Project Charter Auto-generation
Core Principles
- Transparency Enables Collaboration: Project charter is visible to all, with objectives, scope, and success criteria transparent, eliminating information asymmetry
- Risk Early Identification: Identify preliminary risks at the charter generation stage, establishing the initial risk register
- Automated Tracking: Charter approval status and change records are automatically tracked, reducing manual reporting burden
Interaction Mode
🤖→👤 AI Suggests, Human Approves
- AI automatically completes Step 1-6, generating a complete project charter draft
- Human review focus: objective definition, scope boundaries, success criteria, stakeholder identification
- Human can request AI to modify specific sections, AI regenerates
- After human approval, the charter becomes officially effective
Input
| Input Item |
Type |
Required |
Source |
Description |
| product_background |
string |
Yes |
User provided |
Product background information |
| strategic_goals |
string[] |
Yes |
User provided |
Strategic objectives list |
| resource_constraints |
object |
○ |
User provided |
Resource constraint conditions |
Execution Steps
Step 1: Project Background Auto-compilation [Core]
Actions:
- Extract key product information (product name, positioning, core value)
- Compile market background and competitive environment
- Identify project origin and driving factors
- Generate concise project background description (within 200 words)
Output:
{
"background_summary": "string",
"product_info": {
"name": "string",
"positioning": "string",
"core_value": "string"
},
"market_context": "string",
"project_drivers": ["string"]
}
Step 2: Objectives & Scope Auto-definition [Core]
Actions:
- Decompose strategic objectives into measurable project objectives
- Distinguish project scope (what to do) and non-project scope (what not to do)
- Clarify risk scope (factors that may cause objective deviation)
- Generate SMART objective descriptions
Output:
{
"objectives": [{
"id": "OBJ-001",
"description": "string",
"measurable": "string",
"target_date": "ISO date"
}],
"scope": {
"in_scope": ["string"],
"out_of_scope": ["string"]
},
"risk_scope": ["string"]
}
Step 3: Success Criteria Auto-quantification [Core]
Actions:
- Define quantifiable success criteria for each objective
- Determine key performance indicators (KPIs)
- Set baseline values and target values
- Distinguish between "must achieve" and "desired to achieve"
Output:
{
"success_criteria": [{
"objective_id": "OBJ-001",
"kpi": "string",
"baseline": "number",
"target": "number",
"measurement_method": "string",
"must_achieve": true | false
}]
}
Step 4: Stakeholder Auto-identification [Core]
Actions:
- Scan stakeholders involved in the project (individuals, teams, departments)
- Assess each party's interests and influence
- Identify key decision makers and approvers
- Generate stakeholder matrix
Output:
{
"stakeholders": [{
"name": "string",
"role": "string",
"interest": "string",
"influence": "high | medium | low",
"engagement_level": "string"
}],
"key_decision_makers": ["string"],
"approval_required": ["string"]
}
Step 5: Preliminary Risk Assessment [Core]
Actions:
- Identify preliminary risks based on project background
- Assess probability and impact for each risk
- Suggest preliminary response strategies
- Sort by priority
Output:
{
"initial_risk_assessment": [{
"id": "RISK-001",
"description": "string",
"category": "technical | team | external | business",
"probability": 0.0-1.0,
"impact": 0.0-1.0,
"priority": "high | medium | low",
"initial_mitigation": "string"
}]
}
Step 6: Project Charter Document Generation [Core]
Actions:
- Integrate outputs from the above 5 steps
- Generate formal project charter document
- Format output as structured document
- Prepare human approval version
Output:
# project_charter
## Basic Information
- Project Name:
- Charter Version:
- Effective Date:
- Charter Owner:
## 1. Project Background
{Step 1 Output}
## 2. Objectives & Scope
{Step 2 Output}
## 3. Success Criteria
{Step 3 Output}
## 4. Stakeholders
{Step 4 Output}
## 5. Preliminary Risk Assessment
{Step 5 Output}
## 6. Resource Requirements Summary
{Estimated based on available information}
## 7. Timeline Summary
{Estimated based on available information}
## Approval Signatures
- Project Sponsor:
- Project Manager:
- Date:
Output Depth Grading
| Depth Level |
Output Scope |
Description |
| quick |
Project charter and objectives |
Core conclusions + minimum viable deliverable |
| standard |
Full deliverables (current default) |
Complete deliverables including all Step outputs |
| deep |
Full charter + stakeholder alignment + risk contingency + governance mechanism design |
Full deliverables + extended analysis + deep simulation |
Output
Storage Path: output/pm-project/planning-project-charter/
Output Files: project_charter.json, metadata.json
Output Schema:
{
"type": "object",
"required": ["project_charter", "metadata"],
"properties": {
"project_charter": {"type": "object", "description": "Project charter including background, objectives, success criteria, stakeholders, and risk assessment"},
"metadata": {"type": "object", "description": "Metadata including confidence, generation time, and approval status"}
}
}
Output Validation Rules
| Field Path |
Type |
Required |
Description |
| project_charter.background.summary |
string |
Yes |
Project background summary, must be < 200 words |
| project_charter.background.product_info.name |
string |
Yes |
Product name |
| project_charter.background.product_info.core_value |
string |
Yes |
Core value description |
| project_charter.objectives |
array |
Yes |
Project objectives list, at least 1 item |
| project_charter.objectives[].id |
string |
Yes |
Objective unique identifier, format OBJ-NNN |
| project_charter.objectives[].measurable |
string |
Yes |
Measurable indicator description |
| project_charter.objectives[].target_date |
string |
Yes |
Objective achievement date, ISO 8601 format |
| project_charter.scope.in_scope |
array |
Yes |
In-scope items, at least 1 item |
| project_charter.scope.out_of_scope |
array |
Yes |
Out-of-scope items, at least 1 item |
| project_charter.success_criteria |
array |
Yes |
Success criteria list, at least 1 item |
| project_charter.success_criteria[].must_achieve |
boolean |
Yes |
Whether it must be achieved |
| project_charter.stakeholders |
array |
Yes |
Stakeholder list, at least 1 item |
| project_charter.stakeholders[].influence |
string |
Yes |
Influence level, enum values high/medium/low |
| project_charter.initial_risk_assessment |
array |
No |
Preliminary risk assessment list |
| project_charter.initial_risk_assessment[].category |
string |
Yes |
Risk category, enum values technical/team/external/business |
| project_charter.initial_risk_assessment[].priority |
string |
Yes |
Risk priority, enum values high/medium/low |
| metadata.confidence |
number |
Yes |
Overall confidence, range 0.0-1.0 |
| metadata.generated_at |
string |
Yes |
Generation time, ISO 8601 format |
| metadata.human_approval_required |
boolean |
Yes |
Whether human approval is required, must be true for charter |
| metadata.approval_status |
string |
Yes |
Approval status, enum values pending/approved/rejected |
{
"project_charter": {
"background": {
"summary": "string",
"product_info": {},
"market_context": "string",
"project_drivers": []
},
"objectives": {
"scope": {},
"risk_scope": []
},
"success_criteria": [],
"stakeholders": [],
"initial_risk_assessment": [],
"resource_requirements": {},
"timeline": {}
},
"metadata": {
"confidence": 0.0-1.0,
"generated_at": "ISO datetime",
"human_approval_required": true,
"approval_status": "pending | approved | rejected"
}
}
Confidence Annotation
Each Step output must include confidence annotation:
| Confidence |
Meaning |
Action |
| High (≥0.8) |
Sufficient data, reasonable inference |
Can be used directly |
| Medium (0.6-0.8) |
Basically sufficient data, some inference |
Recommend human confirmation |
| Low (<0.6) |
Insufficient data or high inference uncertainty |
Must be reviewed by human |
Decision Rules
| Condition |
Action |
| Strategic objectives cannot align with project objectives |
Escalate to human decision |
| Stakeholder identification misses key personnel |
Escalate to human for supplementation |
| Success criteria cannot be quantified |
Escalate to human for definition |
| Number of preliminary risks > 10 |
Select Top 10, archive the rest as alternatives |
Quality Checks
P0 Checks (must pass for quick/standard/deep)
P1 Checks (must pass for standard/deep)
P2 Checks (must pass for deep only)
Degradation Strategy
Upstream File Missing Degradation Plan
| Missing Upstream Input |
Degradation Plan |
Output Impact |
| Product background |
User describes project objectives and core value, AI generates background summary based on description |
Charter draft generated from user description, lacking market background and competitive environment analysis |
| Strategic objectives |
User verbally states desired objectives, AI converts to SMART objectives |
Objective definition based on verbal conversion, requires human confirmation of SMART compliance |
| Resource constraints |
Skip resource requirement estimation, mark "Resource requirements pending assessment" in charter |
Charter draft contains pending resource assessment items, need to supplement in resource planning stage |
Data Acquisition Instructions
When upstream files are missing, obtain necessary data through the following methods:
- Product background missing: Ask user to describe project objectives, product positioning, and core value; AI will compile into structured project background summary
- Strategic objectives missing: Ask user to verbally state desired business objectives (e.g., "increase conversion rate by 20%"); AI will convert to SMART format measurable objectives
- Resource constraints missing: Mark resource requirements section as "pending assessment" in the charter, suggest supplementing in the resource planning stage (Pipeline 2)
Upstream Change Response
Upstream Change Impact Table
| Upstream Change |
Impact Scope |
Response Strategy |
| Product background change (positioning adjustment/market change) |
Project background summary, driving factors, risk assessment |
Recompile project background, update driving factors and preliminary risks |
| Strategic objectives change (objective additions/removals/priority adjustment) |
Project objectives, success criteria, scope definition |
Redecompose objectives, update success criteria and scope boundaries |
| Resource constraints change (budget/personnel adjustment) |
Resource requirement estimation, timeline |
Update resource requirements and timeline estimation |
Downstream Notification Mechanism Table
| Change Type |
Impact Scope |
Notification Method |
| Charter objectives/scope change |
Resource planning, Kickoff meeting, risk identification |
Update project_charter.json, notify planning-resource, planning-kickoff, risk-identification |
| Stakeholder change |
Kickoff meeting participants, communication plan |
Update project_charter.json, notify planning-kickoff |
| Approval status change |
All downstream Pipelines dependent on charter |
Update metadata.json, notify all downstream consumers |
1---2name: planning-project-charter3description: "Use when generating a project charter document. Project charter auto-generation, transforming product background, strategic objectives, and resource constraints into a formal project charter document, including background, objectives & scope, success criteria, stakeholders, preliminary risk assessment, resource requirements, and timeline. Keywords: project charter, project articles of association, project objectives, project scope, success criteria, project definition."4metadata:5 source: https://skillmd.com/skills/luckyonetwothree/planning-project-charter6 module: "Project Management & Execution"7 sub-module: "Project Planning"8 type: "pipeline"9 version: "3.1"10 domain_tags: ["Internet", "SaaS", "General"]11 trigger_examples:12 - "How to write a project charter"13 - "Help me create a project charter"14 - "How to define project objectives and scope"15 interaction_mode: "ai_suggest_human_approve"16execution_depth:17 default: standard18 quick_description: "Output project charter and objectives directly"19 deep_description: "Full charter + stakeholder alignment + risk contingency + governance mechanism design"20---2122# Project Charter Auto-generation2324## Core Principles25261. **Transparency Enables Collaboration**: Project charter is visible to all, with objectives, scope, and success criteria transparent, eliminating information asymmetry272. **Risk Early Identification**: Identify preliminary risks at the charter generation stage, establishing the initial risk register283. **Automated Tracking**: Charter approval status and change records are automatically tracked, reducing manual reporting burden2930## Interaction Mode3132**🤖→👤 AI Suggests, Human Approves**3334- AI automatically completes Step 1-6, generating a complete project charter draft35- Human review focus: objective definition, scope boundaries, success criteria, stakeholder identification36- Human can request AI to modify specific sections, AI regenerates37- After human approval, the charter becomes officially effective3839---4041## Input4243| Input Item | Type | Required | Source | Description |44|--------|------|------|------|------|45| product_background | string | Yes | User provided | Product background information |46| strategic_goals | string[] | Yes | User provided | Strategic objectives list |47| resource_constraints | object | ○ | User provided | Resource constraint conditions |4849---5051## Execution Steps5253### Step 1: Project Background Auto-compilation [Core]5455**Actions**:56- Extract key product information (product name, positioning, core value)57- Compile market background and competitive environment58- Identify project origin and driving factors59- Generate concise project background description (within 200 words)6061**Output**:62```json63{64 "background_summary": "string",65 "product_info": {66 "name": "string",67 "positioning": "string",68 "core_value": "string"69 },70 "market_context": "string",71 "project_drivers": ["string"]72}73```7475### Step 2: Objectives & Scope Auto-definition [Core]7677**Actions**:78- Decompose strategic objectives into measurable project objectives79- Distinguish project scope (what to do) and non-project scope (what not to do)80- Clarify risk scope (factors that may cause objective deviation)81- Generate SMART objective descriptions8283**Output**:84```json85{86 "objectives": [{87 "id": "OBJ-001",88 "description": "string",89 "measurable": "string",90 "target_date": "ISO date"91 }],92 "scope": {93 "in_scope": ["string"],94 "out_of_scope": ["string"]95 },96 "risk_scope": ["string"]97}98```99100### Step 3: Success Criteria Auto-quantification [Core]101102**Actions**:103- Define quantifiable success criteria for each objective104- Determine key performance indicators (KPIs)105- Set baseline values and target values106- Distinguish between "must achieve" and "desired to achieve"107108**Output**:109```json110{111 "success_criteria": [{112 "objective_id": "OBJ-001",113 "kpi": "string",114 "baseline": "number",115 "target": "number",116 "measurement_method": "string",117 "must_achieve": true | false118 }]119}120```121122### Step 4: Stakeholder Auto-identification [Core]123124**Actions**:125- Scan stakeholders involved in the project (individuals, teams, departments)126- Assess each party's interests and influence127- Identify key decision makers and approvers128- Generate stakeholder matrix129130**Output**:131```json132{133 "stakeholders": [{134 "name": "string",135 "role": "string",136 "interest": "string",137 "influence": "high | medium | low",138 "engagement_level": "string"139 }],140 "key_decision_makers": ["string"],141 "approval_required": ["string"]142}143```144145### Step 5: Preliminary Risk Assessment [Core]146147**Actions**:148- Identify preliminary risks based on project background149- Assess probability and impact for each risk150- Suggest preliminary response strategies151- Sort by priority152153**Output**:154```json155{156 "initial_risk_assessment": [{157 "id": "RISK-001",158 "description": "string",159 "category": "technical | team | external | business",160 "probability": 0.0-1.0,161 "impact": 0.0-1.0,162 "priority": "high | medium | low",163 "initial_mitigation": "string"164 }]165}166```167168### Step 6: Project Charter Document Generation [Core]169170**Actions**:171- Integrate outputs from the above 5 steps172- Generate formal project charter document173- Format output as structured document174- Prepare human approval version175176**Output**:177```yaml178# project_charter179180## Basic Information181- Project Name:182- Charter Version:183- Effective Date:184- Charter Owner:185186## 1. Project Background187{Step 1 Output}188189## 2. Objectives & Scope190{Step 2 Output}191192## 3. Success Criteria193{Step 3 Output}194195## 4. Stakeholders196{Step 4 Output}197198## 5. Preliminary Risk Assessment199{Step 5 Output}200201## 6. Resource Requirements Summary202{Estimated based on available information}203204## 7. Timeline Summary205{Estimated based on available information}206207## Approval Signatures208- Project Sponsor:209- Project Manager:210- Date:211```212213---214215### Output Depth Grading216217| Depth Level | Output Scope | Description |218|----------|----------|------|219| quick | Project charter and objectives | Core conclusions + minimum viable deliverable |220| standard | Full deliverables (current default) | Complete deliverables including all Step outputs |221| deep | Full charter + stakeholder alignment + risk contingency + governance mechanism design | Full deliverables + extended analysis + deep simulation |222223## Output224225**Storage Path**: `output/pm-project/planning-project-charter/`226227**Output Files**: project_charter.json, metadata.json228229**Output Schema**:230231```json232{233 "type": "object",234 "required": ["project_charter", "metadata"],235 "properties": {236 "project_charter": {"type": "object", "description": "Project charter including background, objectives, success criteria, stakeholders, and risk assessment"},237 "metadata": {"type": "object", "description": "Metadata including confidence, generation time, and approval status"}238 }239}240```241242### Output Validation Rules243244| Field Path | Type | Required | Description |245|----------|------|------|------|246| project_charter.background.summary | string | Yes | Project background summary, must be < 200 words |247| project_charter.background.product_info.name | string | Yes | Product name |248| project_charter.background.product_info.core_value | string | Yes | Core value description |249| project_charter.objectives | array | Yes | Project objectives list, at least 1 item |250| project_charter.objectives[].id | string | Yes | Objective unique identifier, format OBJ-NNN |251| project_charter.objectives[].measurable | string | Yes | Measurable indicator description |252| project_charter.objectives[].target_date | string | Yes | Objective achievement date, ISO 8601 format |253| project_charter.scope.in_scope | array | Yes | In-scope items, at least 1 item |254| project_charter.scope.out_of_scope | array | Yes | Out-of-scope items, at least 1 item |255| project_charter.success_criteria | array | Yes | Success criteria list, at least 1 item |256| project_charter.success_criteria[].must_achieve | boolean | Yes | Whether it must be achieved |257| project_charter.stakeholders | array | Yes | Stakeholder list, at least 1 item |258| project_charter.stakeholders[].influence | string | Yes | Influence level, enum values high/medium/low |259| project_charter.initial_risk_assessment | array | No | Preliminary risk assessment list |260| project_charter.initial_risk_assessment[].category | string | Yes | Risk category, enum values technical/team/external/business |261| project_charter.initial_risk_assessment[].priority | string | Yes | Risk priority, enum values high/medium/low |262| metadata.confidence | number | Yes | Overall confidence, range 0.0-1.0 |263| metadata.generated_at | string | Yes | Generation time, ISO 8601 format |264| metadata.human_approval_required | boolean | Yes | Whether human approval is required, must be true for charter |265| metadata.approval_status | string | Yes | Approval status, enum values pending/approved/rejected |266267```json268{269 "project_charter": {270 "background": {271 "summary": "string",272 "product_info": {},273 "market_context": "string",274 "project_drivers": []275 },276 "objectives": {277 "scope": {},278 "risk_scope": []279 },280 "success_criteria": [],281 "stakeholders": [],282 "initial_risk_assessment": [],283 "resource_requirements": {},284 "timeline": {}285 },286 "metadata": {287 "confidence": 0.0-1.0,288 "generated_at": "ISO datetime",289 "human_approval_required": true,290 "approval_status": "pending | approved | rejected"291 }292}293```294295---296297## Confidence Annotation298299Each Step output must include confidence annotation:300301| Confidence | Meaning | Action |302|--------|------|------|303| High (≥0.8) | Sufficient data, reasonable inference | Can be used directly |304| Medium (0.6-0.8) | Basically sufficient data, some inference | Recommend human confirmation |305| Low (<0.6) | Insufficient data or high inference uncertainty | Must be reviewed by human |306307---308309## Decision Rules310311| Condition | Action |312|------|------|313| Strategic objectives cannot align with project objectives | Escalate to human decision |314| Stakeholder identification misses key personnel | Escalate to human for supplementation |315| Success criteria cannot be quantified | Escalate to human for definition |316| Number of preliminary risks > 10 | Select Top 10, archive the rest as alternatives |317318## Quality Checks319320### P0 Checks (must pass for quick/standard/deep)321322- [ ] Project objectives follow SMART principles323- [ ] Stakeholders cover all key roles324325### P1 Checks (must pass for standard/deep)326327- [ ] Success criteria are quantifiable and verifiable328- [ ] Preliminary risk list includes impact and probability assessment329330### P2 Checks (must pass for deep only)331332- [ ] Extended analysis complete (deep simulation and roadmap generated)333- [ ] Decision records complete (key decisions have rationale and alternatives)334335## Degradation Strategy336337### Upstream File Missing Degradation Plan338339| Missing Upstream Input | Degradation Plan | Output Impact |340|---------------|---------|---------|341| Product background | User describes project objectives and core value, AI generates background summary based on description | Charter draft generated from user description, lacking market background and competitive environment analysis |342| Strategic objectives | User verbally states desired objectives, AI converts to SMART objectives | Objective definition based on verbal conversion, requires human confirmation of SMART compliance |343| Resource constraints | Skip resource requirement estimation, mark "Resource requirements pending assessment" in charter | Charter draft contains pending resource assessment items, need to supplement in resource planning stage |344345### Data Acquisition Instructions346347When upstream files are missing, obtain necessary data through the following methods:3483491. **Product background missing**: Ask user to describe project objectives, product positioning, and core value; AI will compile into structured project background summary3502. **Strategic objectives missing**: Ask user to verbally state desired business objectives (e.g., "increase conversion rate by 20%"); AI will convert to SMART format measurable objectives3513. **Resource constraints missing**: Mark resource requirements section as "pending assessment" in the charter, suggest supplementing in the resource planning stage (Pipeline 2)352353## Upstream Change Response354355### Upstream Change Impact Table356357| Upstream Change | Impact Scope | Response Strategy |358|----------|----------|----------|359| Product background change (positioning adjustment/market change) | Project background summary, driving factors, risk assessment | Recompile project background, update driving factors and preliminary risks |360| Strategic objectives change (objective additions/removals/priority adjustment) | Project objectives, success criteria, scope definition | Redecompose objectives, update success criteria and scope boundaries |361| Resource constraints change (budget/personnel adjustment) | Resource requirement estimation, timeline | Update resource requirements and timeline estimation |362363### Downstream Notification Mechanism Table364365| Change Type | Impact Scope | Notification Method |366|----------|----------|----------|367| Charter objectives/scope change | Resource planning, Kickoff meeting, risk identification | Update project_charter.json, notify planning-resource, planning-kickoff, risk-identification |368| Stakeholder change | Kickoff meeting participants, communication plan | Update project_charter.json, notify planning-kickoff |369| Approval status change | All downstream Pipelines dependent on charter | Update metadata.json, notify all downstream consumers |