Container Home
Do Not Use When
- Do not use as a substitute for licensed engineering, permitting, electrical, structural, septic, or legal signoff.
- Required context is missing and cannot be reasonably inferred.
- A more specific skill in this repo is a better match.
Workflow
- Identify the exact task and available source material.
- Apply the domain rules and output format in this skill.
- State assumptions, uncertainty, and missing inputs clearly.
- Return the requested artifact, recommendation, or review in a practical format.
- Check the result against the validation checklist before finishing.
Use this skill when the user is asking about Mick's off-grid shipping container lake home at Land Between the Lakes near Dover, Tennessee.
Trigger When
- The user mentions the container home, lake home, container house, or container expansion
- The user mentions Stewart County, Dover TN, or LBL
- The task involves solar, septic permitting, water, off-grid systems, welding, fabrication, or layout decisions for this property
- The user wants project-aware Facebook post copy about the build
Intent
Provide project-specific context and guidance for the current build, the planned expansion, and the broader retirement-property strategy without making the user restate the full background every time.
Current Structure
- Two 40-foot high cube containers welded side by side
- Current living area is about 640 square feet
- The right wall and back wall are underground and reinforced with H-beams
- The structure is livable now and used as a weekend retreat
- Construction has been almost entirely owner-built and mostly solo
Systems
- Solar: 500W+ array, 4x105Ah battery bank, 2000W Renogy inverter, 12V distribution
- Planned solar upgrade: 15 kW for full-time residence use
- Water: own water supply on the property
- Waste: incinerator commode currently, no septic system yet
- Interior: framing, cedar finish, plumbing rough-in, propane refrigerator, and related work already underway
Expansion Plan
- Two additional 40-foot containers will expand the main living area to about 1,280 square feet
- A third container is planned as a gym on the other side of the deck
- An additional container is planned for storage expansion
- Septic permitting in 2026 is a critical path item before full-time occupancy
- The long-term goal is a full-time retirement residence, not a rental or flip
Retirement Context
- The property is part of an early retirement plan built around geographic arbitrage
- Stewart County property taxes are much lower than the current Pleasant View home
- Off-grid solar and owned water help reduce fixed monthly costs
- The property supports a lower-cost lifestyle that frees up money for travel
What This Skill Helps With
Design And Planning
- Layout questions
- Structural planning
- Container placement
- Interior planning for the expansion
Permitting And Systems
- Septic permitting questions
- Solar upgrades
- Water and utility planning
Construction And Fabrication
- Welding and plasma-cutting decisions
- Steel reinforcement questions
- Practical build sequencing for an owner-builder
Facebook Posts About The Project
When writing about the project for Facebook:
- use first-person, practical language
- lead with a specific concrete detail
- avoid emojis
- avoid em dashes in final post output
- keep the tone direct and not promotional
- use 2 to 3 relevant hashtags such as
#ContainerHome, #OffGrid, #EarlyRetirement, #SolarPower, #StewartCountyTN, #DIY, #Welding, #GeographicArbitrage, or #FinancialFreedom
Project Phase Modes
Target guidance to the phase the question lives in instead of answering at the whole-project level:
site prep: grading, drainage, container placement, underground wall considerations; decisions here are the most expensive to reverse
welding and fabrication: joining, cutting, reinforcement, weather sealing; account for the solo-builder reality of fit-up, clamping, and lifting without a second set of hands
framing and interior: stud layout against corrugated walls, insulation strategy, cedar finish work, moisture control in a partially buried structure
solar: the 500W-to-15kW upgrade path, battery sizing for full-time loads, inverter and distribution changes, generator backup integration
plumbing and septic: rough-in decisions that depend on the 2026 septic permit, incinerator-to-septic transition, freeze protection for weekend versus full-time use
gym and storage containers: simpler fit-out, but placement and deck integration interact with the main expansion
Name the phase being addressed when the question spans more than one.
Sequencing Risk Checks
Before recommending an order of work, check the dependencies that have already bitten container builds like this one:
- septic permitting gates full-time occupancy; any task that assumes full-time presence inherits that dependency
- cutting container openings before the expansion containers are placed and welded changes the structural picture; sequence reinforcement with placement
- the 15kW solar build should follow load reality, not precede it; wiring runs and panel placement depend on final container positions
- underground wall drainage and waterproofing must precede interior finish on those walls; redoing cedar over a moisture problem is the expensive version
- winter limits concrete, some welding, and trench work; flag weather-dependent steps when the timeline crosses seasons
Call out any recommendation that creates a new dependency, and say which existing milestone it blocks or is blocked by.
Materials And Equipment Planning
When a phase plan includes purchases, split them explicitly:
- Buy now: items that gate the next work session, have long lead times, or are cheaper in current bulk or seasonal pricing
- Can wait: items for later steps, anything whose spec might change as the design firms up, and tools cheaper to rent for one-time use
For each buy-now item, give the quantity basis (linear feet, square footage, panel count) so the list survives a price check at the supplier. Flag where renting beats buying for one-phase equipment such as trenchers or lifts.
Key Facts To Remember
- Two living containers now
- Four total containers planned for the main residence footprint
- Current living space is about 640 square feet
- Expanded main living space target is about 1,280 square feet
- Dedicated gym container is planned
- Storage expansion is planned
- No septic yet
- 15 kW solar is planned for full-time use
- Project is in Stewart County near Dover, Tennessee
- Build is owner-led and mostly solo
Tone
Treat Mick as an experienced builder. Do not hand-hold. Give direct, technical answers and practical second-opinion guidance rather than beginner tutorials.
Constraints
- Do not rewrite the project facts into a vague generic container-home answer
- Do not assume this is a rental, speculative build, or flip
- Do not over-explain basic welding or construction concepts unless asked
- Do not lose the off-grid and retirement-planning context
Validation Checklist
Help And Examples
If the user is not sure how to use this skill, asks what it needs, or asks for examples:
- Explain in plain language what this skill can do.
- Tell the user the minimum input needed for a useful first pass.
- Show the example prompts below.
- Offer the fastest next prompt the user can send.
Minimum useful input:
- The build problem, decision, or next phase you want to work through.
Example prompts:
Use container-home to help me plan the next phase of my off grid build in Stewart County, TN.
I need a materials and sequencing plan for welding container roof framing. Use the container-home skill.
Show me how to ask this skill for a practical build decision with cost and tradeoff analysis.
1---2name: container-home3description: Answer questions, assist with planning, and help with design decisions for Mick's off-grid shipping container lake home project. Trigger when the user mentions the container home, lake home, Stewart County, LBL, the expansion, solar system, septic permitting, or retirement property.4---56# Container Home78## Do Not Use When910- Do not use as a substitute for licensed engineering, permitting, electrical, structural, septic, or legal signoff.11- Required context is missing and cannot be reasonably inferred.12- A more specific skill in this repo is a better match.1314## Workflow15161. Identify the exact task and available source material.172. Apply the domain rules and output format in this skill.183. State assumptions, uncertainty, and missing inputs clearly.194. Return the requested artifact, recommendation, or review in a practical format.205. Check the result against the validation checklist before finishing.2122Use this skill when the user is asking about Mick's off-grid shipping container lake home at Land Between the Lakes near Dover, Tennessee.2324## Trigger When2526- The user mentions the container home, lake home, container house, or container expansion27- The user mentions Stewart County, Dover TN, or LBL28- The task involves solar, septic permitting, water, off-grid systems, welding, fabrication, or layout decisions for this property29- The user wants project-aware Facebook post copy about the build3031## Intent3233Provide project-specific context and guidance for the current build, the planned expansion, and the broader retirement-property strategy without making the user restate the full background every time.3435## Current Structure3637- Two 40-foot high cube containers welded side by side38- Current living area is about 640 square feet39- The right wall and back wall are underground and reinforced with H-beams40- The structure is livable now and used as a weekend retreat41- Construction has been almost entirely owner-built and mostly solo4243## Systems4445- Solar: 500W+ array, 4x105Ah battery bank, 2000W Renogy inverter, 12V distribution46- Planned solar upgrade: 15 kW for full-time residence use47- Water: own water supply on the property48- Waste: incinerator commode currently, no septic system yet49- Interior: framing, cedar finish, plumbing rough-in, propane refrigerator, and related work already underway5051## Expansion Plan5253- Two additional 40-foot containers will expand the main living area to about 1,280 square feet54- A third container is planned as a gym on the other side of the deck55- An additional container is planned for storage expansion56- Septic permitting in 2026 is a critical path item before full-time occupancy57- The long-term goal is a full-time retirement residence, not a rental or flip5859## Retirement Context6061- The property is part of an early retirement plan built around geographic arbitrage62- Stewart County property taxes are much lower than the current Pleasant View home63- Off-grid solar and owned water help reduce fixed monthly costs64- The property supports a lower-cost lifestyle that frees up money for travel6566## What This Skill Helps With6768### Design And Planning6970- Layout questions71- Structural planning72- Container placement73- Interior planning for the expansion7475### Permitting And Systems7677- Septic permitting questions78- Solar upgrades79- Water and utility planning8081### Construction And Fabrication8283- Welding and plasma-cutting decisions84- Steel reinforcement questions85- Practical build sequencing for an owner-builder8687### Facebook Posts About The Project8889When writing about the project for Facebook:9091- use first-person, practical language92- lead with a specific concrete detail93- avoid emojis94- avoid em dashes in final post output95- keep the tone direct and not promotional96- use 2 to 3 relevant hashtags such as `#ContainerHome`, `#OffGrid`, `#EarlyRetirement`, `#SolarPower`, `#StewartCountyTN`, `#DIY`, `#Welding`, `#GeographicArbitrage`, or `#FinancialFreedom`9798## Project Phase Modes99100Target guidance to the phase the question lives in instead of answering at the whole-project level:101102- `site prep`: grading, drainage, container placement, underground wall considerations; decisions here are the most expensive to reverse103- `welding and fabrication`: joining, cutting, reinforcement, weather sealing; account for the solo-builder reality of fit-up, clamping, and lifting without a second set of hands104- `framing and interior`: stud layout against corrugated walls, insulation strategy, cedar finish work, moisture control in a partially buried structure105- `solar`: the 500W-to-15kW upgrade path, battery sizing for full-time loads, inverter and distribution changes, generator backup integration106- `plumbing and septic`: rough-in decisions that depend on the 2026 septic permit, incinerator-to-septic transition, freeze protection for weekend versus full-time use107- `gym and storage containers`: simpler fit-out, but placement and deck integration interact with the main expansion108109Name the phase being addressed when the question spans more than one.110111## Sequencing Risk Checks112113Before recommending an order of work, check the dependencies that have already bitten container builds like this one:114115- septic permitting gates full-time occupancy; any task that assumes full-time presence inherits that dependency116- cutting container openings before the expansion containers are placed and welded changes the structural picture; sequence reinforcement with placement117- the 15kW solar build should follow load reality, not precede it; wiring runs and panel placement depend on final container positions118- underground wall drainage and waterproofing must precede interior finish on those walls; redoing cedar over a moisture problem is the expensive version119- winter limits concrete, some welding, and trench work; flag weather-dependent steps when the timeline crosses seasons120121Call out any recommendation that creates a new dependency, and say which existing milestone it blocks or is blocked by.122123## Materials And Equipment Planning124125When a phase plan includes purchases, split them explicitly:126127- **Buy now**: items that gate the next work session, have long lead times, or are cheaper in current bulk or seasonal pricing128- **Can wait**: items for later steps, anything whose spec might change as the design firms up, and tools cheaper to rent for one-time use129130For each buy-now item, give the quantity basis (linear feet, square footage, panel count) so the list survives a price check at the supplier. Flag where renting beats buying for one-phase equipment such as trenchers or lifts.131132## Key Facts To Remember133134- Two living containers now135- Four total containers planned for the main residence footprint136- Current living space is about 640 square feet137- Expanded main living space target is about 1,280 square feet138- Dedicated gym container is planned139- Storage expansion is planned140- No septic yet141- 15 kW solar is planned for full-time use142- Project is in Stewart County near Dover, Tennessee143- Build is owner-led and mostly solo144145## Tone146147Treat Mick as an experienced builder. Do not hand-hold. Give direct, technical answers and practical second-opinion guidance rather than beginner tutorials.148149## Constraints150151- Do not rewrite the project facts into a vague generic container-home answer152- Do not assume this is a rental, speculative build, or flip153- Do not over-explain basic welding or construction concepts unless asked154- Do not lose the off-grid and retirement-planning context155156## Validation Checklist157158- [ ] Uses the actual current build and expansion facts159- [ ] Keeps septic permitting as a critical-path constraint160- [ ] Reflects the owner-builder and mostly solo construction model161- [ ] Preserves the off-grid and retirement-planning context162- [ ] Avoids em dashes in final Facebook post output163164## Help And Examples165166If the user is not sure how to use this skill, asks what it needs, or asks for examples:167168- Explain in plain language what this skill can do.169- Tell the user the minimum input needed for a useful first pass.170- Show the example prompts below.171- Offer the fastest next prompt the user can send.172173Minimum useful input:174175- The build problem, decision, or next phase you want to work through.176177Example prompts:178179- `Use container-home to help me plan the next phase of my off grid build in Stewart County, TN.`180- `I need a materials and sequencing plan for welding container roof framing. Use the container-home skill.`181- `Show me how to ask this skill for a practical build decision with cost and tradeoff analysis.`182