Third-Party Manager Scorecard Review
Workflow purpose
Hold the third-party manager accountable with a defensible, data-driven scorecard anchored to the PMA and the operating outcomes the owner expects. Surface material performance gaps early so remediation is an ordinary conversation rather than a rupture. Ensure every audit finding is tracked to resolution. Route PMA amendment or termination through the correct approval path.
This pack is flagship-depth. It is where ownership's oversight layer converts a TPM's operating output into an ownership-grade judgment. It is also where PMA integrity lives: service standards, reporting cadence, data quality, approval responsiveness, and audit posture.
Trigger conditions
- Explicit: "TPM scorecard", "third-party manager review", "PMA performance review", "owner-oversight review", "TPM quarterly scorecard".
- Implicit: month close with TPM-submitted report; audit finding opened; TPM requests approval beyond overlay band; performance metric drift; PMA anniversary approaching; TPM reporting lapse.
- Recurring: monthly per property for tactical scorecard; quarterly per PMA for strategic review.
Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| TPM-submitted owner report | report | required | monthly |
| Property monthly operating reviews | packs | required | from workflows/monthly_property_operating_review |
| Asset management reviews | packs | required | from workflows/monthly_asset_management_review |
| PMA terms overlay | yaml | required | service standards, SLAs, reporting requirements |
| Scorecard rubric overlay | yaml | required | weights |
| Audit findings log | table | required | open and closed |
| Approval request ledger | table | required | for TPM-initiated requests and owner response times |
| Market benchmarks | csv | required | for relative performance |
Outputs
| Output | Type | Shape |
|---|---|---|
| TPM scorecard | scorecard |
per rubric dimension, per asset, composite |
| Material gap memo | memo |
where and why; remediation path |
| Audit follow-up list | checklist |
by severity and age |
| TPM-facing communication | email_draft |
draft_for_review; tone per overlay |
| Remediation action plan | checklist |
owner-side and TPM-side items |
| PMA-review output (quarterly) | memo |
anniversary-aligned |
| Approval request bundle | list | for material performance action, PMA amendment |
Required context
Asset_class, segment, management_mode, market, pma_id, loan context (if covenant impact).
Process
Step 1. Inherit property and asset outputs.
Pull each TPM-managed property's monthly operating review and the corresponding asset management review. Both are inputs; the scorecard consumes, does not recompute.
Step 2. Report timeliness and data quality.
report_timeliness: share of required reports delivered on or before PMA due date.kpi_completeness: share of PMA-required KPIs populated.variance_explanation_completeness: share of material variances with explanations.
Each dimension scored per rubric overlay; missing or late reports are material gaps.
Step 3. Operating performance.
- Property-level performance vs. market benchmark:
tpm_collections_performance,tpm_turn_performance. budget_adherence_tpmvs. controllable lines.service_level_adherenceagainst PMA SLAs (response times, lead times, entry-notice compliance).staffing_vacancy_rate_tpmagainst PMA-approved roster.
Step 4. Oversight responsiveness.
approval_response_time_tpm: median days from TPM approval request to owner decision. This scorecard is bidirectional — owner-side delays show up here too. Owner-side median above overlay threshold flags owner-process review.
Step 5. Audit posture.
audit_issue_count_and_severity: open audit findings by severity; age of oldest critical finding.- Any critical finding open beyond overlay window is a scorecard red.
- Fair-housing or compliance findings route per row 3 automatically and are surfaced in the scorecard without revealing confidential details.
Step 6. Scorecard composition.
Apply rubric weights; compute composite score per asset and per PMA. Surface top drivers up and down. Track trend over trailing 6 and 12 months.
Step 7. Material gap identification (decision point).
- Yellow: one dimension below rubric band for one period; remediation plan requested, no approval.
- Orange: two dimensions below rubric band, or one dimension below for two consecutive periods; remediation plan with explicit owner-side actions;
approval_requestfor material action (overlay-governed; typically asset_manager + portfolio_manager). - Red: three or more dimensions below rubric band or any critical audit finding beyond window;
approval_requestrow 19 path opens for PMA amendment or termination consideration with legal.
Step 8. TPM-facing communication.
Produce the communication draft with overlay tone and clear asks. draft_for_review. Never sent without owner-side approval.
Step 9. Quarterly PMA review.
At quarter end, produce the PMA-anniversary-aligned review with strategic view: PMA term, market context, contracted fees vs. performance, term and amendment history.
Step 10. Confidence banner.
Every reference cited with as_of_date and status. PMA-specific overlay as_of_date surfaced.
Branches
- If the scorecard reveals a fair-housing or compliance finding in the TPM's operations: route immediately per row 3; the scorecard memo notes the flag but does not detail; counsel leads.
- If the scorecard implies PMA fee structure misalignment: route as separate evaluation; do not bundle with operational remediation.
- If the scorecard is red for two consecutive months: escalate to executive review; portfolio_manager + asset_manager + legal path opens row 19 for possible PMA change.
- If the TPM is in the middle of a market-wide operating shock (e.g., a hurricane) that distorts metrics: note context, discount a dimension with explicit rationale, and consult overlay for force-majeure treatment.
Metrics used
report_timeliness, kpi_completeness, variance_explanation_completeness, budget_adherence_tpm, staffing_vacancy_rate_tpm, tpm_collections_performance, tpm_turn_performance, service_level_adherence, approval_response_time_tpm, audit_issue_count_and_severity.
Reference files used
reference/derived/role_kpi_targets.csvreference/normalized/collections_benchmarks__{region}_mf.csvreference/normalized/turn_benchmarks__{market}.csvreference/normalized/tpm_scorecard_rubric__{org}.yamlreference/normalized/pma_terms__{pma_id}.yamlreference/normalized/approval_threshold_defaults.csv
Escalation points
- Yellow: remediation plan requested; no approval.
- Orange:
approval_requestper overlay for material action. - Red or critical audit beyond window: row 19 for PMA amendment/termination consideration; legal involved.
- Fair-housing / compliance finding: row 3 (counsel-led).
- Owner-side delay signal (
approval_response_time_tpm): owner-process review.
Required approvals
- Material performance-gap action (overlay-defined).
- PMA amendment or termination (row 19).
- Any public-facing response to audit/compliance finding (row 3).
Failure modes
- Scorecard without PMA basis. Fix: PMA overlay required.
- Absolute metrics without market benchmark. Fix: benchmarks mandatory for relative context.
- Ignoring owner-side response times. Fix:
approval_response_time_tpmbidirectional; owner-side flagged. - Private audit detail leaked in TPM-facing draft. Fix: scorecard notes flag, counsel handles communications.
- Seasonal distortions unadjusted. Fix: overlay governs seasonal adjustment.
- PMA amendment proposed without legal. Fix: row 19 required.
- Sample data as authoritative. Fix: confidence banner.
Edge cases
- TPM managing in multiple markets: asset-level scorecards rolled to PMA-level for quarterly review; variance by market surfaced.
- New PMA (first 3-6 months): rubric adjustments per overlay; ramp period defined.
- PMA with incentive structure: tie scorecard dimensions to incentive KPIs per PMA; scorecard note explicit.
- PMA renewal approaching: strategic review inputs to renewal decision; routes via
workflows/owner_approval_routingif renewal decision needed. - TPM bought by another operator (M&A): scorecard pauses auto-actions; legal review.
Example invocations
- "Run the monthly TPM scorecard for our Charlotte portfolio."
- "Quarterly PMA review for PMA X; include strategic view."
- "TPM Y missed report three times this quarter. Build the scorecard and the remediation plan."
Example outputs
Output — Monthly TPM scorecard (abridged, Charlotte portfolio, March 2026)
Report timeliness. report_timeliness within band for the quarter.
Data quality. kpi_completeness and variance_explanation_completeness within band.
Operating performance. tpm_collections_performance within band at benchmark. tpm_turn_performance slightly above benchmark (slower turns); yellow. budget_adherence_tpm within band.
Service levels. service_level_adherence within band.
Staffing. staffing_vacancy_rate_tpm one position above overlay threshold at one asset; yellow.
Oversight responsiveness. approval_response_time_tpm median within band. Owner-side responsiveness within band.
Audit posture. audit_issue_count_and_severity two low findings, no critical; both within overlay window.
Composite. Two yellows; overall within acceptable band. Remediation plan requested.
TPM-facing communication. draft_for_review; asks scoped to the two yellow dimensions.
Approvals. None this period. Remediation plan is an owner ask, not an approval.
Confidence banner. tpm_scorecard_rubric__{org}@2026-03-31, status=starter. pma_terms__pma_charlotte_mf@2026-03-31, status=sample (PMA overlay pending PMA redline). turn_benchmarks__charlotte@2026-03-31, status=starter. collections_benchmarks__southeast_mf@2026-02-28, status=starter.
Output — Quarterly PMA review (abridged, PMA X, Q1 2026)
Strategic view. Composite trend across trailing 6 and 12 months.
Operating performance. Per-asset contributions; one asset carrying a yellow for two consecutive quarters.
PMA term and fees. Term X years remaining; fee structure aligned with overlay.
Recommendation. Continue; adopt a formal remediation plan on the persistent yellow asset. No PMA amendment this quarter.
Confidence banner. References surfaced.