Project Status
Report where the project stands. Everything the report says about planning comes from a query; everything it says about the code comes from read-only git.
This skill writes nothing at all. It opens no session, records no rows, and leaves no trace —
the one exception is a publish the user asked for and separately confirmed, which registers an
artifact. Every other dpm skill opens a session row because it has state worth resuming; this one
finishes in a single pass and has none, so it opens none. A dpm:status row in the session table
would be a resumable run that cannot be resumed.
Follow the shared conventions in dpm/shared/skill-conventions.md — read that file at startup.
This skill uses Gate Presentation, Conversational Output, Written Deliverable Length and
Artifact Publishing from it.
Input
$ARGUMENTS is optional focus.
- A document id focuses the report on that document and what hangs off it.
- A spec id does the same and adds the coverage roll-up — Phase 3b. That is the only trigger for it; the roll-up is spec-scoped and no other focus produces it.
- A description ("what's the state of the auth work?") guides which parts to emphasise.
- A request for the full picture — "dashboard", "artifact", "share it" — produces the report as usual and offers the page in Phase 4. Focus still applies and shapes both.
A spec id and a page request together are two different pages, so ask which. The spec coverage page and the project-wide picture answer different questions; offering one is not offering the other, and confirming one is never confirmation for the other.
No arguments produces the whole-project report, and offers neither page.
Startup
Library
Follow the shared Library Check procedure with scope keyword status. A project that has
recorded what it counts as done, or which epics are its own, says so there.
Nothing else runs at startup. No session: a report reads the rows and prints, so there is no step a later run could resume from — and a run that recorded one would leave a row in flight for every glance at the board. The session read in Phase 1 reports other skills' runs and is not this one's own. No retro to consume either — a report changes no decision, so a lesson has nothing here to change — and no roster.
Process
Phases 1 and 2 gather; Phase 3 synthesises and prints. Phase 3b runs only for a spec, Phase 4 only on request.
Phase 1: The planning rows
Every kind has a list tool, and the inventory is those lists. Call each with a limit above what
the project plausibly holds — mcp__plugin_dpm_dpm__list_spec, mcp__plugin_dpm_dpm__list_epic,
mcp__plugin_dpm_dpm__list_problem_brief, mcp__plugin_dpm_dpm__list_product_brief, mcp__plugin_dpm_dpm__list_adr,
mcp__plugin_dpm_dpm__list_retro, mcp__plugin_dpm_dpm__list_discussion, mcp__plugin_dpm_dpm__list_review,
mcp__plugin_dpm_dpm__list_audit, mcp__plugin_dpm_dpm__list_quick, mcp__plugin_dpm_dpm__list_runbook,
mcp__plugin_dpm_dpm__list_library — and report counts rather than titles. A list that comes back with
more set is one whose count is wrong, and a count reported short reads as a smaller project
rather than as a truncated read; raise the limit and call again rather than reporting the page.
Then the roll-up, per epic: mcp__plugin_dpm_dpm__list_story on it, and mcp__plugin_dpm_dpm__list_task per story where
task-level detail is wanted. An epic's completion is its stories' status, counted.
Retired stories leave the count rather than joining either side of it. An epic with three
complete stories and one withdrawn is complete: a withdrawn story is not work waiting to be done,
and holding it against the total keeps the epic open for something nobody intends to do. Say how
many were retired alongside the fraction, so a denominator that shrank does not do it silently.
Archived documents do not come back, and that is a WHERE clause rather than a rule this skill
remembers. Every document list omits rows with archived_at set unless the caller passes
include_archived. Archival is orthogonal to status — an archived epic is complete and swept —
so nothing here filters on both, and the report's counts are of the working set by construction.
Pass include_archived only when the question is the record: "what has been archived" is a
different question from "where does the project stand", and answering the second with the first
inflates every count.
Retro-waived epics are settled, and the column says so. A completed epic carrying
retro_waived_at is retro-satisfied: do not recommend a retro for it, exactly as if one existed.
The waiver comes back on the row alongside its retro_waived_reason, so the report can say why it
was waived rather than only that it was.
Whether a completed epic has a retro is a scoped list, not a comparison.
mcp__plugin_dpm_dpm__list_retro scoped by parent_id to that epic answers it directly. Do not list every
retro in the project and match parents in the run — that is a join in the caller, and it goes wrong
quietly the moment there are more retros than one page.
Active sessions replace the progress-file scan. mcp__plugin_dpm_dpm__list_session reports which skills
have runs in flight, with phase saying where each reached. updated_before narrows to the stale
ones — a session that has not moved in a long time is the thing worth mentioning, and an age is a
bound rather than a status.
Phase 2: Git activity
Read-only, and the one part of this skill that is not a query — the code's history is not in the planning rows.
git status --shortandgit branch --show-current: uncommitted work, untracked files, branch.- On a non-main branch,
git diff --stat main...HEAD. Fall back tomaster; skip if neither exists. git log --oneline -1 --format=%ctfor the last commit's age, which sets the window: under a day looks back three days, one to seven days looks back a fortnight, over seven days takes the last twenty commits regardless of date.git log --onelineandgit log --format=%sover that window. The subject lines are the raw material for the narrative.
Phase 3: Report
Print to stdout. One screenful, narrative rather than a data dump.
Summary — two to four short paragraphs answering what someone picking the project up would ask: what this project is (inferred from titles and commit subjects), what has been built (epics grouped into themes, not listed), what happened recently (the commit subjects read as threads, with the gap named if there is one), and what needs attention. Lead with active work if there is any.
If no rows exist at all, say so: the project has not started the dpm pipeline yet.
Recommended next steps — one to three, in priority order, each with a runnable command. The
order of the table is the priority order. /dpm:do, /dpm:epics and /dpm:retro appear in that
relative order because it is the candidate ordering in dpm/shared/status-model.md: work that can
start now, then work that needs planning, then the follow-up on work already done.
Each command is written out with the target's reference in it, which every row of the lists above already carries beside its columns. The command is then one a reader can copy, and the skill it names accepts what it was given — see Naming a Document in the shared conventions.
| What the rows say | What to recommend |
|---|---|
| Nothing at all | /dpm:discover or /dpm:brief |
An epic the ready filter returns |
/dpm:do and the epic's reference |
| An epic held by an incomplete blocker | Nothing to run — name the blocker from the edge that holds it; the action is to unblock |
| Specs but no epics | /dpm:epics and the spec's reference |
| Briefs but no specs | /dpm:spec and the brief's reference |
| A retired epic, or one whose only incomplete stories are retired | Nothing — it will not be worked, and no retro is owed on it |
A complete epic, no retro, no retro_waived_at |
/dpm:retro and the epic's reference |
A complete epic carrying retro_waived_at |
Nothing — it is settled |
| A session in flight | Resume it — name the skill and its phase |
| Uncommitted changes | Commit before starting new work |
Readiness is asked for, not inferred from the stories. mcp__plugin_dpm_dpm__list_epic with
ready applies dpm's own rule — the epic is pending, unarchived, and nothing incomplete blocks
it over an edge kind whose gates_work is set. An epic with incomplete stories is not the same
thing: one waiting on a blocker cannot be picked up, and recommending /dpm:do on it sends someone
at work they cannot start. When an epic is held, mcp__plugin_dpm_dpm__list_dependency names what
holds it, because the edge is a row.
Two of the four statuses are neither outstanding nor delivered, and the report says so in its own
word. pending and complete are the working pair; superseded means replaced by other work and
withdrawn means dropped, both terminal and both set by a person. Report them as retired, on a
line of their own. Folded into "complete" they overstate what was built; folded into "pending" they
are work somebody will pick up. Neither error is visible in a total, which is why the word is worth
a line rather than a parenthesis.
A status that cannot be read is flagged, never guessed, and counts as not-done. status is a
closed set the database enforces, so an off-vocabulary status cannot reach this report — it is
refused at the write. What can reach it is a status_note that reads like a status on a row whose
status is pending: "superseded", "withdrawn", "folded into Story 10". Report those in a callout
of their own, naming the document and quoting the note verbatim, count the row by its status
column, and recommend setting the status the note describes. Do not read a note as a status —
treating it as retired closes work nobody closed, and here the remedy is one call the reader can
make rather than a vocabulary the project lacks.
Phase 3b: Spec coverage roll-up (only for a spec)
Only when the focus resolves to a spec. It answers what the project-wide view cannot: is this spec delivered?
mcp__plugin_dpm_dpm__list_requirement on the spec with include_body and a limit above its requirement
count, then mcp__plugin_dpm_dpm__list_coverage scoped by requirement_id for each. Three states, from the
rows:
- Untraced — no coverage rows at all. The breakdown missed it. This is a gap in the plan rather than slow progress, and it is the load-bearing measurement.
- In progress — coverage rows exist, not all carry
verified_at. - Delivered — every coverage row carries
verified_at.
Never a proportion. Four rows verified of five is in progress, not 80% delivered.
Render untraced first, before the counts. Then the rest grouped by moscow in the spec's own order
— must, should, could — quoting each requirement's text verbatim, because that text is what
was asked for and paraphrasing it here is how the thing asked for stops matching the thing built.
List requirements carrying an exclusion separately, as ruled out rather than outstanding. Close
with the counts.
Say what verified_at means wherever the section shows it: aggregation, not verification. Every
one was set by dpm:do on its own work. Reporting them together reports what do claimed, more
conveniently, and adds no independent evidence. A wall of green is not confirmation that anything
runs. The untraced count is the part that discriminates, because the requirements are written by a
person and the coverage rows are made later against them.
And separate the marks a test produced from the ones nothing could. The spec's own tag for a
requirement is mcp__plugin_dpm_dpm__list_criterion_approach; the tag on the criterion the breakdown actually
wrote is mcp__plugin_dpm_dpm__list_story_criterion_approach, and the two need not agree. target and
manual are the approaches whose marks rest on something other than a test having run, so where any
verified row carries either, say how many and which — in the same breath as the counts. Do not
reweight anything: a mark is a mark, and this is a statement about what the marks rest on. A spec
tag of target over an automated criterion is worth its own line: it means the spec withheld from
verification something the breakdown found a way to check, which is almost always a mis-tag rather
than a decision.
An artifact can be published from this output on request — follow the shared Artifact Publishing
procedure. It is always separately confirmed, and never the default. For status this page is the
one view that spans a spec's epics: every requirement with its state and the rows behind it, in a
form that can be handed to someone with no repository. Render it from the rows already read, by the
rules above — a second read could disagree with the section the reader just saw. Carry the
aggregation statement onto the page, which is the artefact most likely to reach someone who was not
in the session.
Phase 4: The full picture (on request only)
Only when it was asked for. The stdout report is produced and printed unchanged either way, and this is offered in addition — offered, not published, separately confirmed, and never the default. A declined offer leaves a complete run behind it.
Follow the shared Artifact Publishing procedure. The page is built from the rows Phases 1 and 2 already read, so its numbers and the narrative's are the same numbers; state the headline as "{complete} of {total} epics complete" and make it match. Sections: an at-a-glance RAG view, what is in progress and what is blocked, the epic and story completion grid, recent git activity, and the same recommended next steps.
For status the page carries what one screen of narrative deliberately omits — the whole grid, at a
size stdout cannot hold. That justification is the test for anything else it might carry: if you
cannot write the line saying what the visual carries that the prose cannot, it has not earned its
place.
When the Artifact tool is absent, say so and stop after Phase 3. The narrative is the degradation path and it is complete on its own. Nothing is written to disk in its place.
Output
The report is printed and the run ends. There is no document, no rows, and nothing to project — the only durable thing a run can leave is the register row a confirmed publish writes.
Guidelines
- Read-only, and structurally so. Every planning read is a list or a read tool; every git command
is
log,status,difforbranch. Nothing here has a write tool available to misuse. - Degrade quietly on absence. A kind with no rows is a count of zero, not a failure. A project with no git repository loses Phase 2 and keeps the rest.
- Match depth to what is there. An empty project gets a short "start here". A project with twenty epics gets the inventory.