Hedgehog Loop
The operating loop for a bootstrapped Hedgehog project: hedgehog next
emits the packet for one ready layer, build it, hedgehog verify gates
and commits it. The build graph (.hedgehog/hedgehog.db) is the live
list — query it via hedgehog status/hedgehog next, never re-derive
state from prose. The step tables below mirror
src/golden-cores/full-stack-app/core.yaml, already the source of truth
for layer order, scope, and verify command per layer — read the tables
for the human-readable shape, trust the YAML (and the packet hedgehog next emits from it) as the authoritative one if they ever seem to
disagree.
Determine phase
Before touching code, know which phase applies to the module in scope:
- Phase A — building/extending the backend. Every module in scope needs schema → contract → repository → service → controller before Phase B starts for any of them.
- Phase B — Phase A is closed for the module. Build hooks and screens.
Check hedgehog status (or hedgehog why <path> for a specific file),
or the commit log for feat(<module>): api commits. No such commit (and
no controller task complete for that module) means the module is in
Phase A.
The Domain Module Pattern
A domain module = one table. users, orders, order_items are each
their own module, carrying the full step sequence below. The schema is the
source of truth for module boundaries.
Cross-module references are FK-by-ID only. If orders.user_id
references users, the orders schema holds a plain FK column. The
orders repository and service depend only on their own ports — a service
knows related entities only as an ID.
- Need the related row? Resolve it at the contract/controller layer (parallel calls to each module's own endpoint), or join against the other module's schema directly inside the repository (Drizzle query).
- This keeps every service importing only its own ports, so the Nx rule
type:service → onlyDependOnLibsWithTags: ['type:port', 'type:util']holds uniformly (wired at bootstrap).
A junction table (e.g. order_items) is one table, one module, with two
FK-by-ID columns instead of one, each resolved the same way.
Every module goes through the same shape, in order:
schema (Drizzle) — types before data
contract (Zod / ts-rest) — the boundary
repository (port + Drizzle adapter)
service (domain logic) — imports only ports
controller (thin HTTP)
hook (TanStack Query) — Phase B only
Plus, when an operation needs async and the Queue add-on is on for this
project (check .hedgehog/addons.yaml's queue.on): queue = port +
BullMQ adapter, same port/adapter shape as the repository. The service
imports only ports. Queue is one-time project infra, not a compiled
layer — full-stack-app/core.yaml has no queue layer, so this step has
no hedgehog verify gate of its own; build it as part of the
controller layer's packet, verified by that layer's own check. If the
Queue add-on is off, there's no apps/worker and no queue step, full
stop — an operation that seems to want async processing on a Queue-off
project is a signal to revisit that add-on decision with planner, not
to build a one-off queue outside the add-on's scaffolding.
Standard Nx generators (@nx/nest, @nx/next, @nx/expo, @nx/js)
scaffold the app/lib shell. Each step's actual content (schema, contract,
repository, service, controller, hook) is hand-built, following this
sequence.
Domain Module — Backend Steps (Phase A, every module in scope)
A horizontal pass across the whole backend — every module goes through
these before any module gets a hook or screen. Each row is one compiled
layer in full-stack-app/core.yaml; delegate each module's Phase A
layers to the backend-eng agent, one hedgehog next packet at a time —
it builds the layer, hedgehog verify gates and commits it.
| # | Layer | Lives in | Commit |
|---|---|---|---|
| 1 | schema |
packages/db (Drizzle) |
feat(<module>): schema |
| 2 | contract |
packages/contracts (Zod via drizzle-zod + ts-rest) |
feat(<module>): contract |
| 3 | repository |
libs/<module>/repository (port + Drizzle adapter) |
feat(<module>): repository |
| 4 | service |
libs/<module>/service (domain logic — imports only ports) |
feat(<module>): service |
| 5 | controller |
apps/api (thin HTTP, wires contract → service; bundles Queue infra, see above, if that add-on is on and this module needs it) |
feat(<module>): api |
Repeat 1–5 per module in scope, via hedgehog next/hedgehog verify.
The API is complete, typed, and callable (Postman/curl/contract tests)
before frontend work starts.
Domain Module — Frontend Steps (Phase B, after Phase A closes for the module)
| # | Layer | Lives in | Commit |
|---|---|---|---|
| 6 | hook |
packages/hooks (TanStack Query) |
feat(<module>): hooks |
| 6a | UX rationale | docs/design/<module>.md, ux-planner agent |
bundled into layer 7's commit |
| 7 | screen |
apps/web and/or apps/mobile |
feat(<module>): screen-web / feat(<module>): screen-mobile |
Phase B starts once Phase A is done for the scope. The frontend is a pure
consumer of an already-finished API. Delegate each module's Phase B
layers to the front-end-eng agent, same reasoning as backend-eng for
Phase A — one hedgehog next packet at a time, in its own context. Step
6a is where "how it should feel" gets decided — once per module, after
the hook layer's task is complete and before front-end-eng starts
the screen layer — via ux-planner, starting from whatever planner
filed in docs/design/<module>-notes.md at planning intake, or the raw
UX spec directly if that file is absent. Its first run for a module also
signals to the user that Phase B has started, and is the point a mockup,
screenshot, or export (Google Stitch, Figma) can be handed over. It
writes docs/design/<module>.md, not its own compiled layer — the
screen layer's hedgehog verify is what gates and commits it.
The Loop (every unit of work)
Run
hedgehog next. It emits the task packet for one ready layer (STATUS/WHY NOW/BLOCKED DOWNSTREAM/ALLOWED SCOPE/VERIFICATION) — trust it:hedgehog nextnever emits a layer whose dependencies aren'tcomplete, so there's no separate gate check to run by hand.Delegate the full packet (not a step name) to
backend-eng(Phase A) orfront-end-eng(Phase B) — one schema, one contract, one repository, matching the packet's ALLOWED SCOPE.The agent runs typecheck/lint/test on its own work (mirrors lefthook, wired at bootstrap) as a sanity check before reporting back — necessary, not sufficient. The agent reports the work as done; it does not move the task and does not commit.
Run
hedgehog verify <task-id>. It checks the touched files against the packet's ALLOWED SCOPE, runs the layer's VERIFICATION command, and on a pass writes the commit (the exact Conventional Commit message from the tables above, plus the updated build graph) and unlocks the next layer. On a scope violation or a failing check, the task staysimplemented/failedand nothing downstream unlocks — fix it and re-runhedgehog verify <task-id>, don't hand-commit around it.A stalled task is not pickable by
hedgehog next, so bothhedgehog nextandhedgehog statuslist it under NEEDS ATTENTION with the task id to re-verify. Ifhedgehog nextreports the graph blocked, fix that task — don't treat it as "nothing left to do."Repeat —
hedgehog nextagain for the following layer.
Each hedgehog verify call commits exactly one layer, built right for
what's known now; a wrong layer is fixed forward later via the
Correction Protocol.
Intra-step conventions
The Nx boundaries, phase gate, and lint own the structural rules
(what imports what, what gets built when). These are the conventions
inside a step that those gates can't see — apply them uniformly so a
fresh-context session builds module N the same way it built module 1. The
reviewer agent checks these at a phase boundary.
- Errors are thrown, typed, and domain-named. A service throws a
domain error (
OrderNotFoundError, not a bareErroror an HTTP exception) — services don't know they're behind HTTP. The controller is the only layer that maps domain errors to status codes. Never returnnull/undefinedto signal a failure a caller must branch on. - Repository not-found returns
undefined; the service decides. AfindByIdthat misses returnsundefined(a plain absence, not an error); the service turns that into a thrown domain error when the operation requires the row. Adapters don't throw domain errors — they report absence, the service interprets it. - Validation lives at the contract boundary, once. Input is Zod-validated at the controller via the ts-rest contract. Past that boundary, types are trusted — services and repositories don't re-parse. A service-level invariant that isn't expressible in the Zod schema (e.g. "can't cancel after payment") is enforced in the service as a thrown domain error, not a second validation pass.
- Multi-write operations are transactional. A service method that writes more than once wraps the writes in one Drizzle transaction, passed through the port — partial writes never escape a failed operation.
- Services are pure domain logic. No logging, no HTTP, no queue mechanics inside a service method — those live at the controller / adapter edge. A service reads as the business rule and nothing else.
Friction log
Real friction during a build — an agent's instructions were unclear, a
redline had to be issued twice for the same underlying gap, the user
had to correct the same kind of mistake more than once, or user
feedback implied something was wrong even without a direct correction
(a preference stated once that, read plainly, means an earlier step
missed something) — is signal worth keeping past this session, separate
from the Correction Protocol that fixes it in the moment. Log one entry
via hedgehog friction add "<note>" [--task <task-id>] when that
happens: what was tried, what went wrong or was implied, why if visible,
and the commit/message it traces to, all in the note text; pass --task
with the layer's task id when the friction traces to one. This is a log,
not a todo list — don't let it block or slow the Loop; log and keep
moving. tweaker reads it (via hedgehog friction list) once the build
reaches its Stop Condition.
Correction Protocol
When a downstream step reveals an upstream step was wrong:
- Stop.
- Patch the upstream step directly, in place.
- Fast-forward every dependent step that breaks, each its own small
commit. If the patched step lives in a workspace package (e.g.
packages/hooks,packages/contracts) that a runningweb/mobiledev server consumes, run that package'snx run <pkg>:buildbefore re-verifying — the dev server resolves the package's builtdist/, not itssrc/, so an unbuilt patch looks unchanged to anything downstream even though the source is fixed. - The commit messages are the explanation.
- Resume the loop.
Use conventional-commits when a correction touches several steps in one
working-tree pass and needs splitting back into per-step commits.
Phase Transition Checks
Before starting Phase B for a module, confirm:
hedgehog statusshows that module'scontrollertaskcomplete(equivalently, afeat(<module>): apicommit exists).- The contract is callable and typed (contract tests pass).
Use the reviewer agent for this — it checks what the mechanical gate
can't (port discipline, FK-by-ID discipline, contract shape).
Before starting Phase A for a module, confirm it's inside the stated scope
boundary from planning intake (planner). If not, stop and ask.
Rules
- Phase A closes before Phase B opens. Every module in scope has a working, tested API before any hook or screen starts.
- Sequential within a phase. A step starts once the one before it compiles and passes tests.
- Queue infra is conditional twice over — only if the Queue add-on is
on for this project at all (per
.hedgehog/addons.yaml'squeue.on), and even then only when a given operation genuinely needs async (long-running, retries, fan-out); the normal case has no queue. - A wrong step gets fixed at its source — the Correction Protocol, not a downstream workaround.
- Tests gate every commit in the sequence.
- A module's frontend code (hook, screen) is built after its API is committed.
- The screen step doesn't start blank —
ux-plannerruns once per module, after the hook is committed, beforefront-end-engstarts the screen. packages/configis the single source for shared config; a per-app override request signals to fix the base config at the source.
Stop Condition
A build session ends when hedgehog status shows every task for every
module in scope complete (Phase A and Phase B both closed), or when
scope is ambiguous enough that continuing means guessing — ask one
question and wait.
On the former (a real build completion, not an ambiguity stop), offer a
fresh-context handoff before doing anything else: tell the user the
build is complete, that clearing context now costs nothing (the build
graph and the commit log hold everything), and that a tweaker session
is the right next step for any adjustments — it starts clean, reviews
the friction log (hedgehog friction list) once for a possible
discipline-improvement suggestion, and takes tweak requests one at a
time from there. Don't start making tweaks in the current, already-large