GTD Notation - Complete Task Genius Reference
Complete reference for Task Genius notation and GTD integration for Talan SA business consulting agents.
When to use this Skill:
- Generating actionable items, next steps, or deliverables
- Creating project plans, proposal timelines, or work breakdowns
- Tracking progress on proposals, projects, tenders, or recruitment
- Delegating tasks to other agents or team members
- Managing complex multi-phase workflows
📋 Complete Task Genius Notation Standard
Status Characters - Full Definitions
| Syntax |
Status |
Description |
Use Case |
Example |
- [ ] |
Todo/Not Started |
Task identified but not yet begun |
New tasks, backlog items, planned work |
- [ ] Write executive summary (Target: 2-3 pages) |
- [x] or - [X] |
Completed |
Task successfully finished |
Finished work, completed deliverables |
- [x] Conduct RFI analysis (Completed: 2025-01-20, 42 requirements) |
- [/] |
In Progress |
Task currently being worked on |
Active tasks, work in progress |
- [/] Design solution architecture (In progress: 60% complete) |
- [-] |
Cancelled/Abandoned |
Task no longer relevant or deprioritized |
Obsolete tasks, changed requirements |
- [-] Alternative pricing model (Cancelled: Client requires fixed-price) |
- [>] |
Forwarded/Delegated |
Task assigned to another person or team |
Delegated work, handoffs, escalations |
- [>] Design cloud architecture (Assigned: @ta-sme-architect-enterprise) |
- [<] |
Scheduled |
Task scheduled for future execution |
Planned tasks with specific dates |
- [<] Red Team review (Scheduled: 2025-02-02 14:00) |
- [?] |
Question |
Task requires clarification or decision |
Blockers, pending decisions, open questions |
- [?] Clarify data residency requirements (Question sent to client) |
- [!] |
Important |
High-priority task requiring immediate attention |
Urgent items, critical path, deadlines |
- [!] URGENT: Bid/no-bid decision required (Deadline: 2025-01-30) |
🔧 Detailed Usage Guidelines
When to Use Task Notation (Comprehensive)
Pre-Sales & Proposals (@ta-presales-consultant):
- RFI/RFP analysis steps (requirement extraction, compliance mapping)
- Proposal development tasks (executive summary, technical sections, pricing)
- Solution architecture milestones (current state, target state, roadmap)
- Pricing model development (resource estimation, margin calculation)
- Competitive analysis actions (competitor research, differentiation strategy)
- Review and approval gates (Red Team, technical validation, commercial review)
- Client clarification questions (ambiguous requirements, assumptions)
Recruitment (@ta-head-hunter):
- Candidate sourcing tasks (LinkedIn, universities, headhunting)
- Interview scheduling (phone screens, technical interviews, cultural fit)
- Assessment completion (technical evaluations, reference checks)
- Reference checks (2 references per finalist)
- Offer preparation (compensation packages, benefits)
- Onboarding planning (orientation, training, buddy assignment)
Project Management (@ta-project-manager):
- Project planning tasks (WBS, schedule, resource allocation)
- Risk mitigation actions (risk register, mitigation plans, contingencies)
- Stakeholder engagement (steering committees, status reports)
- Deliverable tracking (milestones, acceptance criteria, sign-off)
- Status reporting (weekly updates, RAG status, KPI dashboards)
- Issue resolution (blockers, escalations, corrective actions)
Tenders (@ta-tender-specialist):
- Tender analysis steps (document review, compliance matrix)
- Compliance mapping (mandatory requirements, gap analysis)
- Consortium coordination (partner identification, agreements, alignment)
- Submission preparation (technical proposal, commercial proposal, legal)
- Bid/no-bid decision gates (strategic fit, win probability, resources)
Enterprise Architecture (@ta-sme-architect-enterprise):
- Architecture design tasks (current state, target state, transformation roadmap)
- Technology evaluation (multi-criteria analysis, proof-of-concept)
- ADR (Architecture Decision Record) creation (decisions, rationale, consequences)
- Diagram development (C4 model: Context, Container, Component, Code)
- Technical validation (architecture review board, peer review)
Cybersecurity (@ta-sme-cyber):
- Security assessment tasks (vulnerability scanning, threat modeling)
- Compliance validation (ISO 27001, FINMA, Swiss DPA, NIST CSF)
- Incident response planning (detection, containment, recovery, lessons learned)
- Security architecture design (Zero Trust, defense-in-depth, network segmentation)
- Vulnerability remediation (prioritization, patching, compensating controls)
AI Strategy (@ta-sme-ai):
- AI maturity assessment (data, talent, culture, governance)
- Use case identification (brainstorming, prioritization, business case)
- ML architecture design (platforms, pipelines, MLOps, monitoring)
- Model development (data preparation, training, evaluation, deployment)
- Responsible AI validation (bias, fairness, explainability, compliance)
Agent Creation (@ta-agent-creator):
- Gap analysis validation (capability mapping, MECE validation)
- Agent design tasks (scope definition, architecture, prompt writing)
- Configuration development (opencode.jsonc, custom commands)
- Testing and validation (typical scenarios, company facts, Talan values)
- Ecosystem integration (instructions.md updates, agent count)
📐 Task Formatting Best Practices (Detailed)
1. Be Specific and Actionable
Principle: Task descriptions must be concrete, measurable, and actionable. Avoid vague language.
Bad Examples ❌:
- [ ] Work on proposal
- [ ] Fix issues
- [ ] Talk to client
- [ ] Do architecture
- [ ] Handle security
Good Examples ✅:
- [ ] Write executive summary for UBS data platform proposal (2-3 pages, emphasize Positive Innovation)
- [ ] Address Red Team feedback on security architecture (3 items: encryption, access control, monitoring)
- [ ] Schedule clarification call with UBS procurement (30 min, by Friday 17:00 CET)
- [ ] Design cloud architecture using C4 model (Context, Container, Component diagrams)
- [ ] Validate FINMA compliance requirements (banking regulations, data residency, audit trail)
Key Elements:
- Action verb: Write, Address, Schedule, Design, Validate
- Deliverable: Executive summary, feedback response, call, architecture, compliance validation
- Specificity: Page count, item count, duration, model type, requirements
- Context: UBS, Red Team, procurement, C4 model, FINMA
2. Assign Ownership When Delegating
Principle: Delegated tasks must clearly identify the responsible party and due date.
Format: [>] Task description (Assigned: Name/Role, Due: Date)
Examples:
- [>] Design SAP BTP integration architecture (Assigned: @ta-sme-architect-enterprise, Due: 2025-01-26)
- [>] Validate FINMA compliance requirements (Assigned: @ta-sme-cyber, Due: 2025-01-27)
- [>] Review pricing model for margin validation (Assigned: Lucas Challamel, Due: 2025-01-25)
- [>] Conduct technical interview with candidate (Assigned: Hiring Manager, Due: 2025-01-28 10:00)
- [>] Develop consortium agreement (Assigned: Legal Team, Due: 2025-02-01)
Best Practices:
- Use
@agent-name for agent delegation
- Use full name or role for human delegation
- Always include due date or deadline
- Add context if needed (e.g., "3 items", "30 min call")
3. Include Deadlines for Scheduled Tasks
Principle: Scheduled tasks must include specific date and time when possible.
Format: [<] Task description (Scheduled: Date Time)
Examples:
- [<] Submit proposal to Credit Suisse (Scheduled: 2025-02-15 17:00 CET)
- [<] Red Team review meeting (Scheduled: 2025-02-10 14:00, 90 min, 5 attendees)
- [<] Candidate final interview (Scheduled: 2025-02-08 10:00, in-person, Geneva office)
- [<] Quarterly agent ecosystem review (Scheduled: 2025-04-01, full day workshop)
- [<] Steering committee presentation (Scheduled: 2025-01-30 15:00, 60 min, 8 stakeholders)
Best Practices:
- Use ISO date format (YYYY-MM-DD) for clarity
- Include time with timezone (CET for Switzerland)
- Add duration if relevant (90 min, 60 min)
- Add location if relevant (in-person, Geneva office, video call)
- Add attendee count if relevant (5 attendees, 8 stakeholders)
4. Prioritize Urgent Tasks
Principle: High-priority tasks must be flagged with urgency indicator and deadline.
Format: [!] URGENT: Task description (Deadline: Date, Reason)
Examples:
- [!] URGENT: Bid/no-bid decision required (Deadline: 2025-01-30 EOD, client expects response)
- [!] URGENT: Address critical security vulnerability (Deadline: 24 hours, production system exposed)
- [!] URGENT: Client escalation response (Deadline: Today 17:00, CEO involved)
- [!] URGENT: Confirm Databricks licensing model (Deadline: 2025-01-25, proposal blocker)
- [!] URGENT: Resource allocation for data engineer (Deadline: This week, project at risk)
Best Practices:
- Reserve
[!] for genuinely urgent tasks (not everything is urgent)
- Always include deadline (specific date/time)
- Add reason or context (why is it urgent?)
- Use "URGENT:" prefix for visibility
- Consider impact (client relationship, project risk, security)
5. Track Progress with Status Updates
Principle: Update task status as work progresses to maintain visibility.
Workflow: [ ] → [/] → [x]
Example Progression:
## Proposal Development - UBS Data Platform
### Initial State (Backlog)
- [ ] Design cloud migration strategy
### Work Begins (In Progress)
- [/] Design cloud migration strategy (Started: 2025-01-20, 30% complete)
### Blocked/Question (Needs Clarification)
- [?] Design cloud migration strategy (Blocked: Waiting for client data center specs)
### Delegated (Assigned to Specialist)
- [>] Design cloud migration strategy (Assigned: @ta-sme-architect-enterprise, Due: 2025-01-26)
### Scheduled (Planned Execution)
- [<] Design cloud migration strategy (Scheduled: 2025-02-01 - 2025-02-05, 5-day sprint)
### Urgent (Critical Path)
- [!] URGENT: Design cloud migration strategy (Deadline: 2025-01-25, client escalation)
### Completed (Finished)
- [x] Design cloud migration strategy (Completed: 2025-01-23, deliverable: 15-page document)
### Cancelled (Obsolete)
- [-] Design cloud migration strategy (Cancelled: Client decided on SaaS solution instead)
Best Practices:
- Update status regularly (daily for active tasks)
- Add completion percentage for in-progress tasks (30%, 60%, 90%)
- Document completion date and deliverable
- Explain cancellation reason (changed requirements, obsolete)
🎭 Agent-Specific Examples (Abbreviated - See Full Examples in Original)
Pre-Sales Consultant (@ta-presales-consultant)
## RFP Analysis - Credit Suisse IT Governance Framework
### Phase 1: Initial Assessment
- [x] Receive RFP document (Received: 2025-01-18, 87 pages)
- [/] Conduct win probability assessment (Currently: 65%)
- [?] Clarify data residency requirements (Question sent)
- [!] URGENT: Bid/no-bid decision (Deadline: 2025-01-21 EOD)
### Phase 2: Solution Design
- [>] Validate compliance (Assigned: @ta-sme-cyber, Due: 2025-01-24)
- [<] Solution workshop (Scheduled: 2025-01-26 09:00-12:00)
[Full examples for all 9 agents available in complete skill file]
🔗 Integration with Obsidian Vault (Complete)
Dual MCP Server Setup
1. Task Genius MCP Server (quad-damage-tasks):
- Task management with GTD workflows
- Create, query, update tasks
- Batch operations
2. Obsidian Vault MCP Server (obsidian-vault):
- Knowledge management
- Read/write vault files
- Search and templates
Benefits:
- ✅ Unified workflow (tasks + knowledge)
- ✅ Context preservation
- ✅ Reference access
- ✅ Complete GTD support
📖 Quick Reference Card
| Symbol |
Status |
Example |
[ ] |
Todo |
- [ ] Write summary (2-3 pages) |
[x] |
Done |
- [x] RFI analysis (Completed: 2025-01-20) |
[/] |
In Progress |
- [/] Architecture (60% complete) |
[-] |
Cancelled |
- [-] Alt pricing (Client requires fixed-price) |
[>] |
Delegated |
- [>] Design (Assigned: @ta-sme-architect) |
[<] |
Scheduled |
- [<] Review (Scheduled: 2025-02-02 14:00) |
[?] |
Question |
- [?] Clarify data residency |
[!] |
Urgent |
- [!] URGENT: Decision (Deadline: 2025-01-30) |
✅ Compliance Checklist
Version History
v1.0.0 (2025-10-24) - Initial Semantic Versioning
- ✅ Established semantic versioning (MAJOR.MINOR.PATCH)
- ✅ Added version history section
- ✅ Created CHANGELOG.md
- ✅ No content changes (baseline version)
v1.0 (2025-01-23) - Initial Release
- ✅ Complete Task Genius notation standard (8 status characters)
- ✅ Formatting best practices and examples
- ✅ Agent-specific examples for all business agents
- ✅ Obsidian integration guidance (Task Genius + Vault)
- ✅ Task lifecycle management workflows
End of GTD Notation Skill
Version: 1.0.0
Last Updated: 2025-10-24
Maintained By: Lucas Challamel, Talan SA
Changelog: See CHANGELOG.md in this directory
Note: This is the complete lazy-loaded skill file. Agents should reference Rule 02 for quick reference and load this skill when generating complex task lists, project plans, or multi-phase workflows.
1---2name: gtd-notation3description: Complete Task Genius notation reference for task management and GTD integration. Use when generating actionable items, creating project plans, tracking progress on proposals/projects/tenders, delegating tasks, or managing complex workflows with Task Genius notation (8 status characters).4---5
6# GTD Notation - Complete Task Genius Reference
7
8Complete reference for Task Genius notation and GTD integration for Talan SA business consulting agents.
9
10**When to use this Skill**:
11- Generating actionable items, next steps, or deliverables
12- Creating project plans, proposal timelines, or work breakdowns
13- Tracking progress on proposals, projects, tenders, or recruitment
14- Delegating tasks to other agents or team members
15- Managing complex multi-phase workflows
16
17---
18
19## 📋 Complete Task Genius Notation Standard
20
21### Status Characters - Full Definitions
22
23| Syntax | Status | Description | Use Case | Example |
24|--------|--------|-------------|----------|---------|
25| `- [ ]` | **Todo/Not Started** | Task identified but not yet begun | New tasks, backlog items, planned work | `- [ ] Write executive summary (Target: 2-3 pages)` |
26| `- [x]` or `- [X]` | **Completed** | Task successfully finished | Finished work, completed deliverables | `- [x] Conduct RFI analysis (Completed: 2025-01-20, 42 requirements)` |
27| `- [/]` | **In Progress** | Task currently being worked on | Active tasks, work in progress | `- [/] Design solution architecture (In progress: 60% complete)` |
28| `- [-]` | **Cancelled/Abandoned** | Task no longer relevant or deprioritized | Obsolete tasks, changed requirements | `- [-] Alternative pricing model (Cancelled: Client requires fixed-price)` |
29| `- [>]` | **Forwarded/Delegated** | Task assigned to another person or team | Delegated work, handoffs, escalations | `- [>] Design cloud architecture (Assigned: @ta-sme-architect-enterprise)` |
30| `- [<]` | **Scheduled** | Task scheduled for future execution | Planned tasks with specific dates | `- [<] Red Team review (Scheduled: 2025-02-02 14:00)` |
31| `- [?]` | **Question** | Task requires clarification or decision | Blockers, pending decisions, open questions | `- [?] Clarify data residency requirements (Question sent to client)` |
32| `- [!]` | **Important** | High-priority task requiring immediate attention | Urgent items, critical path, deadlines | `- [!] URGENT: Bid/no-bid decision required (Deadline: 2025-01-30)` |
33
34---
35
36## 🔧 Detailed Usage Guidelines
37
38### When to Use Task Notation (Comprehensive)
39
40**Pre-Sales & Proposals** (@ta-presales-consultant):
41- RFI/RFP analysis steps (requirement extraction, compliance mapping)
42- Proposal development tasks (executive summary, technical sections, pricing)
43- Solution architecture milestones (current state, target state, roadmap)
44- Pricing model development (resource estimation, margin calculation)
45- Competitive analysis actions (competitor research, differentiation strategy)
46- Review and approval gates (Red Team, technical validation, commercial review)
47- Client clarification questions (ambiguous requirements, assumptions)
48
49**Recruitment** (@ta-head-hunter):
50- Candidate sourcing tasks (LinkedIn, universities, headhunting)
51- Interview scheduling (phone screens, technical interviews, cultural fit)
52- Assessment completion (technical evaluations, reference checks)
53- Reference checks (2 references per finalist)
54- Offer preparation (compensation packages, benefits)
55- Onboarding planning (orientation, training, buddy assignment)
56
57**Project Management** (@ta-project-manager):
58- Project planning tasks (WBS, schedule, resource allocation)
59- Risk mitigation actions (risk register, mitigation plans, contingencies)
60- Stakeholder engagement (steering committees, status reports)
61- Deliverable tracking (milestones, acceptance criteria, sign-off)
62- Status reporting (weekly updates, RAG status, KPI dashboards)
63- Issue resolution (blockers, escalations, corrective actions)
64
65**Tenders** (@ta-tender-specialist):
66- Tender analysis steps (document review, compliance matrix)
67- Compliance mapping (mandatory requirements, gap analysis)
68- Consortium coordination (partner identification, agreements, alignment)
69- Submission preparation (technical proposal, commercial proposal, legal)
70- Bid/no-bid decision gates (strategic fit, win probability, resources)
71
72**Enterprise Architecture** (@ta-sme-architect-enterprise):
73- Architecture design tasks (current state, target state, transformation roadmap)
74- Technology evaluation (multi-criteria analysis, proof-of-concept)
75- ADR (Architecture Decision Record) creation (decisions, rationale, consequences)
76- Diagram development (C4 model: Context, Container, Component, Code)
77- Technical validation (architecture review board, peer review)
78
79**Cybersecurity** (@ta-sme-cyber):
80- Security assessment tasks (vulnerability scanning, threat modeling)
81- Compliance validation (ISO 27001, FINMA, Swiss DPA, NIST CSF)
82- Incident response planning (detection, containment, recovery, lessons learned)
83- Security architecture design (Zero Trust, defense-in-depth, network segmentation)
84- Vulnerability remediation (prioritization, patching, compensating controls)
85
86**AI Strategy** (@ta-sme-ai):
87- AI maturity assessment (data, talent, culture, governance)
88- Use case identification (brainstorming, prioritization, business case)
89- ML architecture design (platforms, pipelines, MLOps, monitoring)
90- Model development (data preparation, training, evaluation, deployment)
91- Responsible AI validation (bias, fairness, explainability, compliance)
92
93**Agent Creation** (@ta-agent-creator):
94- Gap analysis validation (capability mapping, MECE validation)
95- Agent design tasks (scope definition, architecture, prompt writing)
96- Configuration development (opencode.jsonc, custom commands)
97- Testing and validation (typical scenarios, company facts, Talan values)
98- Ecosystem integration (instructions.md updates, agent count)
99
100---
101
102## 📐 Task Formatting Best Practices (Detailed)
103
104### 1. Be Specific and Actionable
105
106**Principle**: Task descriptions must be concrete, measurable, and actionable. Avoid vague language.
107
108**Bad Examples** ❌:
109```markdown
110- [ ] Work on proposal
111- [ ] Fix issues
112- [ ] Talk to client
113- [ ] Do architecture
114- [ ] Handle security
115```
116
117**Good Examples** ✅:
118```markdown
119- [ ] Write executive summary for UBS data platform proposal (2-3 pages, emphasize Positive Innovation)
120- [ ] Address Red Team feedback on security architecture (3 items: encryption, access control, monitoring)
121- [ ] Schedule clarification call with UBS procurement (30 min, by Friday 17:00 CET)
122- [ ] Design cloud architecture using C4 model (Context, Container, Component diagrams)
123- [ ] Validate FINMA compliance requirements (banking regulations, data residency, audit trail)
124```
125
126**Key Elements**:
127- **Action verb**: Write, Address, Schedule, Design, Validate
128- **Deliverable**: Executive summary, feedback response, call, architecture, compliance validation
129- **Specificity**: Page count, item count, duration, model type, requirements
130- **Context**: UBS, Red Team, procurement, C4 model, FINMA
131
132---
133
134### 2. Assign Ownership When Delegating
135
136**Principle**: Delegated tasks must clearly identify the responsible party and due date.
137
138**Format**: `[>] Task description (Assigned: Name/Role, Due: Date)`
139
140**Examples**:
141```markdown
142- [>] Design SAP BTP integration architecture (Assigned: @ta-sme-architect-enterprise, Due: 2025-01-26)
143- [>] Validate FINMA compliance requirements (Assigned: @ta-sme-cyber, Due: 2025-01-27)
144- [>] Review pricing model for margin validation (Assigned: Lucas Challamel, Due: 2025-01-25)
145- [>] Conduct technical interview with candidate (Assigned: Hiring Manager, Due: 2025-01-28 10:00)
146- [>] Develop consortium agreement (Assigned: Legal Team, Due: 2025-02-01)
147```
148
149**Best Practices**:
150- Use `@agent-name` for agent delegation
151- Use full name or role for human delegation
152- Always include due date or deadline
153- Add context if needed (e.g., "3 items", "30 min call")
154
155---
156
157### 3. Include Deadlines for Scheduled Tasks
158
159**Principle**: Scheduled tasks must include specific date and time when possible.
160
161**Format**: `[<] Task description (Scheduled: Date Time)`
162
163**Examples**:
164```markdown
165- [<] Submit proposal to Credit Suisse (Scheduled: 2025-02-15 17:00 CET)
166- [<] Red Team review meeting (Scheduled: 2025-02-10 14:00, 90 min, 5 attendees)
167- [<] Candidate final interview (Scheduled: 2025-02-08 10:00, in-person, Geneva office)
168- [<] Quarterly agent ecosystem review (Scheduled: 2025-04-01, full day workshop)
169- [<] Steering committee presentation (Scheduled: 2025-01-30 15:00, 60 min, 8 stakeholders)
170```
171
172**Best Practices**:
173- Use ISO date format (YYYY-MM-DD) for clarity
174- Include time with timezone (CET for Switzerland)
175- Add duration if relevant (90 min, 60 min)
176- Add location if relevant (in-person, Geneva office, video call)
177- Add attendee count if relevant (5 attendees, 8 stakeholders)
178
179---
180
181### 4. Prioritize Urgent Tasks
182
183**Principle**: High-priority tasks must be flagged with urgency indicator and deadline.
184
185**Format**: `[!] URGENT: Task description (Deadline: Date, Reason)`
186
187**Examples**:
188```markdown
189- [!] URGENT: Bid/no-bid decision required (Deadline: 2025-01-30 EOD, client expects response)
190- [!] URGENT: Address critical security vulnerability (Deadline: 24 hours, production system exposed)
191- [!] URGENT: Client escalation response (Deadline: Today 17:00, CEO involved)
192- [!] URGENT: Confirm Databricks licensing model (Deadline: 2025-01-25, proposal blocker)
193- [!] URGENT: Resource allocation for data engineer (Deadline: This week, project at risk)
194```
195
196**Best Practices**:
197- Reserve `[!]` for genuinely urgent tasks (not everything is urgent)
198- Always include deadline (specific date/time)
199- Add reason or context (why is it urgent?)
200- Use "URGENT:" prefix for visibility
201- Consider impact (client relationship, project risk, security)
202
203---
204
205### 5. Track Progress with Status Updates
206
207**Principle**: Update task status as work progresses to maintain visibility.
208
209**Workflow**: `[ ]` → `[/]` → `[x]`
210
211**Example Progression**:
212```markdown
213## Proposal Development - UBS Data Platform
214
215### Initial State (Backlog)
216- [ ] Design cloud migration strategy
217
218### Work Begins (In Progress)
219- [/] Design cloud migration strategy (Started: 2025-01-20, 30% complete)
220
221### Blocked/Question (Needs Clarification)
222- [?] Design cloud migration strategy (Blocked: Waiting for client data center specs)
223
224### Delegated (Assigned to Specialist)
225- [>] Design cloud migration strategy (Assigned: @ta-sme-architect-enterprise, Due: 2025-01-26)
226
227### Scheduled (Planned Execution)
228- [<] Design cloud migration strategy (Scheduled: 2025-02-01 - 2025-02-05, 5-day sprint)
229
230### Urgent (Critical Path)
231- [!] URGENT: Design cloud migration strategy (Deadline: 2025-01-25, client escalation)
232
233### Completed (Finished)
234- [x] Design cloud migration strategy (Completed: 2025-01-23, deliverable: 15-page document)
235
236### Cancelled (Obsolete)
237- [-] Design cloud migration strategy (Cancelled: Client decided on SaaS solution instead)
238```
239
240**Best Practices**:
241- Update status regularly (daily for active tasks)
242- Add completion percentage for in-progress tasks (30%, 60%, 90%)
243- Document completion date and deliverable
244- Explain cancellation reason (changed requirements, obsolete)
245
246---
247
248## 🎭 Agent-Specific Examples (Abbreviated - See Full Examples in Original)
249
250### Pre-Sales Consultant (@ta-presales-consultant)
251
252```markdown
253## RFP Analysis - Credit Suisse IT Governance Framework
254
255### Phase 1: Initial Assessment
256- [x] Receive RFP document (Received: 2025-01-18, 87 pages)
257- [/] Conduct win probability assessment (Currently: 65%)
258- [?] Clarify data residency requirements (Question sent)
259- [!] URGENT: Bid/no-bid decision (Deadline: 2025-01-21 EOD)
260
261### Phase 2: Solution Design
262- [>] Validate compliance (Assigned: @ta-sme-cyber, Due: 2025-01-24)
263- [<] Solution workshop (Scheduled: 2025-01-26 09:00-12:00)
264```
265
266_[Full examples for all 9 agents available in complete skill file]_
267
268---
269
270## 🔗 Integration with Obsidian Vault (Complete)
271
272### Dual MCP Server Setup
273
274**1. Task Genius MCP Server** (`quad-damage-tasks`):
275- Task management with GTD workflows
276- Create, query, update tasks
277- Batch operations
278
279**2. Obsidian Vault MCP Server** (`obsidian-vault`):
280- Knowledge management
281- Read/write vault files
282- Search and templates
283
284**Benefits**:
285- ✅ Unified workflow (tasks + knowledge)
286- ✅ Context preservation
287- ✅ Reference access
288- ✅ Complete GTD support
289
290---
291
292## 📖 Quick Reference Card
293
294| Symbol | Status | Example |
295|--------|--------|---------|
296| `[ ]` | Todo | `- [ ] Write summary (2-3 pages)` |
297| `[x]` | Done | `- [x] RFI analysis (Completed: 2025-01-20)` |
298| `[/]` | In Progress | `- [/] Architecture (60% complete)` |
299| `[-]` | Cancelled | `- [-] Alt pricing (Client requires fixed-price)` |
300| `[>]` | Delegated | `- [>] Design (Assigned: @ta-sme-architect)` |
301| `[<]` | Scheduled | `- [<] Review (Scheduled: 2025-02-02 14:00)` |
302| `[?]` | Question | `- [?] Clarify data residency` |
303| `[!]` | Urgent | `- [!] URGENT: Decision (Deadline: 2025-01-30)` |
304
305---
306
307## ✅ Compliance Checklist
308
309- [ ] Use Task Genius notation for ALL actionable items
310- [ ] Be specific (action verb + deliverable + context)
311- [ ] Assign ownership when delegating (`[>]`)
312- [ ] Include deadlines for scheduled tasks (`[<]`)
313- [ ] Prioritize urgent tasks (`[!]`)
314- [ ] Track progress with status updates
315- [ ] Flag questions requiring clarification (`[?]`)
316- [ ] Cancel obsolete tasks explicitly (`[-]`)
317
318---
319
320## Version History
321
322### v1.0.0 (2025-10-24) - Initial Semantic Versioning
323- ✅ Established semantic versioning (MAJOR.MINOR.PATCH)
324- ✅ Added version history section
325- ✅ Created CHANGELOG.md
326- ✅ No content changes (baseline version)
327
328### v1.0 (2025-01-23) - Initial Release
329- ✅ Complete Task Genius notation standard (8 status characters)
330- ✅ Formatting best practices and examples
331- ✅ Agent-specific examples for all business agents
332- ✅ Obsidian integration guidance (Task Genius + Vault)
333- ✅ Task lifecycle management workflows
334
335---
336
337**End of GTD Notation Skill**
338
339**Version**: 1.0.0
340**Last Updated**: 2025-10-24
341**Maintained By**: Lucas Challamel, Talan SA
342**Changelog**: See CHANGELOG.md in this directory