Roll Out Runtime-Risky Changes
$fw:rollout is Flywheel's change-management stage for runtime-risky work.
Use it when the question is not "how do we code this?" but:
- how should this change reach users or traffic?
- what must be proven before and during rollout?
- what signals tell us to continue, pause, mitigate, or roll back?
This skill does not automate deployments. It produces a grounded rollout posture, validation playbook, and commit handoff.
Interaction Method
Follow ../references/host-interaction-contract.md.
Call the exact host question tool named in
../references/host-interaction-contract.md when that tool is available. Do
not ask for raw 1/2/3 replies when the host already offers a choice surface.
When the workflow spans multiple material steps, use the host task-tracking
tool named in ../references/host-interaction-contract.md to create and
maintain a short task list.
Ask one question at a time. When multiple rollout postures are viable, present the recommended label first and rely on the host's native freeform final path when it exists.
Input
#$ARGUMENTS
Interpret the input as:
- a runtime-risky change ready for release planning
- a plan or PR context that needs rollout posture
- a request for canary, feature-flag, staged-release, or rollback planning
- a blank request to inspect current work and decide whether rollout is needed
If the change is clearly not runtime-facing or the blast radius is trivial,
say so plainly and hand off to $fw:commit with a grounded no-rollout rationale.
Reference Loading Map
Do not preload every reference. Load only what the current phase needs:
- Read
references/rollout-template.mdwhen producing the rollout handoff artifact. - Read
references/validation-playbook.mdwhen choosing rollout posture or validation shape. - Read
../observability/references/service-readiness-matrix.mdwhen the change crosses contracts, state, retries, queues, migrations, or other blast-radius-sensitive boundaries. - Read
../commit/references/evidence-bundle.mdwhen rollout proof should feed$fw:commit.
Core Principles
- Rollout is about blast radius control - choose the smallest honest path to production confidence.
- Compatibility outranks speed - if readers, writers, schemas, queues, or clients may disagree during transition, design for mixed-state operation.
- Validation must be executable - name the exact queries, dashboards, traces, smoke checks, and owners.
- Rollback is part of the plan - define what gets undone, how, and under which trigger before calling the rollout ready.
- Reuse evidence, do not restate it - consume the shared evidence bundle when proof already exists and add only the rollout-specific summary.
Workflow
Phase 1: Touch Grass
Ground the rollout in repo and release truth:
- read
AGENTS.mdandCLAUDE.mdwhen present - read the plan, latest review outcome, and any shared evidence bundle when they already exist
- inspect deploy docs, runbooks, feature-flag config, kill switches, migration playbooks, queue controls, and environment docs
- inspect observability surfaces, dashboards, alerts, saved queries, and error trackers for the affected path
- read
.flywheel/config.local.yamlwhen present for repo-local commit or runtime gates - inspect the active repo's
docs/solutions/for prior rollout or incident lessons in the same area
Capture:
- the runtime surface being changed
- the compatibility window, if any
- the likely blast radius if the change is wrong
- the rollback or mitigation levers that already exist
- the signals and owners available during rollout
Phase 2: Decide Whether A Dedicated Rollout Is Needed
Use rollout when one or more of these are true:
- contracts or client expectations can be mixed during transition
- state or schema changes may race with live traffic
- retries, queues, jobs, or backfills can amplify bad behavior
- the change touches auth, permissions, billing, or other high-cost paths
- the blast radius is wider than a trivial local leaf
- the repo or team already expects staged enablement for this surface
If none apply and the runtime impact is small, say that a dedicated rollout
stage is not needed and hand off to $fw:commit with the exact rationale.
Phase 3: Choose Rollout Posture
Read references/validation-playbook.md.
Choose the narrowest viable posture, for example:
- Feature-flagged progressive enablement
- Canary or percentage rollout
- Tenant, region, cell, or queue partition rollout
- Shadow, dual-write, or read-compare transition
- All-at-once only when blast radius is genuinely low and rollback is trivial
- Freeform path when the repo needs a different rollout posture
State why the recommended posture fits the current compatibility constraints, rollback levers, and blast radius better than the alternatives.
Phase 4: Build The Validation Playbook
Use the chosen posture to define:
- preflight checks
- activation sequence
- healthy signals
- failure signals
- rollback or mitigation trigger
- validation window and owner
- evidence to capture or reuse
If the change is runtime-risky, read
../observability/references/service-readiness-matrix.md so the rollout plan
accounts for contract, state, degradation, and recovery rather than just
"watching logs."
Phase 5: Produce The Handoff Artifact
Read references/rollout-template.md.
Prefer a local rollout artifact at:
.context/flywheel/rollout/<run-id>/rollout.md
Also create or update the shared evidence bundle under:
.context/flywheel/evidence/<bundle-id>/
Add only the rollout-specific reusable summary:
- chosen rollout posture
- activation sequence
- validation window and owner
- rollback or mitigation trigger
- any PR-safe evidence references the commit stage should cite
Keep bulky dashboards, raw logs, and detailed incident notes in their native locations and reference them from the artifact instead of duplicating them.
Output Contract
Return a concise rollout brief:
- Runtime surface - what is being rolled out
- Why rollout is or is not needed
- Chosen posture - the recommended rollout shape
- Compatibility and blast-radius notes
- Validation playbook - preflight, healthy signals, failure signals, rollback trigger, owner, and validation window
- Artifacts - rollout artifact path and shared evidence-bundle path when created
- Next handoff - usually
$fw:commit, or$fw:workor$fw:planif the rollout assumptions are not yet satisfiable