Automated MVP Scope Definition
Core Principles
- MVP validates hypotheses, not solutions — The goal of MVP is learning, not delivery; obtain maximum confidence at minimum cost
- Must Have is the MVP baseline — Must Have features cannot be cut; Nice to Have features are all cuttable
- 2 weeks is the MVP time red line — An MVP exceeding 2 weeks is not an MVP, it's a complete product
- Validation results have only three outcomes — Validated / Invalidated / Need more data; ambiguous conclusions are not allowed
Basic Information
| Attribute | Value |
|---|---|
| Pipeline ID | 13 |
| Name | Automated MVP Scope Definition |
| Execution Mode | 🤖→👤 AI Suggests, Human Approves |
| Input | Solution Design + Assumption Map + Resource Constraints |
Interaction Mode
🤖→👤 AI Suggests, Human Approves
Input
| Input Item | Type | Required | Source | Description |
|---|---|---|---|---|
| Solution Design | JSON | Yes | output/pm-design/design-prototype / output/pm-design/design-userflow | Complete feature list and descriptions |
| Assumption Map | JSON | Yes | output/pm-design/validation-assumption-map/assumption_map.json | Assumption map output from Pipeline 12 |
| Resource Constraints | JSON | ○ | User provided | Time, staffing, budget limitations |
Input Format
{
"solution_design": {
"features": [
{
"id": "F001",
"name": "Feature name",
"description": "Feature description",
"effort_estimate": "Effort estimate"
}
]
},
"assumption_map": [...],
"resource_constraints": {
"timeline_weeks": 8,
"team_size": 4,
"budget": "Budget limit"
}
}
Execution Steps
Step 1: Core Hypothesis Extraction & Must Have Identification [Core]
Definition: Features directly related to the highest-risk assumptions = Must Include
Judgment Logic:
- Identify all assumptions where is_max_risk = true
- Extract core hypothesis list
- Identify features linked to these assumptions
- Mark as Must Have
Output Format:
{
"core_hypothesis": [
{
"id": "A001",
"description": "Hypothesis description",
"risk_score": 20
}
],
"must_have": [
{
"feature": "Feature name",
"linked_assumption": "Linked highest-risk assumption",
"effort_estimate": "Effort estimate",
"rationale": "Rationale for must include"
}
]
}
Step 2: Cut Feature Identification [Core]
Definition: Features that interfere with core hypothesis validation = Exclude
Exclusion Criteria:
| Exclusion Type | Description | Example |
|---|---|---|
| Over-featured | Complete functionality beyond MVP validation needs | MVP validation needs a list, but building full search + filter + sort |
| Over-polished | High-fidelity design not necessary for MVP | Investing significant time in interaction animations |
| Over-configured | Complex configuration options not necessary for validation | Multi-dimensional customization settings |
Output Format:
{
"cut_features": [
{
"feature": "Feature name",
"rationale": "Rationale for exclusion (interferes with core hypothesis validation)"
}
]
}
Step 3: Nice to Have Classification [Core]
Definition: Features that are neither Must Have nor cut features
Priority Rules:
- Features linked to high-risk assumptions but not directly related → P1
- Features linked to medium-risk assumptions → P2
- Features linked to low-risk assumptions → P3
Output Format:
{
"nice_to_have": [
{
"feature": "Feature name",
"priority": "P1/P2/P3",
"target_version": "v2.0/v3.0"
}
]
}
Step 4: MVP Size Assessment [Core]
Calculation Formula:
MVP Ratio = Must Have Effort / Full Solution Effort × 100%
Effort Unit: Person-days / person-weeks / story points (per team convention)
Assessment Criteria:
| MVP Ratio | Assessment | Recommendation |
|---|---|---|
| < 40% | ✅ Ideal | Ready to start MVP development |
| 40-60% | ⚠️ Acceptable | Review whether Nice to Have can be further simplified |
| > 60% | 🚨 Requires Review | Escalate to human judgment, confirm whether adjustment is needed |
Step 5: Timeline Planning [Core]
Definition: Create timeline planning based on MVP feature effort and resource constraints
Planning Logic:
- Sum up Must Have feature effort
- Combine with resource constraints timeline_weeks and team_size
- Ensure total weeks ≤ 2 (MVP time red line)
- Break down milestone checkpoints
Output Format:
{
"timeline": {
"total_weeks": 2,
"milestones": [
{
"name": "Milestone name",
"week": 1,
"deliverables": ["Deliverable 1", "Deliverable 2"]
}
]
}
}
Step 6: Resource Estimation [Core]
Definition: Estimate required resources based on MVP feature effort and timeline planning
Estimation Logic:
- Calculate staffing requirements based on Must Have feature effort
- Infer team configuration based on timeline.total_weeks
- Assess whether external resource support is needed
Output Format:
{
"resource_estimate": {
"team_size": 3,
"roles": [
{
"role": "Role name",
"count": 1,
"rationale": "Configuration rationale"
}
],
"external_dependencies": []
}
}
Step 7: Success Criteria & Risk Mitigation [Core]
Definition: Define MVP validation success criteria and identify risks with mitigation measures
Success Criteria Logic:
- Transform core hypotheses into quantifiable validation metrics
- Each core hypothesis must correspond to at least 1 success criterion
- Success criteria must be quantifiable (including specific values or thresholds)
Risk Mitigation Logic:
- Identify key risks during MVP execution
- Develop mitigation measures for each risk
- Assess risk impact level
Output Format:
{
"success_criteria": [
{
"criterion": "Success criterion description",
"metric": "Quantifiable metric",
"target_value": "Target value",
"linked_hypothesis": "Linked hypothesis ID"
}
],
"risk_mitigation": [
{
"risk": "Risk description",
"impact": "high/medium/low",
"mitigation": "Mitigation measure"
}
]
}
Step 8: Go/No-Go Decision Framework [Core]
Definition: Build Go/No-Go decision framework based on success criteria; metrics directly reference quantifiable metrics from success_criteria
Decision Logic:
- Extract key decision metrics from success_criteria (select 1 primary metric per core hypothesis)
- Define Go/No-Go thresholds for each metric (based on fluctuations around success_criteria.target_value)
- Include at least 2 metrics and corresponding thresholds
- Metrics do not redefine indicators; they reference success_criteria via linked_criterion
Output Format:
{
"go_no_go": {
"metrics": [
{
"name": "Metric name",
"linked_criterion": "Linked success_criteria index",
"description": "Metric description"
}
],
"thresholds": {
"go": "Go condition description",
"no_go": "No-Go condition description",
"needs_more_data": "Needs more data condition description"
}
}
}
Output Depth Levels
| Depth Level | Output Scope | Description |
|---|---|---|
| quick | MVP scope and validation plan | Core conclusions + minimum viable deliverables |
| standard | Complete deliverables (current default) | Complete deliverables, including all Step outputs |
| deep | Complete plan + MVP scope optimization + validation metrics system + iterative evolution roadmap | Complete deliverables + extended analysis + deep inference |
Output
Storage Path: output/pm-design/validation-mvp/
Output File: mvp_definition.json
{
"mvp_scope": {
"core_hypothesis": [
{ "id": "A001", "description": "Hypothesis description", "risk_score": 20 }
// ... same structure, extensible
],
"must_have": [
{ "feature": "Feature name", "linked_assumption": "Linked assumption ID", "effort_estimate": 8, "rationale": "Rationale for must include" }
// ... same structure, extensible
],
"nice_to_have": [
{ "feature": "Feature name", "priority": "P1", "target_version": "v2.0" }
// ... same structure, extensible
],
"cut_features": [
{ "feature": "Feature name", "rationale": "Exclusion rationale" }
// ... same structure, extensible
],
"timeline": { "total_weeks": 2, "milestones": [{ /* same as Step5 structure */ }] },
"resource_estimate": { "team_size": 3, "roles": [{ /* same as Step6 structure */ }], "external_dependencies": [] },
"success_criteria": [{ /* same as Step7 structure */ }],
"risk_mitigation": [{ /* same as Step7 structure */ }],
"effort_summary": { "mvp_total": 24, "full_solution_total": 60, "mvp_ratio": "40%" },
"go_no_go": { "metrics": [{ /* same as Step8 structure */ }], "thresholds": { "go": "...", "no_go": "...", "needs_more_data": "..." } }
},
"approval_status": "pending|approved|needs_discussion",
"recommendation": "AI recommendation description"
}
Output Validation Rules: See output validation rules section below
Decision Rules
| Rule | Condition | Action |
|---|---|---|
| Human approval trigger | MVP ratio > 60% | Escalate to human judgment |
| Approval trigger | Must Have has no linked assumption | Requires supplementary explanation |
| Approval trigger | cut_features rationale is insufficient | Requires supplementary exclusion basis |
Quality Checks
P0 Checks (must pass for quick/standard/deep)
- Core hypotheses (core_hypothesis is non-empty and linked to must_have)
- Assumption linkage (Must Have features all have assumption linkage)
P1 Checks (must pass for standard/deep)
- Exclusion rationale (cut_features all have sufficient rationale)
- Ratio calculation (MVP ratio calculated)
- Priority completeness (Nice to Have all have priorities)
- Time red line (timeline.total_weeks ≤ 2)
- Success criteria quantifiable (success_criteria includes quantifiable metrics and target values)
- Go/No-Go completeness (go_no_go includes at least 2 metrics and corresponding thresholds)
P2 Checks (only deep must pass)
- Extended analysis complete (deep inference and roadmap generated)
- Decision records complete (key decisions have rationale and alternatives)
Degradation Strategy
| Missing Upstream Input | Degradation Plan | Output Impact | Data Acquisition Instructions |
|---|---|---|---|
| Assumption map missing | User describes key assumptions, define MVP | Lacking structured assumption data, MVP scope may not be precise enough | Request user to provide key assumption list and validation priorities or upload assumption map file |
| Solution design data missing | User describes solution, define MVP | Lacking solution data, feature cuts may not be well-justified | Request user to provide feature solution description and core feature list or upload ideation output file |
| Resource constraint data missing | User describes resource constraints, define MVP | Lacking resource constraint data, timeline planning may not be well-justified | Request user to provide team size, available timeline, and tech stack resource constraint information |
| Assumption map + solution design + resource constraints all missing | User describes assumptions and solution, define MVP | Overall confidence reduced, MVP scope may not be complete | Request user to provide key assumptions, feature solution, and resource constraint descriptions |
| All upstream files missing | Prompt user to execute prior stages first, or define MVP based on user description | Output is only a basic MVP framework | Request user to provide core assumptions, minimum feature set, and resource constraints |
Output Validation Rules
| Field Path | Type | Required | Description |
|---|---|---|---|
| mvp_scope | object | Yes | MVP scope definition |
| mvp_scope.core_hypothesis | array | Yes | Core hypothesis list |
| mvp_scope.must_have | array | Yes | Must Have feature list |
| mvp_scope.nice_to_have | array | Yes | Nice to Have feature list |
| mvp_scope.cut_features | array | Yes | Cut feature list |
| mvp_scope.timeline | object | Yes | Timeline planning |
| mvp_scope.timeline.total_weeks | number | Yes | Total weeks (≤2) |
| mvp_scope.timeline.milestones | array | Yes | Milestone list |
| mvp_scope.resource_estimate | object | Yes | Resource estimation |
| mvp_scope.effort_summary | object | Yes | Effort summary |
| mvp_scope.effort_summary.mvp_total | number | Yes | MVP total effort |
| mvp_scope.effort_summary.full_solution_total | number | Yes | Full solution total effort |
| mvp_scope.effort_summary.mvp_ratio | string | Yes | MVP ratio |
| mvp_scope.success_criteria | array | Yes | Success criteria |
| mvp_scope.risk_mitigation | array | Yes | Risk mitigation measures |
| mvp_scope.go_no_go | object | Yes | Go/No-Go decision framework |
| mvp_scope.go_no_go.metrics | array | Yes | Decision metrics |
| mvp_scope.go_no_go.thresholds | object | Yes | Threshold definitions |
Upstream Change Response
Upstream Change Impact
| Upstream Change | Impact Scope | Response Strategy |
|---|---|---|
| Assumption map change (assumptions added/removed, risk score changes) | Core hypotheses, Must Have features | Annotate affected assumptions and features, recommend human confirmation on whether to redefine MVP |
| Solution design change | Feature list, cut decisions | Annotate affected features, recommend human confirmation on whether to adjust MVP scope |
| Resource constraint change | Timeline planning, resource estimation | Annotate affected timeline, recommend human confirmation on whether to adjust MVP scope |
| Experiment result update | Core hypothesis validation status | Annotate affected hypotheses, recommend human confirmation on whether to adjust MVP strategy |
Downstream Notification Mechanism
| MVP Scope Change Type | Notification Scope | Notification Method |
|---|---|---|
| Must Have feature addition/removal | validation-experiment, validation-usability | Mark feature change, trigger experiment design and usability test update |
| Timeline change | validation-experiment | Mark timeline change, trigger experiment cycle adjustment |
| Success criteria change | validation-experiment | Mark criteria change, trigger experiment metrics update |
| Go/No-Go decision change | All downstream Skills | Mark decision change, trigger full process update |
Usage Example
Highest-risk assumption in assumption map:
- A001: Users believe recommended content matches their interests (risk score: 20)
Features in solution design:
- F001: Intelligent recommendation algorithm
- F002: Recommendation result display
- F003: Bookmark feature
- F004: Share feature
- F005: High-fidelity animations
AI Analysis:
Core Hypothesis:
- A001: Users believe recommended content matches their interests (risk score: 20)
Must Have:
- F001 Intelligent recommendation algorithm (directly validates A001)
- F002 Recommendation result display (required to validate A001)
Cut Features:
- F005 High-fidelity animations (interferes with core validation, not necessary for MVP)
Nice to Have:
- F003 Bookmark feature (P2, v2.0)
- F004 Share feature (P3, v3.0)
Timeline Planning:
- Total 2 weeks, Week 1 complete core algorithm, Week 2 complete display and validation
Resource Estimation:
- 3 people: 1 backend + 1 frontend + 1 data
Success Criteria:
- Recommendation match rate ≥ 60% (linked to A001)
Risk Mitigation:
- Insufficient algorithm accuracy (high) → Degrade to rule-based recommendations
Go/No-Go:
- metrics: Recommendation match rate, user click-through rate
- Go: Match rate ≥ 60% and click-through rate ≥ 30%
- No-Go: Match rate < 40% or click-through rate < 15%
MVP Ratio: 40% ✅ Ideal