DPIA Mitigation Planning
Overview
Article 35(7)(d) GDPR requires a DPIA to include "the measures envisaged to address the risks, including safeguards, security measures and mechanisms to ensure the protection of personal data and to demonstrate compliance with this Regulation." This skill provides a structured mitigation planning framework.
Mitigation Strategy Categories
Technical Measures
| Category |
Examples |
GDPR Reference |
| Encryption |
At-rest, in-transit, end-to-end |
Art. 32(1)(a) |
| Pseudonymisation |
Tokenisation, hashing, key-coded |
Art. 25(1), Art. 32(1)(a) |
| Access controls |
RBAC, MFA, privileged access management |
Art. 32(1)(b) |
| Data minimisation |
Field-level reduction, aggregation, sampling |
Art. 5(1)(c), Art. 25(1) |
| Anonymisation |
k-anonymity, differential privacy, generalisation |
Recital 26 |
| Monitoring |
SIEM, DLP, anomaly detection |
Art. 32(1)(d) |
Organisational Measures
| Category |
Examples |
GDPR Reference |
| Policies |
Data protection policy, acceptable use |
Art. 24(2) |
| Training |
Privacy awareness, role-specific training |
Art. 39(1)(b) |
| Contracts |
DPAs, joint controller arrangements, NDAs |
Art. 28, Art. 26 |
| Audits |
Internal audits, processor audits, certification |
Art. 28(3)(h) |
| Governance |
DPO oversight, privacy committee, RACI |
Art. 37-39 |
| Incident response |
Breach procedures, notification protocols |
Art. 33-34 |
Mitigation Plan Structure
For each identified risk:
- Risk reference -- Link to DPIA risk register entry
- Inherent risk level -- Before mitigation
- Proposed measures -- Specific technical and organisational controls
- Implementation owner -- Accountable person
- Implementation deadline -- Target completion date
- Verification method -- How effectiveness will be confirmed
- Residual risk level -- After planned mitigation
- Acceptance decision -- Within appetite / escalation required / prior consultation
Residual Risk Decision Framework
Residual Risk LOW → Accept; document; routine monitoring
Residual Risk MEDIUM → Accept with enhanced monitoring; annual review
Residual Risk HIGH → Escalate to senior management; consider additional measures
Residual Risk VERY HIGH → Art. 36 prior consultation required before processing
Implementation Tracking
Each mitigation measure progresses through:
- Proposed -- Identified but not yet approved
- Approved -- Budget and resources allocated
- In Progress -- Implementation underway
- Implemented -- Deployed and operational
- Verified -- Effectiveness confirmed through testing
1---2name: dpia-mitigation-plan3description: >-4 Structures risk mitigation planning and residual risk tracking for Data5 Protection Impact Assessments under GDPR Article 35(7)(d). Covers6 mitigation measure identification, implementation tracking, residual7 risk acceptance, and Art. 36 prior consultation triggers. Keywords:8 DPIA mitigation, risk treatment, residual risk, Art. 35(7)(d),9 safeguards, mitigation tracking, prior consultation.10license: Apache-2.011metadata:12 source: https://skillmd.com/skills/mukul975-2/dpia-mitigation-plan13 author: mukul97514 version: "1.0"15 domain: privacy16 subdomain: privacy-impact-assessment17 tags: "dpia-mitigation, risk-treatment, residual-risk, art-35-7d, safeguards"18---1920# DPIA Mitigation Planning2122## Overview2324Article 35(7)(d) GDPR requires a DPIA to include "the measures envisaged to address the risks, including safeguards, security measures and mechanisms to ensure the protection of personal data and to demonstrate compliance with this Regulation." This skill provides a structured mitigation planning framework.2526## Mitigation Strategy Categories2728### Technical Measures29| Category | Examples | GDPR Reference |30|----------|----------|----------------|31| Encryption | At-rest, in-transit, end-to-end | Art. 32(1)(a) |32| Pseudonymisation | Tokenisation, hashing, key-coded | Art. 25(1), Art. 32(1)(a) |33| Access controls | RBAC, MFA, privileged access management | Art. 32(1)(b) |34| Data minimisation | Field-level reduction, aggregation, sampling | Art. 5(1)(c), Art. 25(1) |35| Anonymisation | k-anonymity, differential privacy, generalisation | Recital 26 |36| Monitoring | SIEM, DLP, anomaly detection | Art. 32(1)(d) |3738### Organisational Measures39| Category | Examples | GDPR Reference |40|----------|----------|----------------|41| Policies | Data protection policy, acceptable use | Art. 24(2) |42| Training | Privacy awareness, role-specific training | Art. 39(1)(b) |43| Contracts | DPAs, joint controller arrangements, NDAs | Art. 28, Art. 26 |44| Audits | Internal audits, processor audits, certification | Art. 28(3)(h) |45| Governance | DPO oversight, privacy committee, RACI | Art. 37-39 |46| Incident response | Breach procedures, notification protocols | Art. 33-34 |4748## Mitigation Plan Structure4950For each identified risk:51521. **Risk reference** -- Link to DPIA risk register entry532. **Inherent risk level** -- Before mitigation543. **Proposed measures** -- Specific technical and organisational controls554. **Implementation owner** -- Accountable person565. **Implementation deadline** -- Target completion date576. **Verification method** -- How effectiveness will be confirmed587. **Residual risk level** -- After planned mitigation598. **Acceptance decision** -- Within appetite / escalation required / prior consultation6061## Residual Risk Decision Framework6263```64Residual Risk LOW → Accept; document; routine monitoring65Residual Risk MEDIUM → Accept with enhanced monitoring; annual review66Residual Risk HIGH → Escalate to senior management; consider additional measures67Residual Risk VERY HIGH → Art. 36 prior consultation required before processing68```6970## Implementation Tracking7172Each mitigation measure progresses through:73- **Proposed** -- Identified but not yet approved74- **Approved** -- Budget and resources allocated75- **In Progress** -- Implementation underway76- **Implemented** -- Deployed and operational77- **Verified** -- Effectiveness confirmed through testing