Kickoff Meeting Automation
Core Principles
- Transparency is Collaboration: Meeting agenda, background materials, action items are visible to all, ensuring information synchronization
- Risk Early Warning: Pre-identify potential problems and risks before the meeting, ensuring efficient discussion of key topics
- Automated Tracking: Action item extraction, follow-up reminders, completion status automatically tracked
Interaction Mode
🤖 AI-Assisted (Kickoff requires human facilitation)
- Pre-meeting: AI automatically completes all preparation work (Step 1-3)
- In-meeting: Human facilitates the meeting, AI provides real-time assistance (e.g., real-time Q&A suggestions)
- Post-meeting: AI automatically completes minutes and follow-up (Step 4-6)
Input
| Input Item |
Type |
Required |
Source |
Description |
| project_charter |
object |
Yes |
output/pm-project/planning-project-charter/project_charter |
Project charter |
| resource_plan |
object |
Yes |
output/pm-project/planning-resource/resource_plan |
Resource plan |
| meeting_attendees |
string[] |
Yes |
User provided |
Meeting attendee list |
| preferred_meeting_time |
string |
No |
User provided |
Preferred meeting time |
Execution Steps
Pre-meeting AI: Preparation Phase
Step 1: Agenda Auto-Generation
Actions:
- Generate meeting agenda based on project charter and resource plan
- Assign duration for each agenda item
- Mark the responsible person for each item
- Ensure key information is not missed
Output:
{
"agenda": {
"meeting_title": "string",
"duration_minutes": number,
"items": [{
"order": 1,
"topic": "string",
"duration_minutes": number,
"presenter": "string",
"key_points": ["string"],
"decision_needed": boolean
}],
"buffer_minutes": number
}
}
Step 2: Background Materials Auto-Compilation
Actions:
- Summarize core content of project charter into 1-page summary
- Organize resource plan highlights
- Collect related document links
- Generate visual project overview
Output:
{
"background_materials": {
"executive_summary": "string (< 500 words)",
"project_overview": {
"objectives": ["string"],
"scope": ["string"],
"timeline": "string",
"team": ["string"]
},
"key_risks": ["string"],
"success_criteria": ["string"],
"document_links": [{
"title": "string",
"url": "string",
"description": "string"
}]
}
}
Step 3: Question List Pre-Preparation
Actions:
- Identify common questions based on project background
- Predict questions stakeholders may care about
- Pre-prepare answer key points
- Mark questions requiring specific people to answer
Output:
{
"prepared_questions": [{
"question": "string",
"likely_from": "string",
"prepared_answer": "string",
"answer_owner": "string",
"priority": "high | medium | low"
}]
}
In-meeting Human: Meeting Facilitation
Human Facilitation Key Points:
- Advance meeting according to agenda
- Ensure every key decision has a conclusion
- Record new questions raised during the meeting
- Control time, avoid overtime
Post-meeting AI: Follow-up Phase
Step 4: Meeting Minutes Auto-Generation
Actions:
- Receive meeting records (or transcript from recording)
- Extract key discussion points and conclusions
- Organize unresolved issues
- Generate formatted meeting minutes
Output:
{
"minutes": {
"meeting_info": {
"title": "string",
"date": "ISO date",
"attendees": ["string"],
"absentees": ["string"]
},
"key_decisions": [{
"decision": "string",
"decision_maker": "string",
"date": "ISO date"
}],
"discussion_summary": "string",
"unresolved_issues": ["string"],
"next_steps": ["string"]
}
}
Step 5: Action Items Auto-Extraction
Actions:
- Identify action items from meeting minutes
- Extract for each action item: owner, content, due date
- Assign action item IDs
- Establish action item tracking
Output:
{
"action_items": [{
"id": "AI-001",
"description": "string",
"owner": "string",
"due_date": "ISO date",
"status": "open | in_progress | completed",
"priority": "high | medium | low",
"related_decision": "string | null"
}]
}
Step 6: Follow-up Reminder Setup
Actions:
- Set reminders based on action item due dates
- Set reminders for key milestones
- Configure reminder recipients
- Generate follow-up plan summary
Output:
{
"follow_up_reminders": [{
"id": "REM-001",
"type": "action_item | milestone | check_in",
"title": "string",
"due_date": "ISO date",
"notify": ["string"],
"reminder_timing": "1 day before | 3 days before | 1 week before",
"auto_follow_up": boolean
}],
"follow_up_schedule": {
"next_check_in": "ISO date",
"next_status_review": "ISO date",
"project_phase_end": "ISO date"
}
}
Output Depth Classification
| Depth Level |
Output Scope |
Description |
| quick |
Project kickoff plan and goals |
Core conclusions + minimum viable output |
| standard |
Complete output (current default) |
Complete output, including all Step outputs |
| deep |
Complete kickoff + team alignment plan + risk contingency plan + communication mechanism design |
Complete output + extended analysis + deep inference |
Output
Storage Path: output/pm-project/planning-kickoff/
Output Files: kickoff.json, metadata.json
Output Schema:
{
"type": "object",
"required": ["kickoff", "metadata"],
"properties": {
"kickoff": {"type": "object", "description": "Kickoff meeting data, including agenda, background materials, prepared questions and meeting minutes"},
"metadata": {"type": "object", "description": "Metadata, including meeting arrangement and preparation status"}
}
}
Output Validation Rules
| Field Path |
Type |
Required |
Description |
| kickoff.agenda.meeting_title |
string |
Yes |
Meeting title, must include project name |
| kickoff.agenda.duration_minutes |
number |
Yes |
Meeting duration (minutes), must be > 0 |
| kickoff.agenda.items |
array |
Yes |
Agenda item list, each must contain order, topic, duration_minutes |
| kickoff.agenda.items[].decision_needed |
boolean |
Yes |
Whether a decision is needed |
| kickoff.background_materials.executive_summary |
string |
Yes |
Project summary, must be < 500 words |
| kickoff.background_materials.project_overview.objectives |
array |
Yes |
Project objectives list, at least 1 item |
| kickoff.background_materials.key_risks |
array |
No |
Key risks list |
| kickoff.background_materials.success_criteria |
array |
Yes |
Success criteria list, at least 1 item |
| kickoff.prepared_questions[].priority |
string |
Yes |
Question priority, enum value high/medium/low |
| kickoff.minutes.meeting_info.date |
string |
Yes |
Meeting date, ISO 8601 format |
| kickoff.minutes.key_decisions |
array |
Yes |
Key decisions list, each must contain decision, decision_maker, date |
| kickoff.action_items[].owner |
string |
Yes |
Action item owner |
| kickoff.action_items[].due_date |
string |
Yes |
Action item due date, ISO 8601 format |
| kickoff.action_items[].status |
string |
Yes |
Action item status, enum value open/in_progress/completed |
| kickoff.follow_up_reminders[].type |
string |
Yes |
Reminder type, enum value action_item/milestone/check_in |
| metadata.meeting_scheduled |
boolean |
Yes |
Whether the meeting is scheduled |
| metadata.preparation_completed_at |
string |
Yes |
Preparation completion time, ISO 8601 format |
{
"kickoff": {
"agenda": {
"meeting_title": "Online Classroom Interactive Feature Project Kickoff Meeting",
"duration_minutes": 90,
"items": [
{
"order": 1,
"topic": "Project Background & Objectives",
"duration_minutes": 15,
"presenter": "Zhang Ming (Product Owner)",
"key_points": ["Increase classroom interaction rate to 60%", "Support real-time Q&A and voting features"],
"decision_needed": false
}
],
"buffer_minutes": 10
},
"background_materials": {
"executive_summary": "This project aims to add real-time classroom interactive features to the online education platform, including student hand-raising for questions, real-time voting, and bullet screen interaction, to improve student engagement and course completion rate.",
"project_overview": {
"objectives": ["Classroom interaction rate increased to 60%", "Course completion rate increased by 15%"],
"scope": ["Real-time Q&A module", "Classroom voting module", "Bullet screen interaction module"],
"timeline": "2024-Q2 (10 weeks)",
"team": ["Zhang Ming (PM)", "Li Wei (Frontend Lead)", "Wang Fang (Backend Lead)", "Chen Gang (QA Lead)"]
},
"key_risks": ["WebSocket concurrent performance risk", "Integration complexity with existing player"],
"success_criteria": ["Classroom interaction rate ≥ 60% after interactive feature launch", "P0 defect count = 0"],
"document_links": [
{
"title": "Classroom Interaction PRD",
"url": "https://wiki.example.com/class-interaction-prd",
"description": "Classroom interactive feature product requirements document"
}
]
},
"prepared_questions": [
{
"question": "Does the interactive feature need to support replay scenarios?",
"likely_from": "Li Wei (Frontend Lead)",
"prepared_answer": "Phase 1 only supports live scenarios, replay scenarios included in Phase 2 planning",
"answer_owner": "Zhang Ming",
"priority": "high"
}
],
"minutes": {
"meeting_info": {
"title": "Online Classroom Interactive Feature Project Kickoff Meeting",
"date": "2024-04-01",
"attendees": ["Zhang Ming", "Li Wei", "Wang Fang", "Chen Gang"],
"absentees": []
},
"key_decisions": [
{
"decision": "Phase 1 only supports live scenario interaction, replay interaction included in Phase 2",
"decision_maker": "Zhang Ming",
"date": "2024-04-01"
}
],
"discussion_summary": "Team reached consensus on classroom interactive feature objectives, confirmed Phase 1 focuses on live scenarios, technical solution adopts WebSocket+Redis architecture",
"unresolved_issues": ["Bullet screen message review mechanism to be confirmed"],
"next_steps": ["Li Wei completes technical solution design", "Wang Fang completes API definition", "Chen Gang prepares test environment"]
},
"action_items": [
{
"id": "AI-001",
"description": "Complete classroom interactive technical solution design document",
"owner": "Li Wei",
"due_date": "2024-04-08",
"status": "open",
"priority": "high",
"related_decision": null
}
],
"follow_up_reminders": [
{
"id": "REM-001",
"type": "action_item",
"title": "Technical solution design document deadline reminder",
"due_date": "2024-04-08",
"notify": ["Li Wei", "Zhang Ming"],
"reminder_timing": "1 day before",
"auto_follow_up": true
}
]
},
"metadata": {
"meeting_scheduled": true,
"meeting_date": "2024-04-01",
"attendees_confirmed": ["Zhang Ming", "Li Wei", "Wang Fang", "Chen Gang"],
"preparation_completed_at": "2024-03-31T18:00:00+08:00",
"follow_up_enabled": true
}
}
Meeting Duration Recommendations
| Project Scale |
Recommended Duration |
| Small project (< 5 people, < 4 weeks) |
30-45 minutes |
| Medium project (5-15 people, 1-3 months) |
60-90 minutes |
| Large project (> 15 people, > 3 months) |
90-120 minutes |
Decision Rules
| Condition |
Action |
| Key stakeholder cannot attend |
Escalate to human to coordinate time |
| Major scope change arises during meeting |
Trigger charter update process (Pipeline 1) |
| Action item cannot be assigned an owner |
Escalate to project manager for decision |
| Meeting cannot be held as scheduled |
Reschedule, send notification |
Quality Checks
P0 Checks (must pass for quick/standard/deep)
P1 Checks (must pass for standard/deep)
P2 Checks (must pass for deep only)
Degradation Strategy
Upstream File Missing Degradation Plan
| Missing Upstream Input |
Degradation Plan |
Output Impact |
| Project charter |
User describes project objectives and scope, AI generates Kickoff agenda based on description |
Kickoff agenda generated based on user description, lacking structured charter data support |
| Resource plan |
Skip resource allocation discussion segment, annotate "resource plan to be confirmed" in agenda |
Kickoff materials contain unconfirmed resource items, need post-meeting supplementation |
| Meeting attendees |
User provides attendee list, AI adjusts agenda and question preparation accordingly |
Based on user-provided attendee configuration, agenda and question pre-preparation may be incomplete |
| Preferred meeting time |
If user does not provide preferred meeting time, prompt user to provide or skip steps related to this input |
Meeting arrangement lacks time information, needs manual supplementation |
Data Acquisition Instructions
When upstream files are missing, obtain necessary data through the following methods:
- Project charter missing: Ask user to describe project objectives, scope and key milestones, AI will generate Kickoff agenda and background material summary based on description
- Resource plan missing: Skip resource allocation discussion segment in Kickoff agenda, annotate "resource plan to be confirmed", suggest adding resource discussion topic in the meeting
- Meeting attendees missing: Ask user to provide attendee names and roles, AI will adjust agenda time allocation and question pre-preparation accordingly
Upstream Change Response
Upstream Change Impact Table
| Upstream Change |
Impact Scope |
Response Strategy |
| Project charter change (objectives/scope/success criteria adjustment) |
Agenda content, background materials, question pre-preparation |
Regenerate agenda and background materials, update question list |
| Resource plan change (personnel/budget adjustment) |
Resource allocation discussion segment, team information |
Update resource highlights in background materials, adjust related agenda segments |
| Attendee change (additions/removals/role changes) |
Agenda time allocation, question pre-preparation, reminder configuration |
Readjust agenda and question preparation, update reminder recipients |
Downstream Notification Mechanism Table
| Change Type |
Impact Scope |
Notification Method |
| Meeting agenda change |
All attendees, meeting arrangement |
Update kickoff.json, send agenda change notification |
| Action item change (addition/modification/completion) |
Action item owner, project manager |
Update kickoff.json, notify relevant responsible persons and project manager |
| Key decision change |
Project charter, subsequent planning Pipeline |
Update kickoff.json, notify planning-project-charter |
1---2name: planning-kickoff3description: "Use when preparing and executing project Kickoff meetings. Kickoff meeting automation, including pre-meeting AI preparation (agenda generation, background material compilation, question list pre-preparation), in-meeting human facilitation, post-meeting AI processing (minutes generation, action item extraction, follow-up reminder setup). Keywords: Kickoff, project launch, launch meeting, action items, project kickoff meeting, startup meeting, project initiation."4metadata:5 source: https://skillmd.com/skills/luckyonetwothree/planning-kickoff6 module: "Project Management & Execution"7 sub-module: "Project Planning"8 type: "pipeline"9 version: "3.1"10 domain_tags: ["Internet", "SaaS", "General"]11 trigger_examples:12 - "Project is starting, how to hold the meeting"13 - "How to prepare for kickoff meeting"14 - "How to run a project kickoff meeting"15 interaction_mode: "human_ai_collaborate"16execution_depth:17 default: standard18 quick_description: "Directly output project kickoff plan and goals"19 deep_description: "Complete kickoff + team alignment plan + risk contingency plan + communication mechanism design"20---2122# Kickoff Meeting Automation2324## Core Principles25261. **Transparency is Collaboration**: Meeting agenda, background materials, action items are visible to all, ensuring information synchronization272. **Risk Early Warning**: Pre-identify potential problems and risks before the meeting, ensuring efficient discussion of key topics283. **Automated Tracking**: Action item extraction, follow-up reminders, completion status automatically tracked2930## Interaction Mode3132**🤖 AI-Assisted (Kickoff requires human facilitation)**3334- **Pre-meeting**: AI automatically completes all preparation work (Step 1-3)35- **In-meeting**: Human facilitates the meeting, AI provides real-time assistance (e.g., real-time Q&A suggestions)36- **Post-meeting**: AI automatically completes minutes and follow-up (Step 4-6)3738---3940## Input4142| Input Item | Type | Required | Source | Description |43|--------|------|------|------|------|44| project_charter | object | Yes | output/pm-project/planning-project-charter/project_charter | Project charter |45| resource_plan | object | Yes | output/pm-project/planning-resource/resource_plan | Resource plan |46| meeting_attendees | string[] | Yes | User provided | Meeting attendee list |47| preferred_meeting_time | string | No | User provided | Preferred meeting time |4849---5051## Execution Steps5253### Pre-meeting AI: Preparation Phase5455#### Step 1: Agenda Auto-Generation5657**Actions**:58- Generate meeting agenda based on project charter and resource plan59- Assign duration for each agenda item60- Mark the responsible person for each item61- Ensure key information is not missed6263**Output**:64```json65{66 "agenda": {67 "meeting_title": "string",68 "duration_minutes": number,69 "items": [{70 "order": 1,71 "topic": "string",72 "duration_minutes": number,73 "presenter": "string",74 "key_points": ["string"],75 "decision_needed": boolean76 }],77 "buffer_minutes": number78 }79}80```8182#### Step 2: Background Materials Auto-Compilation8384**Actions**:85- Summarize core content of project charter into 1-page summary86- Organize resource plan highlights87- Collect related document links88- Generate visual project overview8990**Output**:91```json92{93 "background_materials": {94 "executive_summary": "string (< 500 words)",95 "project_overview": {96 "objectives": ["string"],97 "scope": ["string"],98 "timeline": "string",99 "team": ["string"]100 },101 "key_risks": ["string"],102 "success_criteria": ["string"],103 "document_links": [{104 "title": "string",105 "url": "string",106 "description": "string"107 }]108 }109}110```111112#### Step 3: Question List Pre-Preparation113114**Actions**:115- Identify common questions based on project background116- Predict questions stakeholders may care about117- Pre-prepare answer key points118- Mark questions requiring specific people to answer119120**Output**:121```json122{123 "prepared_questions": [{124 "question": "string",125 "likely_from": "string",126 "prepared_answer": "string",127 "answer_owner": "string",128 "priority": "high | medium | low"129 }]130}131```132133### In-meeting Human: Meeting Facilitation134135**Human Facilitation Key Points**:136- Advance meeting according to agenda137- Ensure every key decision has a conclusion138- Record new questions raised during the meeting139- Control time, avoid overtime140141### Post-meeting AI: Follow-up Phase142143#### Step 4: Meeting Minutes Auto-Generation144145**Actions**:146- Receive meeting records (or transcript from recording)147- Extract key discussion points and conclusions148- Organize unresolved issues149- Generate formatted meeting minutes150151**Output**:152```json153{154 "minutes": {155 "meeting_info": {156 "title": "string",157 "date": "ISO date",158 "attendees": ["string"],159 "absentees": ["string"]160 },161 "key_decisions": [{162 "decision": "string",163 "decision_maker": "string",164 "date": "ISO date"165 }],166 "discussion_summary": "string",167 "unresolved_issues": ["string"],168 "next_steps": ["string"]169 }170}171```172173#### Step 5: Action Items Auto-Extraction174175**Actions**:176- Identify action items from meeting minutes177- Extract for each action item: owner, content, due date178- Assign action item IDs179- Establish action item tracking180181**Output**:182```json183{184 "action_items": [{185 "id": "AI-001",186 "description": "string",187 "owner": "string",188 "due_date": "ISO date",189 "status": "open | in_progress | completed",190 "priority": "high | medium | low",191 "related_decision": "string | null"192 }]193}194```195196#### Step 6: Follow-up Reminder Setup197198**Actions**:199- Set reminders based on action item due dates200- Set reminders for key milestones201- Configure reminder recipients202- Generate follow-up plan summary203204**Output**:205```json206{207 "follow_up_reminders": [{208 "id": "REM-001",209 "type": "action_item | milestone | check_in",210 "title": "string",211 "due_date": "ISO date",212 "notify": ["string"],213 "reminder_timing": "1 day before | 3 days before | 1 week before",214 "auto_follow_up": boolean215 }],216 "follow_up_schedule": {217 "next_check_in": "ISO date",218 "next_status_review": "ISO date",219 "project_phase_end": "ISO date"220 }221}222```223224---225226### Output Depth Classification227228| Depth Level | Output Scope | Description |229|----------|----------|------|230| quick | Project kickoff plan and goals | Core conclusions + minimum viable output |231| standard | Complete output (current default) | Complete output, including all Step outputs |232| deep | Complete kickoff + team alignment plan + risk contingency plan + communication mechanism design | Complete output + extended analysis + deep inference |233234## Output235236**Storage Path**: `output/pm-project/planning-kickoff/`237238**Output Files**: kickoff.json, metadata.json239240**Output Schema**:241242```json243{244 "type": "object",245 "required": ["kickoff", "metadata"],246 "properties": {247 "kickoff": {"type": "object", "description": "Kickoff meeting data, including agenda, background materials, prepared questions and meeting minutes"},248 "metadata": {"type": "object", "description": "Metadata, including meeting arrangement and preparation status"}249 }250}251```252253### Output Validation Rules254255| Field Path | Type | Required | Description |256|----------|------|------|------|257| kickoff.agenda.meeting_title | string | Yes | Meeting title, must include project name |258| kickoff.agenda.duration_minutes | number | Yes | Meeting duration (minutes), must be > 0 |259| kickoff.agenda.items | array | Yes | Agenda item list, each must contain order, topic, duration_minutes |260| kickoff.agenda.items[].decision_needed | boolean | Yes | Whether a decision is needed |261| kickoff.background_materials.executive_summary | string | Yes | Project summary, must be < 500 words |262| kickoff.background_materials.project_overview.objectives | array | Yes | Project objectives list, at least 1 item |263| kickoff.background_materials.key_risks | array | No | Key risks list |264| kickoff.background_materials.success_criteria | array | Yes | Success criteria list, at least 1 item |265| kickoff.prepared_questions[].priority | string | Yes | Question priority, enum value high/medium/low |266| kickoff.minutes.meeting_info.date | string | Yes | Meeting date, ISO 8601 format |267| kickoff.minutes.key_decisions | array | Yes | Key decisions list, each must contain decision, decision_maker, date |268| kickoff.action_items[].owner | string | Yes | Action item owner |269| kickoff.action_items[].due_date | string | Yes | Action item due date, ISO 8601 format |270| kickoff.action_items[].status | string | Yes | Action item status, enum value open/in_progress/completed |271| kickoff.follow_up_reminders[].type | string | Yes | Reminder type, enum value action_item/milestone/check_in |272| metadata.meeting_scheduled | boolean | Yes | Whether the meeting is scheduled |273| metadata.preparation_completed_at | string | Yes | Preparation completion time, ISO 8601 format |274275```json276{277 "kickoff": {278 "agenda": {279 "meeting_title": "Online Classroom Interactive Feature Project Kickoff Meeting",280 "duration_minutes": 90,281 "items": [282 {283 "order": 1,284 "topic": "Project Background & Objectives",285 "duration_minutes": 15,286 "presenter": "Zhang Ming (Product Owner)",287 "key_points": ["Increase classroom interaction rate to 60%", "Support real-time Q&A and voting features"],288 "decision_needed": false289 }290 ],291 "buffer_minutes": 10292 },293 "background_materials": {294 "executive_summary": "This project aims to add real-time classroom interactive features to the online education platform, including student hand-raising for questions, real-time voting, and bullet screen interaction, to improve student engagement and course completion rate.",295 "project_overview": {296 "objectives": ["Classroom interaction rate increased to 60%", "Course completion rate increased by 15%"],297 "scope": ["Real-time Q&A module", "Classroom voting module", "Bullet screen interaction module"],298 "timeline": "2024-Q2 (10 weeks)",299 "team": ["Zhang Ming (PM)", "Li Wei (Frontend Lead)", "Wang Fang (Backend Lead)", "Chen Gang (QA Lead)"]300 },301 "key_risks": ["WebSocket concurrent performance risk", "Integration complexity with existing player"],302 "success_criteria": ["Classroom interaction rate ≥ 60% after interactive feature launch", "P0 defect count = 0"],303 "document_links": [304 {305 "title": "Classroom Interaction PRD",306 "url": "https://wiki.example.com/class-interaction-prd",307 "description": "Classroom interactive feature product requirements document"308 }309 ]310 },311 "prepared_questions": [312 {313 "question": "Does the interactive feature need to support replay scenarios?",314 "likely_from": "Li Wei (Frontend Lead)",315 "prepared_answer": "Phase 1 only supports live scenarios, replay scenarios included in Phase 2 planning",316 "answer_owner": "Zhang Ming",317 "priority": "high"318 }319 ],320 "minutes": {321 "meeting_info": {322 "title": "Online Classroom Interactive Feature Project Kickoff Meeting",323 "date": "2024-04-01",324 "attendees": ["Zhang Ming", "Li Wei", "Wang Fang", "Chen Gang"],325 "absentees": []326 },327 "key_decisions": [328 {329 "decision": "Phase 1 only supports live scenario interaction, replay interaction included in Phase 2",330 "decision_maker": "Zhang Ming",331 "date": "2024-04-01"332 }333 ],334 "discussion_summary": "Team reached consensus on classroom interactive feature objectives, confirmed Phase 1 focuses on live scenarios, technical solution adopts WebSocket+Redis architecture",335 "unresolved_issues": ["Bullet screen message review mechanism to be confirmed"],336 "next_steps": ["Li Wei completes technical solution design", "Wang Fang completes API definition", "Chen Gang prepares test environment"]337 },338 "action_items": [339 {340 "id": "AI-001",341 "description": "Complete classroom interactive technical solution design document",342 "owner": "Li Wei",343 "due_date": "2024-04-08",344 "status": "open",345 "priority": "high",346 "related_decision": null347 }348 ],349 "follow_up_reminders": [350 {351 "id": "REM-001",352 "type": "action_item",353 "title": "Technical solution design document deadline reminder",354 "due_date": "2024-04-08",355 "notify": ["Li Wei", "Zhang Ming"],356 "reminder_timing": "1 day before",357 "auto_follow_up": true358 }359 ]360 },361 "metadata": {362 "meeting_scheduled": true,363 "meeting_date": "2024-04-01",364 "attendees_confirmed": ["Zhang Ming", "Li Wei", "Wang Fang", "Chen Gang"],365 "preparation_completed_at": "2024-03-31T18:00:00+08:00",366 "follow_up_enabled": true367 }368}369```370371---372373## Meeting Duration Recommendations374375| Project Scale | Recommended Duration |376|----------|----------|377| Small project (< 5 people, < 4 weeks) | 30-45 minutes |378| Medium project (5-15 people, 1-3 months) | 60-90 minutes |379| Large project (> 15 people, > 3 months) | 90-120 minutes |380381---382383## Decision Rules384385| Condition | Action |386|------|------|387| Key stakeholder cannot attend | Escalate to human to coordinate time |388| Major scope change arises during meeting | Trigger charter update process (Pipeline 1) |389| Action item cannot be assigned an owner | Escalate to project manager for decision |390| Meeting cannot be held as scheduled | Reschedule, send notification |391392## Quality Checks393394### P0 Checks (must pass for quick/standard/deep)395396- [ ] Agenda covers project objectives, scope, roles, timeline397- [ ] Key stakeholders confirmed to attend398399### P1 Checks (must pass for standard/deep)400401- [ ] Action items have clear owners and due dates402- [ ] Meeting materials sent to attendees in advance403404### P2 Checks (must pass for deep only)405406- [ ] Extended analysis is complete (deep inference and roadmap generated)407- [ ] Decision records are complete (key decisions have basis and alternatives)408409## Degradation Strategy410411### Upstream File Missing Degradation Plan412413| Missing Upstream Input | Degradation Plan | Output Impact |414|---------------|---------|---------|415| Project charter | User describes project objectives and scope, AI generates Kickoff agenda based on description | Kickoff agenda generated based on user description, lacking structured charter data support |416| Resource plan | Skip resource allocation discussion segment, annotate "resource plan to be confirmed" in agenda | Kickoff materials contain unconfirmed resource items, need post-meeting supplementation |417| Meeting attendees | User provides attendee list, AI adjusts agenda and question preparation accordingly | Based on user-provided attendee configuration, agenda and question pre-preparation may be incomplete |418| Preferred meeting time | If user does not provide preferred meeting time, prompt user to provide or skip steps related to this input | Meeting arrangement lacks time information, needs manual supplementation |419420### Data Acquisition Instructions421422When upstream files are missing, obtain necessary data through the following methods:4234241. **Project charter missing**: Ask user to describe project objectives, scope and key milestones, AI will generate Kickoff agenda and background material summary based on description4252. **Resource plan missing**: Skip resource allocation discussion segment in Kickoff agenda, annotate "resource plan to be confirmed", suggest adding resource discussion topic in the meeting4263. **Meeting attendees missing**: Ask user to provide attendee names and roles, AI will adjust agenda time allocation and question pre-preparation accordingly427428## Upstream Change Response429430### Upstream Change Impact Table431432| Upstream Change | Impact Scope | Response Strategy |433|----------|----------|----------|434| Project charter change (objectives/scope/success criteria adjustment) | Agenda content, background materials, question pre-preparation | Regenerate agenda and background materials, update question list |435| Resource plan change (personnel/budget adjustment) | Resource allocation discussion segment, team information | Update resource highlights in background materials, adjust related agenda segments |436| Attendee change (additions/removals/role changes) | Agenda time allocation, question pre-preparation, reminder configuration | Readjust agenda and question preparation, update reminder recipients |437438### Downstream Notification Mechanism Table439440| Change Type | Impact Scope | Notification Method |441|----------|----------|----------|442| Meeting agenda change | All attendees, meeting arrangement | Update kickoff.json, send agenda change notification |443| Action item change (addition/modification/completion) | Action item owner, project manager | Update kickoff.json, notify relevant responsible persons and project manager |444| Key decision change | Project charter, subsequent planning Pipeline | Update kickoff.json, notify planning-project-charter |