Product Launch Commander
Code Write Boundary
Follow Engineering Boundary Protocol or the equivalent relative path from this skill.
- Scan first: identify framework, package manager, module layout, ORM, migration tool, validation library, auth middleware, and test conventions before implementation.
- Target scope: declare exact files/directories to create or modify; generated code must stay inside the target module unless integration files are explicitly required.
- No overwrite: preserve existing business logic, routes, models, migrations, configs, and tests unless the user explicitly asks for replacement.
- Consistency checks: verify OpenAPI, controller/service signatures, DTO/schema validation, ER model, migrations, repositories, and auth rules are aligned.
- Migration safety: generated migrations must be additive by default; destructive data changes require explicit human confirmation.
- Implementation report: list created/modified files, skipped files, checks run, failed checks, and residual risks.
Core Principles
PRD as contract, parallel construction, integration verification, progressive delivery
The core challenge of product launch is not the lack of skills in any single domain but the coordination across three major domains: PM's PRD must simultaneously satisfy Backend's API design needs and UI's interface design needs; Backend's API contracts must align with UI's frontend integration; any party's changes ripple to others. This orchestrator uses PRD as the core contract, managing cross-domain data flow and stage gates.
Execution Steps
- PM first: Complete exploration, strategy, and design full process first, producing PRD as cross-domain contract
- Parallel construction: After PRD confirmed, Backend and UI start simultaneously, shortening overall timeline
- Integration verification: After frontend and backend development completed, verify integration through integration orchestrator
- Progressive delivery: Quality verification -> gradual rollout -> full rollout -> retrospective
Orchestration Protocol
The orchestration protocol follows the unified standard in orchestrator-protocol.md.
Pipeline
pipeline: product-launch-orchestrator
version: 8.0
post_pipeline:
- action: stage-summary
output: output/phase-reports/cross-domain/product-launch-orchestrator.md
stages:
- id: phase-1
name: "Insight Analysis"
depends_on: []
skills: [insight-orchestrator]
gate:
condition: "Insight report confirmed by human"
fail_action: "Supplement product direction or requirement information"
- id: phase-2
name: "Market Analysis"
depends_on: [phase-1]
skills: [market-orchestrator]
gate:
condition: "Market analysis confirmed by human"
fail_action: "Supplement market data or competitor information"
- id: phase-3
name: "Business Model"
depends_on: [phase-1, phase-2]
skills: [business-orchestrator]
gate:
condition: "Business model confirmed by human"
fail_action: "Supplement business model elements"
- id: phase-4
name: "Positioning Strategy"
depends_on: [phase-3]
skills: [positioning-orchestrator]
gate:
condition: "Positioning statement confirmed by human"
fail_action: "Adjust positioning strategy"
- id: phase-5
name: "Product Design"
depends_on: [phase-3, phase-4]
skills: [design-orchestrator]
gate:
condition: "PRD confirmed by human"
fail_action: "Supplement requirement details"
- id: phase-6
name: "Metrics System"
depends_on: [phase-5]
parallel_with: [phase-7]
skills: [metrics-orchestrator]
gate:
condition: "Metrics system confirmed by human"
fail_action: "Supplement metric definitions"
- id: phase-7
name: "API Design"
depends_on: [phase-5]
parallel_with: [phase-6]
skills: [api-design-orchestrator]
gate:
condition: "API contract confirmed by human"
fail_action: "Adjust API design"
- id: phase-8
name: "UI Development"
depends_on: [phase-5, phase-7]
parallel_with: [phase-9]
skills: [ui-orchestrator]
gate:
condition: "UI development and integration verification passed"
fail_action: "Fix integration issues"
- id: phase-9
name: "Backend Implementation"
depends_on: [phase-7]
parallel_with: [phase-8]
skills: [data-architecture-orchestrator, backend-architecture-orchestrator]
gate:
condition: "Backend review passed (P0=0)"
fail_action: "Fix P0 issues"
- id: phase-10
name: "Delivery and Launch"
depends_on: [phase-8, phase-9, phase-6]
skills: [release-orchestrator, monitoring-orchestrator, iteration-orchestrator, agile-orchestrator]
gate:
condition: "P0 issues = 0, P1 issues <= 3, gradual rollout passed, retrospective conclusions confirmed"
fail_action: "Fix blocking issues and re-verify"
Stage Execution Plan
Stage 1: Insight Discovery
Invoke insight-orchestrator
Invoke: ${insight-orchestrator}
Input:
User feedback: Initial user feedback data
Market data: Market trends and size data
Competitor information: Competitor analysis materials
Output: output/cross-domain/insight-orchestrator/
Validation: Insight report confirmed by human
Mode: AI->Human
Stage 2: Market Analysis
Invoke market-orchestrator
Invoke: ${market-orchestrator}
Input:
Insight report: output/cross-domain/insight-orchestrator/
Output: output/cross-domain/market-orchestrator/
Validation: Market analysis confirmed by human
Mode: AI->Human
Stage 3: Business Strategy
Invoke business-orchestrator
Invoke: ${business-orchestrator}
Input:
Insight report: output/cross-domain/insight-orchestrator/
Market analysis: output/cross-domain/market-orchestrator/
Output: output/cross-domain/business-orchestrator/
Validation: Business model confirmed by human
Mode: AI->Human
Stage 4: Strategic Positioning
Invoke positioning-orchestrator
Invoke: ${positioning-orchestrator}
Input:
Business model: output/cross-domain/business-orchestrator/
Output: output/cross-domain/positioning-orchestrator/
Validation: Positioning statement confirmed by human
Mode: AI->Human
Stage 5: Solution Design
Invoke design-orchestrator
Invoke: ${design-orchestrator}
Input:
Positioning statement: output/cross-domain/positioning-orchestrator/
Business model: output/cross-domain/business-orchestrator/
Output: output/cross-domain/design-orchestrator/
Validation: PRD confirmed by human
Mode: AI->Human
Stage 6: Metrics System (Parallel Branch)
Invoke metrics-orchestrator
Invoke: ${metrics-orchestrator}
Input:
PRD: output/cross-domain/design-orchestrator/
Business model: output/cross-domain/business-orchestrator/
Output: output/cross-domain/metrics-orchestrator/
Validation: Metrics system confirmed by human
Mode: AI->Human
Stage 7a: API Design (Parallel Branch - Backend)
Invoke api-design-orchestrator
Invoke: ${api-design-orchestrator}
Input:
PRD: output/cross-domain/design-orchestrator/
Output: output/cross-domain/api-design-orchestrator/
Validation: API contract confirmed by human
Mode: AI->Human
Stage 7b: Data Architecture -> Backend Architecture (Parallel Branch - Backend)
Invoke data-architecture-orchestrator
Invoke: ${data-architecture-orchestrator}
Input:
API contract: output/cross-domain/api-design-orchestrator/
PRD: output/cross-domain/design-orchestrator/
Output: output/cross-domain/data-architecture-orchestrator/
Validation: Data model review passed
Mode: AI->Human
Invoke backend-architecture-orchestrator
Invoke: ${backend-architecture-orchestrator}
Input:
API contract: output/cross-domain/api-design-orchestrator/
PRD: output/cross-domain/design-orchestrator/
Data model: output/cross-domain/data-architecture-orchestrator/
Output: output/cross-domain/backend-architecture-orchestrator/
Validation: Backend review passed (P0=0)
Mode: AI->Human
Stage 8: UI Development and Integration (Parallel Branch - UI)
Invoke ui-orchestrator
Invoke: ${ui-orchestrator}
Input:
mode: full (product launch scenario, requirements and design already confirmed by upstream design-orchestrator, skip exploration phase)
Brand guidelines: Brand guideline materials
Product positioning: output/cross-domain/positioning-orchestrator/
Target language: User provided (default zh-CN)
project_name: User provided
project_dir: User provided
framework: User provided (React/Vue/Svelte/Next.js/Nuxt.js)
PRD: output/cross-domain/design-orchestrator/
API contract: output/cross-domain/api-design-orchestrator/
Output: output/cross-domain/ui-orchestrator/ + code written to {project_dir}/
Validation: UI development and integration verification passed + project runnable (npm run dev successful) + project build successful (npm run build successful)
Mode: AI->Human
Stage 9: Quality -> Release -> Retrospective
Invoke release-orchestrator
Invoke: ${release-orchestrator}
Input:
Backend output: output/cross-domain/backend-architecture-orchestrator/
UI output: output/cross-domain/ui-orchestrator/
Metrics system: output/cross-domain/metrics-orchestrator/
Output: output/cross-domain/release-orchestrator/
Validation: P0 issues = 0, gradual rollout passed
Mode: AI->Human
Invoke monitoring-orchestrator
Invoke: ${monitoring-orchestrator}
Input:
Integration output: output/cross-domain/ui-orchestrator/
Metrics system: output/cross-domain/metrics-orchestrator/
Output: output/cross-domain/monitoring-orchestrator/
Validation: P0 issues = 0, P1 issues <= 3
Mode: AI->Human
Invoke iteration-orchestrator
Invoke: ${iteration-orchestrator}
Input:
Quality report: output/cross-domain/monitoring-orchestrator/
Integration output: output/cross-domain/ui-orchestrator/
Output: output/cross-domain/iteration-orchestrator/
Validation: Gradual rollout passed
Mode: AI->Human
Invoke agile-orchestrator
Invoke: ${agile-orchestrator}
Input:
Release artifacts: output/cross-domain/iteration-orchestrator/
Metrics system: output/cross-domain/metrics-orchestrator/
Output: output/cross-domain/agile-orchestrator/
Validation: Retrospective conclusions confirmed
Mode: AI->Human
Additional Dispatch (On-demand Trigger)
| Trigger Event | Dispatch Action |
|---|---|
| Need user research support | -> user-research-orchestrator (execute before insight-orchestrator) |
| Need opportunity validation | -> opportunity-orchestrator (execute before business-orchestrator) |
| Need hypothesis validation | -> validation-orchestrator (execute after design-orchestrator) |
| Need project management support | -> project-planning-orchestrator (throughout entire process) |
Stage Summary (post_pipeline)
Follow the stage summary protocol in orchestrator-protocol.md.
| Parameter | Value |
|---|---|
| Sub-skill output path | output/cross-domain/ |
| Summary output path | output/phase-reports/cross-domain/product-launch-orchestrator.md |
Downstream connections: primary: product-iteration-orchestrator (enter iteration optimization cycle after product launch) alternatives: - target: growth-orchestrator reason: Product has validated PMF, start scaled growth condition: When product has validated product-market fit and needs scaled growth - target: monitoring-orchestrator reason: Continuously monitor product operation metrics condition: When need to independently establish long-term monitoring system special_cases: []
Stage Gates
| Gate | Condition | Failure Handling |
|---|---|---|
| PM design completed | PRD generated and confirmed by human | Supplement product direction or requirement information |
| Parallel construction ready | API contract confirmed by human + UI development confirmed | Delay launch of affected branch |
| Both backend and UI ready | Backend and UI output files generated and non-empty | Wait for lagging party to complete |
| Quality gate passed | Quality acceptance output files generated and non-empty | Fix blocking issues and re-verify |
| Stage summary generated | output/phase-reports/cross-domain/product-launch-orchestrator.md generated and all 6 structural items non-empty | Supplement missing structural items and regenerate |
Human Decision Points
| Decision Point | Trigger Condition | Decision Content |
|---|---|---|
| PRD confirmation | design-orchestrator completed | Confirm PRD can be distributed to Backend and UI |
| API contract confirmation | api-design-orchestrator completed | Confirm API contract can be delivered to frontend |
| UI development confirmation | ui-orchestrator completed | Confirm UI development and integration verification passed |
| Frontend-backend conflict resolution | API contract conflicts with frontend needs | Decide whether to change API side or frontend side |
| Release decision | iteration-orchestrator gradual rollout completed | Confirm whether to do full rollout |
| Retrospective confirmation | agile-orchestrator completed | Confirm retrospective conclusions and action items |
Exception Handling
| Exception Type | Handling Strategy |
|---|---|
| Frequent PRD changes | Lock PRD version, changes go through change approval process, affected domains paused |
| API contract conflicts with frontend needs | Pause both sides, human adjudicates, winning side updates output |
| Design tokens incompatible with component library | Prioritize adjusting component library to adapt to tokens; tokens are the authoritative source |
| Backend development progress behind frontend | Frontend uses mock data to continue development, mark "pending integration" |
| Frontend development progress behind backend | Backend self-tests API first, provides Postman collection to frontend |
| Integration test environment unavailable | Degrade to local integration verification, mark "integration environment pending verification" |
| Parallel construction branch failure | Do not block the other branch; failed branch fixes and enters integration separately |
| Stage summary generation failed | Generate partial summary based on completed sub-skill outputs, mark missing items as "data missing", do not block orchestration completion |
Standalone Usage Input Acquisition Strategy
Standalone Trigger Scenario Identification
When this orchestrator is invoked directly (not through a parent orchestrator), it is considered a standalone trigger scenario. Typical trigger methods:
- User directly requests capabilities within this orchestrator's domain
- Triggered as an independent skill by external systems
- Parent orchestrator not executed, but user only needs this orchestrator's capability
Required Input Acquisition Strategy
| Required Input | Priority: Read from output/ | Fallback: Get from user conversation | Last Resort: AI knowledge base inference |
|---|---|---|---|
| PRD (prd.md) | Read output/pm-design/design-prd/prd.md | Ask user for PRD document or verbal requirements | Infer requirements from user description (low confidence, mark "PRD is AI-inferred") |
| project_dir | — | Ask user for project directory path | Cannot infer, user must provide |
Upstream Orchestrator Auto-Backtracking
When critical required inputs are missing, suggest user execute upstream orchestrators in the following priority:
| Missing Input | Suggested Upstream Orchestrator | Description |
|---|---|---|
| PRD | pm-design related orchestrator | PRD is the business basis for product-launch-orchestrator, missing will result in execution without business foundation |
| Sub-skill outputs | Sub-skill execution | Sub-skills (insight-orchestrator, api-design-orchestrator, release-orchestrator...) produce domain-specific outputs |
Backtracking suggestion output format:
Critical input missing detected, suggest executing upstream orchestrator first:
1. [Priority] pm-design related orchestrator -> Produces PRD
Continue with AI-inferred values? (Inferred values confidence <=0.3, outputs require additional human review)
Standalone Usage Gate
When triggered standalone, must pass the following additional checks before executing Pipeline:
| Gate Item | Check Content | Failure Handling |
|---|---|---|
| PRD existence | prd.md or equivalent requirements document available | Block execution, suggest user provide PRD |
| project_dir validity | User provided valid project directory path | Block execution, user must provide valid project_dir |
| Input confidence assessment | All required input acquisition methods determined, overall confidence >=0.5 | When confidence <0.5, force human confirmation whether to continue execution |
Gate execution order: PRD existence -> project_dir validity -> Input confidence assessment