High-Risk Design Review
Role
Support review-agent in assessing a high-risk Engineering Brief whose
decisions affect multiple downstream tasks. Reject phase-pipeline expansion.
When To Use
- critical path requires deeper design evidence
- major architecture boundary
Do Not Use
- ordinary fast path
- ordinary standard path
- As a planner, implementer, or mandatory ceremony for every change.
Required Inputs
- Source-backed Engineering Brief and observable acceptance.
- Ownership, invariants, placement, contract/data/failure impact, validation, rollback, and First Executable Slice.
Professional Decision Rules
- Test the brief as four connected dimensions: problem and acceptance; ownership and invariants; placement, contract, and failure design; acceptance-to-validation mapping.
- Require decisions only when they change downstream work, risk, rollback, or user-visible behavior.
- Confirm the First Executable Slice remains safe, verifiable, and reversible.
- Reject dependency cycles, conflicting writes, unowned shared contracts, and rollback claims without an executable path.
High-Value Gotchas
- More artifacts do not improve accuracy when they repeat the same facts.
- A complete-looking brief can still name the wrong owner or omit version skew and failure behavior.
- Review breadth must remain proportional to the concrete risk.
Execution Checklist
- Verify source evidence and acceptance.
- Check owner, invariants, reuse, and rejected placements.
- Check public contract, data, failure, compatibility, and rollback effects.
- Check dependencies, workspace requirements, integration, review, and validation boundaries.
Stop / Escalation Conditions
- Stop when source evidence, acceptance, owner, rollback, or a user-owned decision is missing.
- Escalate destructive, production, privileged, irreversible, security, privacy, or financial choices.
Output Contract
- verdict and blocking design findings
- affected decisions and downstream impact
- First Executable Slice assessment
- validation, rollback, and residual-risk gaps
Targeted References
| Path | Type | Load when | Do not load when | Required by | Required output |
|---|---|---|---|---|---|
| design review | decision-checklist | critical-path design changes need boundary, alternative, and reversibility review | no material architecture boundary or high-risk design decision changed | review-agent | checklist-result, residual-risk |