Roadmap Auto-Planning
Core Principles
- Strategic theme driven — Epics must be decomposed from OKR and SWOT strategic themes, not planned arbitrarily
- RICE quantitative scoring — All Epics use the RICE formula for quantitative scoring, ranking is evidence-based
- Now/Next/Later layering — Three-tier planning by priority and time dimension, avoiding flat listing
- Explicit dependency risks — Each Epic marks dependencies and risks, including mitigation measures
Interaction Mode
🤖→👤 AI suggests, human approves
Input
| Input Item |
Type |
Required |
Source |
Description |
| OKR objectives and key results |
JSON |
Yes |
output/pm-strategy/planning-okr/okr.json |
Objectives and Key Results |
| SWOT strategic direction |
JSON |
Yes |
output/pm-strategy/strategic-analysis/strategic-analysis.json |
SO/ST/WO/WT strategic directions |
| Requirement priority scores |
JSON |
○ |
Covered by design-prd |
RICE scoring results |
| Resource constraints |
JSON |
○ |
User provided |
Team capacity, budget, time constraints |
Execution Steps
Step 1: Strategic Theme Extraction [Core]
Extract 3-5 strategic themes from OKR and SWOT:
Theme = Strategic Direction + Business Objective + Value Proposition
Each strategic theme includes:
- Theme name
- Supporting OKR
- Strategic significance
Step 2: Epic-Level Planning [Core]
Decompose strategic themes into quarterly Epics:
epic:
name: "Epic name"
quarter: "Q1 2024"
description: "Epic description"
success_metric: "Success metric"
rice_score: 75
effort: "Person-months"
dependencies:
- "Dependency 1"
- "Dependency 2"
risks:
- risk: "Risk description"
likelihood: "high/medium/low"
mitigation: "Mitigation measure"
key_assumptions:
- "Key assumption 1"
- "Key assumption 2"
Step 3: Now/Next/Later Layering [Core]
Layer based on RICE score and time dimension:
Now (Current Quarter)
- Confirmed high-priority Epics
- Must-complete dependencies
- High-confidence projects
Next (Next Quarter)
- Planned but adjustable Epics
- Dependent on Now phase results
- Medium-priority projects
Later (Future)
- Directional planning
- Assumptions requiring further validation
- Low-priority or exploratory projects
Step 4: RICE Score Calculation [Core]
RICE formula:
RICE Score = (Reach × Impact × Confidence) ÷ Effort
Scoring criteria:
- Reach: Number of users/customers impacted
- Impact: Degree of positive impact on objectives (0.25-3)
- Confidence: Confidence level in data and assumptions (0.5-1)
- Effort: Person-months required to complete
Step 5: Risk Annotation [Core]
Identify and annotate risks:
- Technical risks
- Resource risks
- Dependency risks
- Market risks
Output Depth Levels
| Depth Level |
Output Scope |
Description |
| quick |
Roadmap and milestones |
Core conclusions + minimum viable output |
| standard |
Full output (current default) |
Complete output including all Step outputs |
| deep |
Full roadmap + dependency analysis + risk buffer design + multi-scenario roadmap |
Full output + extended analysis + deep inference |
Output
Storage Path: output/pm-strategy/planning-roadmap/
Output File: roadmap.json
Output Validation Rules
| Field Path |
Type |
Required |
Description |
| roadmap.strategic_themes |
array |
Yes |
3-5 strategic themes |
| roadmap.strategic_themes[].theme |
string |
Yes |
Theme name |
| roadmap.strategic_themes[].okr_reference |
string |
Yes |
Associated OKR |
| roadmap.strategic_themes[].priority |
number |
No |
Theme priority ranking |
| roadmap.quarterly_epics |
array |
Yes |
Quarterly Epic list |
| roadmap.quarterly_epics[].quarter |
string |
Yes |
Quarter identifier |
| roadmap.quarterly_epics[].epics |
array |
Yes |
Epic list |
| roadmap.quarterly_epics[].epics[].name |
string |
Yes |
Epic name, cannot be empty |
| roadmap.quarterly_epics[].epics[].success_metric |
string |
No |
Success metric |
| roadmap.quarterly_epics[].epics[].rice_score |
number |
Yes |
RICE score |
| roadmap.quarterly_epics[].epics[].effort |
number |
Yes |
Effort (person-months) |
| roadmap.quarterly_epics[].epics[].dependencies |
array |
No |
Dependencies list |
| roadmap.quarterly_epics[].epics[].risks |
array |
Yes |
Risks list |
| roadmap.quarterly_epics[].epics[].risks[].risk |
string |
Yes |
Risk description |
| roadmap.quarterly_epics[].epics[].risks[].likelihood |
string |
Yes |
Likelihood, enum: high/medium/low |
| roadmap.quarterly_epics[].epics[].risks[].mitigation |
string |
No |
Mitigation measure |
| roadmap.now_next_later |
object |
Yes |
Three-tier layering |
| roadmap.now_next_later.now |
array |
Yes |
Current quarter Epics |
| roadmap.now_next_later.now[].epic |
string |
Yes |
Epic name |
| roadmap.now_next_later.now[].quarter |
string |
No |
Quarter identifier |
| roadmap.now_next_later.now[].rationale |
string |
No |
Layering rationale |
| roadmap.now_next_later.next |
array |
Yes |
Next quarter Epics |
| roadmap.now_next_later.next[].epic |
string |
Yes |
Epic name |
| roadmap.now_next_later.next[].quarter |
string |
No |
Quarter identifier |
| roadmap.now_next_later.next[].rationale |
string |
No |
Layering rationale |
| roadmap.now_next_later.later |
array |
Yes |
Future Epics |
| roadmap.now_next_later.later[].epic |
string |
Yes |
Epic name |
| roadmap.now_next_later.later[].quarter |
string |
No |
Quarter identifier |
| roadmap.now_next_later.later[].rationale |
string |
No |
Layering rationale |
roadmap:
strategic_themes:
- theme: "User Growth"
okr_reference: "O1: Increase user activity"
priority: 1
- theme: "Business Monetization"
okr_reference: "O2: Optimize unit economics"
priority: 2
quarterly_epics:
- quarter: "Q1 2024"
epics:
- epic: "User Onboarding Optimization"
success_metric: "New user activation rate increased by 30%"
rice_score: 85
effort: 3
dependencies: ["Design resources"]
risks:
- risk: "Technical implementation complexity"
likelihood: "medium"
mitigation: "Reserve time for technical research"
key_assumptions:
- "Data analysis supports optimization direction"
- quarter: "Q2 2024"
epics:
- epic: "Social Feature Development"
success_metric: "User interaction rate increased by 50%"
rice_score: 72
effort: 5
dependencies: ["Backend API support"]
risks:
- risk: "User privacy compliance"
likelihood: "high"
mitigation: "Legal team involvement in advance"
key_assumptions:
- "High user acceptance after feature launch"
now_next_later:
now:
- epic: "User Onboarding Optimization"
quarter: "Q1"
rationale: "High RICE score, directly supports OKR"
next:
- epic: "Social Feature Development"
quarter: "Q2"
rationale: "Depends on Q1 data validation, needs further research"
later:
- epic: "International Expansion"
quarter: "Q3+"
rationale: "Long-term strategic direction, needs market validation"
Decision Rules
- RICE calculation: AI automatically completes the calculation
- Priority decision: Human makes final priority decision
- Resource allocation: Human decides quarterly resource allocation
- Layering adjustment: Human can adjust Now/Next/Later layering
Quality Checks
P0 Checks (must pass for quick/standard/deep)
P1 Checks (must pass for standard/deep)
P2 Checks (must pass for deep only)
Degradation Strategy
When upstream files do not exist, this Skill can still execute independently:
| Missing Upstream Input |
Degradation Plan |
Output Impact |
Data Acquisition Instructions |
| okr.json |
User provides objective list → directly plan roadmap |
Lacking OKR structured data, strategic theme alignment with OKR may be insufficient |
Ask user to provide business objectives and key results or upload okr.json file |
| strategic-analysis.json |
User provides objective list → directly plan roadmap |
Lacking strategic analysis data, strategic themes may deviate from strategic direction |
Ask user to provide strategic direction and priority descriptions or upload strategic-analysis.json file |
| Requirement priority data (insight-analysis / design-prd) |
User provides objective list → directly plan roadmap |
Lacking requirement priority data, RICE scoring lacks input basis |
Ask user to provide feature requirement list and priority ranking or upload insight-analysis.json file |
| okr.json + strategic-analysis.json + requirement priority |
User provides objective list → directly plan roadmap |
Overall confidence reduced, Epic ranking lacks data anchoring |
Ask user to provide business objectives, strategic direction, and feature priorities |
| All upstream files missing |
Prompt user to execute prior stages first, or directly plan roadmap based on user-provided objective list |
Overall confidence significantly reduced, roadmap is only a general planning reference |
Ask user to provide business objectives, feature requirements, and priority ranking |
| Resource constraints (user provided) |
If user has not provided resource constraints, prompt user to provide or skip steps related to this input |
Lacking resource constraints, Epic effort estimates may be unrealistic |
Ask user to provide team size, tech stack, and available timeline resource constraint information |
Data Acquisition Instructions
This Skill requires OKR, strategic analysis, and requirement priority data. Please provide via one of the following methods:
- Directly describe business objectives and feature priorities
- Upload okr.json / strategic-analysis.json / insight-analysis.json files
- Provide data file paths
- AI is not responsible for external data collection, only for analysis
Upstream Change Response
Upstream Change Impact Table
| Upstream Change |
Impact Scope |
Response Strategy |
| okr.json OKR adjustment |
Strategic themes and Epic planning |
Re-execute Step 1-2, update strategic themes and Epics |
| strategic-analysis.json strategic analysis update |
Strategic theme direction |
Re-execute Step 1, update strategic themes |
| Requirement priority data change |
RICE scoring and ranking |
Re-execute Step 4, update RICE scores and layering |
Downstream Notification Mechanism Table
| Change Type |
Impact Scope |
Notification Method |
| Strategic theme adjustment |
business-strategy-report, stakeholder-analysis |
Output file version number + change summary |
| Epic priority change |
business-strategy-report |
Output file version number + change summary |
| Now/Next/Later layering change |
stakeholder-analysis |
Output file version number + change summary |
1---2name: planning-roadmap3description: "Use when you need to create a product roadmap, quarterly plan, version plan, or resource allocation. Roadmap auto-planning. Based on OKR and strategic direction, plan Epic-level product roadmap with Now/Next/Later layering and RICE scoring. Keywords: product roadmap, version planning, RICE scoring, quarterly planning, Epic planning, what features to build, schedule planning."4metadata:5 source: https://skillmd.com/skills/luckyonetwothree/planning-roadmap6 module: "Product Business & Strategy"7 sub-module: "Strategic Planning & Roadmap"8 type: "pipeline"9 version: "2.1"10 domain_tags: ["SaaS", "General"]11 trigger_examples:12 - "Help me plan the product roadmap"13 - "What to build next version"14 interaction_mode: "ai_suggest_human_approve"15execution_depth:16 default: standard17 quick_description: "Directly output roadmap and milestones"18 deep_description: "Full roadmap + dependency analysis + risk buffer design + multi-scenario roadmap"19---2021# Roadmap Auto-Planning2223## Core Principles24251. **Strategic theme driven** — Epics must be decomposed from OKR and SWOT strategic themes, not planned arbitrarily262. **RICE quantitative scoring** — All Epics use the RICE formula for quantitative scoring, ranking is evidence-based273. **Now/Next/Later layering** — Three-tier planning by priority and time dimension, avoiding flat listing284. **Explicit dependency risks** — Each Epic marks dependencies and risks, including mitigation measures2930## Interaction Mode31🤖→👤 AI suggests, human approves3233## Input3435| Input Item | Type | Required | Source | Description |36|--------|------|------|------|------|37| OKR objectives and key results | JSON | Yes | output/pm-strategy/planning-okr/okr.json | Objectives and Key Results |38| SWOT strategic direction | JSON | Yes | output/pm-strategy/strategic-analysis/strategic-analysis.json | SO/ST/WO/WT strategic directions |39| Requirement priority scores | JSON | ○ | Covered by design-prd | RICE scoring results |40| Resource constraints | JSON | ○ | User provided | Team capacity, budget, time constraints |4142## Execution Steps4344### Step 1: Strategic Theme Extraction [Core]4546Extract 3-5 strategic themes from OKR and SWOT:4748```49Theme = Strategic Direction + Business Objective + Value Proposition50```5152Each strategic theme includes:53- Theme name54- Supporting OKR55- Strategic significance5657### Step 2: Epic-Level Planning [Core]5859Decompose strategic themes into quarterly Epics:6061```yaml62epic:63 name: "Epic name"64 quarter: "Q1 2024"65 description: "Epic description"66 success_metric: "Success metric"67 rice_score: 7568 effort: "Person-months"69 dependencies:70 - "Dependency 1"71 - "Dependency 2"72 risks:73 - risk: "Risk description"74 likelihood: "high/medium/low"75 mitigation: "Mitigation measure"76 key_assumptions:77 - "Key assumption 1"78 - "Key assumption 2"79```8081### Step 3: Now/Next/Later Layering [Core]8283Layer based on RICE score and time dimension:8485**Now (Current Quarter)**86- Confirmed high-priority Epics87- Must-complete dependencies88- High-confidence projects8990**Next (Next Quarter)**91- Planned but adjustable Epics92- Dependent on Now phase results93- Medium-priority projects9495**Later (Future)**96- Directional planning97- Assumptions requiring further validation98- Low-priority or exploratory projects99100### Step 4: RICE Score Calculation [Core]101102RICE formula:103```104RICE Score = (Reach × Impact × Confidence) ÷ Effort105```106107Scoring criteria:108- **Reach**: Number of users/customers impacted109- **Impact**: Degree of positive impact on objectives (0.25-3)110- **Confidence**: Confidence level in data and assumptions (0.5-1)111- **Effort**: Person-months required to complete112113### Step 5: Risk Annotation [Core]114115Identify and annotate risks:116- Technical risks117- Resource risks118- Dependency risks119- Market risks120121### Output Depth Levels122123| Depth Level | Output Scope | Description |124|----------|----------|------|125| quick | Roadmap and milestones | Core conclusions + minimum viable output |126| standard | Full output (current default) | Complete output including all Step outputs |127| deep | Full roadmap + dependency analysis + risk buffer design + multi-scenario roadmap | Full output + extended analysis + deep inference |128129## Output130131**Storage Path**: `output/pm-strategy/planning-roadmap/`132133**Output File**: roadmap.json134135### Output Validation Rules136137| Field Path | Type | Required | Description |138|----------|------|------|------|139| roadmap.strategic_themes | array | Yes | 3-5 strategic themes |140| roadmap.strategic_themes[].theme | string | Yes | Theme name |141| roadmap.strategic_themes[].okr_reference | string | Yes | Associated OKR |142| roadmap.strategic_themes[].priority | number | No | Theme priority ranking |143| roadmap.quarterly_epics | array | Yes | Quarterly Epic list |144| roadmap.quarterly_epics[].quarter | string | Yes | Quarter identifier |145| roadmap.quarterly_epics[].epics | array | Yes | Epic list |146| roadmap.quarterly_epics[].epics[].name | string | Yes | Epic name, cannot be empty |147| roadmap.quarterly_epics[].epics[].success_metric | string | No | Success metric |148| roadmap.quarterly_epics[].epics[].rice_score | number | Yes | RICE score |149| roadmap.quarterly_epics[].epics[].effort | number | Yes | Effort (person-months) |150| roadmap.quarterly_epics[].epics[].dependencies | array | No | Dependencies list |151| roadmap.quarterly_epics[].epics[].risks | array | Yes | Risks list |152| roadmap.quarterly_epics[].epics[].risks[].risk | string | Yes | Risk description |153| roadmap.quarterly_epics[].epics[].risks[].likelihood | string | Yes | Likelihood, enum: high/medium/low |154| roadmap.quarterly_epics[].epics[].risks[].mitigation | string | No | Mitigation measure |155| roadmap.now_next_later | object | Yes | Three-tier layering |156| roadmap.now_next_later.now | array | Yes | Current quarter Epics |157| roadmap.now_next_later.now[].epic | string | Yes | Epic name |158| roadmap.now_next_later.now[].quarter | string | No | Quarter identifier |159| roadmap.now_next_later.now[].rationale | string | No | Layering rationale |160| roadmap.now_next_later.next | array | Yes | Next quarter Epics |161| roadmap.now_next_later.next[].epic | string | Yes | Epic name |162| roadmap.now_next_later.next[].quarter | string | No | Quarter identifier |163| roadmap.now_next_later.next[].rationale | string | No | Layering rationale |164| roadmap.now_next_later.later | array | Yes | Future Epics |165| roadmap.now_next_later.later[].epic | string | Yes | Epic name |166| roadmap.now_next_later.later[].quarter | string | No | Quarter identifier |167| roadmap.now_next_later.later[].rationale | string | No | Layering rationale |168169```yaml170roadmap:171 strategic_themes:172 - theme: "User Growth"173 okr_reference: "O1: Increase user activity"174 priority: 1175 - theme: "Business Monetization"176 okr_reference: "O2: Optimize unit economics"177 priority: 2178 quarterly_epics:179 - quarter: "Q1 2024"180 epics:181 - epic: "User Onboarding Optimization"182 success_metric: "New user activation rate increased by 30%"183 rice_score: 85184 effort: 3185 dependencies: ["Design resources"]186 risks:187 - risk: "Technical implementation complexity"188 likelihood: "medium"189 mitigation: "Reserve time for technical research"190 key_assumptions:191 - "Data analysis supports optimization direction"192 - quarter: "Q2 2024"193 epics:194 - epic: "Social Feature Development"195 success_metric: "User interaction rate increased by 50%"196 rice_score: 72197 effort: 5198 dependencies: ["Backend API support"]199 risks:200 - risk: "User privacy compliance"201 likelihood: "high"202 mitigation: "Legal team involvement in advance"203 key_assumptions:204 - "High user acceptance after feature launch"205 now_next_later:206 now:207 - epic: "User Onboarding Optimization"208 quarter: "Q1"209 rationale: "High RICE score, directly supports OKR"210 next:211 - epic: "Social Feature Development"212 quarter: "Q2"213 rationale: "Depends on Q1 data validation, needs further research"214 later:215 - epic: "International Expansion"216 quarter: "Q3+"217 rationale: "Long-term strategic direction, needs market validation"218```219220## Decision Rules2212221. **RICE calculation**: AI automatically completes the calculation2232. **Priority decision**: Human makes final priority decision2243. **Resource allocation**: Human decides quarterly resource allocation2254. **Layering adjustment**: Human can adjust Now/Next/Later layering226227## Quality Checks228229### P0 Checks (must pass for quick/standard/deep)230231- [ ] Epics have clear success metrics232- [ ] All Epics have dependency annotations233234### P1 Checks (must pass for standard/deep)235236- [ ] Now/Next/Later layering is complete237- [ ] RICE scores are calculated238- [ ] Risks are identified with mitigation measures239- [ ] Resource estimates are reasonable240241### P2 Checks (must pass for deep only)242243- [ ] Extended analysis is complete (deep inference and roadmap generated)244- [ ] Decision records are complete (key decisions have rationale and alternatives)245246---247248## Degradation Strategy249250When upstream files do not exist, this Skill can still execute independently:251252| Missing Upstream Input | Degradation Plan | Output Impact | Data Acquisition Instructions |253|---------------|---------|---------|------------|254| okr.json | User provides objective list → directly plan roadmap | Lacking OKR structured data, strategic theme alignment with OKR may be insufficient | Ask user to provide business objectives and key results or upload okr.json file |255| strategic-analysis.json | User provides objective list → directly plan roadmap | Lacking strategic analysis data, strategic themes may deviate from strategic direction | Ask user to provide strategic direction and priority descriptions or upload strategic-analysis.json file |256| Requirement priority data (insight-analysis / design-prd) | User provides objective list → directly plan roadmap | Lacking requirement priority data, RICE scoring lacks input basis | Ask user to provide feature requirement list and priority ranking or upload insight-analysis.json file |257| okr.json + strategic-analysis.json + requirement priority | User provides objective list → directly plan roadmap | Overall confidence reduced, Epic ranking lacks data anchoring | Ask user to provide business objectives, strategic direction, and feature priorities |258| All upstream files missing | Prompt user to execute prior stages first, or directly plan roadmap based on user-provided objective list | Overall confidence significantly reduced, roadmap is only a general planning reference | Ask user to provide business objectives, feature requirements, and priority ranking |259| Resource constraints (user provided) | If user has not provided resource constraints, prompt user to provide or skip steps related to this input | Lacking resource constraints, Epic effort estimates may be unrealistic | Ask user to provide team size, tech stack, and available timeline resource constraint information |260261## Data Acquisition Instructions262263This Skill requires OKR, strategic analysis, and requirement priority data. Please provide via one of the following methods:264 1. Directly describe business objectives and feature priorities265 2. Upload okr.json / strategic-analysis.json / insight-analysis.json files266 3. Provide data file paths267- AI is not responsible for external data collection, only for analysis268269---270271## Upstream Change Response272273### Upstream Change Impact Table274275| Upstream Change | Impact Scope | Response Strategy |276|----------|----------|----------|277| okr.json OKR adjustment | Strategic themes and Epic planning | Re-execute Step 1-2, update strategic themes and Epics |278| strategic-analysis.json strategic analysis update | Strategic theme direction | Re-execute Step 1, update strategic themes |279| Requirement priority data change | RICE scoring and ranking | Re-execute Step 4, update RICE scores and layering |280281### Downstream Notification Mechanism Table282283| Change Type | Impact Scope | Notification Method |284|----------|----------|----------|285| Strategic theme adjustment | business-strategy-report, stakeholder-analysis | Output file version number + change summary |286| Epic priority change | business-strategy-report | Output file version number + change summary |287| Now/Next/Later layering change | stakeholder-analysis | Output file version number + change summary |