upstream Orchestrator | Description |
|---|---|---|
| PRD | pm-design related orchestrator | PRD is the business basis for experiment-orchestrator, missing will result in execution without business foundation |
| Sub-skill outputs | Sub-skill execution | Sub-skills (experiment-design, experiment-execution...) produce domain-specific outputs |
Backtracking suggestion output format:
Critical input missing detected, suggest executing upstream orchestrator first:
1. [Priority] pm-design related orchestrator -> Produces PRD
Continue with AI-inferred values? (Inferred values confidence <=0.3, outputs require additional human review)
Standalone Usage Gate
When triggered standalone, must pass the following additional checks before executing Pipeline:
| Gate Item | Check Content | Failure Handling |
|---|---|---|
| PRD existence | prd.md or equivalent requirements document available | Block execution, suggest user provide PRD |
| project_dir validity | User provided valid project directory path | Block execution, user must provide valid project_dir |
| Input confidence assessment | All required input acquisition methods determined, overall confidence >=0.5 | When confidence <0.5, force human confirmation whether to continue execution |
Gate execution order: PRD existence -> project_dir validity -> Input confidence assessment