Standalone Install Note
If this environment only installed the current skill, start from the CloudBase main entry and use the published cloudbase/references/... paths for sibling skills.
- CloudBase main entry:
https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/SKILL.md
- Current skill raw source:
https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/spec-workflow/SKILL.md
Keep local references/... paths for files that ship with the current skill directory. When this file points to a sibling skill such as auth-tool or web-development, use the standalone fallback URL shown next to that reference.
Spec Workflow
Activation Contract
Use this first when
- The request is a new feature, multi-step product change, cross-module integration, or architecture/design task.
- Acceptance criteria are unclear and need to be made explicit before implementation.
- The work involves multiple files, user flows, database design, or UI design that needs staged confirmation.
Read before writing code if
- You are unsure whether the task should go straight to coding or should first go through requirements, design, and task planning.
- The request mentions a new page, a new system, a redesign, a workflow, or a multi-module refactor.
Then also read
- Frontend page or visual design work ->
../ui-design/SKILL.md (standalone fallback: https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/ui-design/SKILL.md)
- Advanced data-model work ->
../data-model-creation/SKILL.md (standalone fallback: https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/data-model-creation/SKILL.md)
Do NOT use for
- Small bug fixes with clear scope.
- One-file documentation updates.
- Straightforward config changes.
- Tiny refactors where the user already gave exact implementation instructions.
Common mistakes / gotchas
- Jumping into coding before acceptance criteria are explicit.
- Skipping user confirmation between requirements, design, and tasks.
- Writing vague tasks that do not map back to user-visible outcomes.
- Treating UI work as purely technical implementation without clarifying design intent.
Minimal checklist
- Decide whether the change really needs the full spec flow.
- If yes, stop and produce requirements first.
- If the change is small, low-risk, and acceptance is already clear, allow direct execution without forcing spec artifacts.
- Use EARS-style acceptance criteria.
- Get confirmation before moving to the next phase.
When to use this skill
Use this workflow for structured development when you need to:
- Define or refine a new feature
- Design complex architecture
- Coordinate changes across modules
- Plan database or UI-heavy work
- Improve requirement quality and acceptance boundaries
Decision rule
Use the full workflow when
- The task is medium or large
- The impact spans multiple modules
- Acceptance boundaries are fuzzy
- The user wants disciplined planning before implementation
Skip the full workflow when
- The task is small, low-risk, and already precise
- Goal, scope, and acceptance are already clear enough to execute directly
- The user explicitly wants a direct code change with no planning phase
Core workflow
Phase 1: Requirements
Create specs/<spec_name>/requirements.md.
What to do:
- Restate the problem and scope
- Write user stories
- Write acceptance criteria in EARS style
- Clarify business rules, constraints, and non-goals
EARS pattern:
While <optional precondition>, when <optional trigger>, the <system name> shall <system response>
Example:
When the user submits the form, the booking system shall validate required fields before creating the record.
Phase 2: Design
Create specs/<spec_name>/design.md.
What to do:
- Describe architecture and module boundaries
- Explain technology choices and trade-offs
- Define data model, API, security, and testing strategy as needed
- Use Mermaid only when a diagram materially improves clarity
Phase 3: Tasks
Create specs/<spec_name>/tasks.md.
What to do:
- Break the design into executable tasks
- Keep tasks specific and reviewable
- Link each task back to the relevant requirement
- Update task status as work progresses
Task format:
# Implementation Plan
- [ ] 1. Task title
- Specific work item
- Another concrete step
- _Requirement: 1
Phase 4: Execution
Only start implementation after the user confirms the task plan.
During execution:
- Keep task status current
- Finish one meaningful unit at a time
- Preserve traceability from change -> task -> requirement
Working rules for the agent
- Ask follow-up questions when the request is underspecified; do not guess core product behavior.
- Require confirmation between requirements, design, and task breakdown.
- Pull in
ui-design early when the change includes end-user pages or visual decisions.
- Keep documents concise but testable.
- Prefer user-visible outcomes over implementation-detail task names.
Output expectations
requirements.md -> problem, scope, user stories, EARS acceptance criteria
design.md -> architecture, technical approach, data/API/security/test notes
tasks.md -> actionable implementation checklist tied to requirements
1---2name: spec-workflow3description: Use when medium-to-large changes need explicit requirements, technical design, and task planning before implementation, especially for multi-module work, unclear acceptance criteria, or architecture-heavy requests.4---56## Standalone Install Note78If this environment only installed the current skill, start from the CloudBase main entry and use the published `cloudbase/references/...` paths for sibling skills.910- CloudBase main entry: `https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/SKILL.md`11- Current skill raw source: `https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/spec-workflow/SKILL.md`1213Keep local `references/...` paths for files that ship with the current skill directory. When this file points to a sibling skill such as `auth-tool` or `web-development`, use the standalone fallback URL shown next to that reference.1415# Spec Workflow1617## Activation Contract1819### Use this first when2021- The request is a new feature, multi-step product change, cross-module integration, or architecture/design task.22- Acceptance criteria are unclear and need to be made explicit before implementation.23- The work involves multiple files, user flows, database design, or UI design that needs staged confirmation.2425### Read before writing code if2627- You are unsure whether the task should go straight to coding or should first go through requirements, design, and task planning.28- The request mentions a new page, a new system, a redesign, a workflow, or a multi-module refactor.2930### Then also read3132- Frontend page or visual design work -> `../ui-design/SKILL.md` (standalone fallback: `https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/ui-design/SKILL.md`)33- Advanced data-model work -> `../data-model-creation/SKILL.md` (standalone fallback: `https://cnb.cool/tencent/cloud/cloudbase/cloudbase-skills/-/git/raw/main/skills/cloudbase/references/data-model-creation/SKILL.md`)3435### Do NOT use for3637- Small bug fixes with clear scope.38- One-file documentation updates.39- Straightforward config changes.40- Tiny refactors where the user already gave exact implementation instructions.4142### Common mistakes / gotchas4344- Jumping into coding before acceptance criteria are explicit.45- Skipping user confirmation between requirements, design, and tasks.46- Writing vague tasks that do not map back to user-visible outcomes.47- Treating UI work as purely technical implementation without clarifying design intent.4849### Minimal checklist5051- Decide whether the change really needs the full spec flow.52- If yes, stop and produce requirements first.53- If the change is small, low-risk, and acceptance is already clear, allow direct execution without forcing spec artifacts.54- Use EARS-style acceptance criteria.55- Get confirmation before moving to the next phase.5657## When to use this skill5859Use this workflow for structured development when you need to:6061- Define or refine a new feature62- Design complex architecture63- Coordinate changes across modules64- Plan database or UI-heavy work65- Improve requirement quality and acceptance boundaries6667## Decision rule6869### Use the full workflow when7071- The task is medium or large72- The impact spans multiple modules73- Acceptance boundaries are fuzzy74- The user wants disciplined planning before implementation7576### Skip the full workflow when7778- The task is small, low-risk, and already precise79- Goal, scope, and acceptance are already clear enough to execute directly80- The user explicitly wants a direct code change with no planning phase8182## Core workflow8384### Phase 1: Requirements8586Create `specs/<spec_name>/requirements.md`.8788What to do:8990- Restate the problem and scope91- Write user stories92- Write acceptance criteria in EARS style93- Clarify business rules, constraints, and non-goals9495EARS pattern:9697```text98While <optional precondition>, when <optional trigger>, the <system name> shall <system response>99```100101Example:102103```text104When the user submits the form, the booking system shall validate required fields before creating the record.105```106107### Phase 2: Design108109Create `specs/<spec_name>/design.md`.110111What to do:112113- Describe architecture and module boundaries114- Explain technology choices and trade-offs115- Define data model, API, security, and testing strategy as needed116- Use Mermaid only when a diagram materially improves clarity117118### Phase 3: Tasks119120Create `specs/<spec_name>/tasks.md`.121122What to do:123124- Break the design into executable tasks125- Keep tasks specific and reviewable126- Link each task back to the relevant requirement127- Update task status as work progresses128129Task format:130131```markdown132# Implementation Plan133134- [ ] 1. Task title135 - Specific work item136 - Another concrete step137 - _Requirement: 1138```139140### Phase 4: Execution141142Only start implementation after the user confirms the task plan.143144During execution:145146- Keep task status current147- Finish one meaningful unit at a time148- Preserve traceability from change -> task -> requirement149150## Working rules for the agent1511521. Ask follow-up questions when the request is underspecified; do not guess core product behavior.1532. Require confirmation between requirements, design, and task breakdown.1543. Pull in `ui-design` early when the change includes end-user pages or visual decisions.1554. Keep documents concise but testable.1565. Prefer user-visible outcomes over implementation-detail task names.157158## Output expectations159160- `requirements.md` -> problem, scope, user stories, EARS acceptance criteria161- `design.md` -> architecture, technical approach, data/API/security/test notes162- `tasks.md` -> actionable implementation checklist tied to requirements