Mine Patentable Inventions
Purpose
Help R&D engineers, technical leaders, and IP professionals recognize and structure potential inventions,
test them against public evidence, and decide what technical and IP work should happen next.
The skill addresses:
- recognition bottlenecks: teams do not see what may be protectable;
- expression bottlenecks: ideas are not yet reproducible or technically specific;
- legal-framing bottlenecks: protection angles are unclear;
- direction bottlenecks: teams do not know where to expand or validate;
- portfolio bottlenecks: isolated ideas do not form a coherent protection strategy;
- competitive bottlenecks: competitor rights or designs constrain development.
Professional boundary
This skill:
- does not invent the technology for the engineering team;
- does not replace qualified patent counsel;
- does not guarantee grant, validity, enforceability, FTO, or commercial value;
- does not draft claims before a reproducible technical disclosure exists;
- does not treat a low-density search result as proven white space;
- does not disclose confidential inventions to unapproved services.
Core principles
- Invention mining and portfolio strategy are related but distinct.
- Useful inventions are found through deliberate technical and legal questioning.
- Structured invention generation can be trained and repeated.
- Business, standards, competitor, manufacturing, and market context inform—but do not replace—technical evidence.
- Quality and reproducibility matter more than application count.
Required inputs
Required
tech_domain: defined technology domain;
mining_purpose: one of the scenarios below or an equivalent decision objective;
entity_name: company/team or an approved anonymous label;
- available technical description;
- confidentiality and disclosure constraints.
Optional
own_advantages: technical strengths;
core_innovation: known core concept;
competitor: relevant competitor or technical comparator;
parent_tech: parent technology for cross-domain transfer;
target_patent: only for portfolio-completion, competitor-encirclement, or design-around scenarios;
- application requirements and performance targets;
- experimental, prototype, simulation, manufacturing, or field evidence;
- critical dates, publications, demonstrations, sales, offers, standards submissions, or prior disclosures;
- target jurisdictions and business markets.
Do not request a patent number in ordinary R&D-project mining when it is not needed.
Verified Patsnap MCP services
Use the English interface and English output.
Inspect the live tool schema before calling a connector.
Required: Advanced Patent Search
Required: Patent Briefing
- Connector key:
patent_briefing
- Marketplace: https://open.patsnap.com/marketplace/mcp-servers/patent-briefing
- Official marketplace page:
https://open.patsnap.com/marketplace/mcp-servers/patent-briefing
- Use: bibliography, family, status, claims, description, translations, images,
and technical summaries for relevant patents.
Recommended: Deep Patent Mining
- Connector key:
deep_patent_mining
- Marketplace: https://open.patsnap.com/marketplace/mcp-servers/patent-mining
- Official marketplace page:
https://open.patsnap.com/marketplace/mcp-servers/patent-mining
- Use: technical problems, solutions, effects, topics, classifications, materials,
and application-domain evidence.
Use authoritative approved sources for:
- scientific and engineering literature;
- standards and standards proposals;
- products and manuals;
- current statutes, examination guidance, and case law;
- market and company facts.
Replace generic source labels with stable evidence records:
evidence_id
source_type
publisher_or_connector
title_or_record
date
retrieved_at
URL_or_locator
evidence_scope
feature_or_claim_ids
confidence
limitations
Two operating modes
Quick mode — default when the input is sufficiently specific
- Produce the preflight confirmation card.
- If the user has already explicitly delegated the full workflow or said “proceed,” record approval.
- After approval, run Blocks 1–3 continuously.
- Mark uncertainty and continue when noncritical information is missing.
- Before Block 4, confirm whether to create the roadmap and complete report unless that deliverable was already delegated.
Deep mode
Use when the user requests a complete, formal, or detailed analysis, or specifies mode=deep.
- Produce and approve the preflight confirmation card.
- Stop after each Block for review unless the user explicitly delegates continuous execution.
- Preserve every checkpoint decision.
- Generate the complete HTML report after CP-4.
Mode-switch rule
If the user changes the technical domain, purpose, or material scope, return to scenario identification and CP-0.
Engineering-language rule
Use technical language in:
- the technology tree;
- invention directions;
- competitor analysis;
- innovation cards;
- project recommendations;
- final report narrative.
Patent classification codes may appear only in the search-methodology section and must include
a plain-language definition, for example:
H10K 50 (organic light-emitting device structures)
Do not expose unexplained classification codes to engineering users.
Prohibited behavior
- Do not fabricate patent numbers, applicants, classifications, citations, experiments, products, or search results.
- Do not give a patentability or grant conclusion without prior-art analysis.
- Do not draft a claim framework before the invention is structured and reproducible.
- Do not fill missing parameters, results, competitor facts, or examples with generic invention-like prose.
- Do not force competitor-encirclement or design-around concepts into patent filing when they are technically inferior or uneconomic.
- Do not display unexplained patent classifications outside search methodology.
- Do not begin Block 1 before CP-0 approval unless the user has already explicitly approved direct execution.
- Do not omit the approved CP-0 project fields from the final project overview.
- Do not expose confidential verbatim user text beyond what is necessary for traceability and authorized reporting.
- Do not treat a patent search as a complete legal or scientific search without documented scope and limitations.
Step 1 — Identify the mining scenario
Classify the request into one of nine source scenarios.
Scenario 1 — R&D project mining
Question: What potentially patentable units exist in the current project?
Likely bottlenecks:
- recognition: the team thinks ongoing work is ordinary;
- expression: technical differences are hard to articulate.
Scenario 2 — Expand around a core innovation
Question: How can protection extend around a high-value technical concept?
Likely bottlenecks:
- portfolio: the team assumes one filing exhausts the opportunity;
- direction: downstream, upstream, implementation, and application variants are unclear.
Scenario 3 — Standards-oriented invention mining
Question: How can a standards contribution and patent strategy be coordinated lawfully and on time?
Likely bottlenecks:
- legal: standards and patents are treated as unrelated;
- direction: disclosure, filing, contribution, licensing, and competition-law timing is unclear.
Require current standards-development rules, IPR policy, disclosure obligations, meeting/publication dates,
contribution history, and counsel review. Do not promise standard-essential status.
Scenario 4 — Technical improvement mining
Question: Which fixes, parameter changes, control changes, or manufacturing improvements contain reproducible invention value?
Likely bottlenecks:
- recognition: a bug fix or parameter change appears too small;
- expression: before/after conditions and effects are not quantified.
Scenario 5 — Complete an existing patent portfolio
Question: Where are the technical and claim-coverage gaps around existing rights?
Likely bottlenecks:
- portfolio: gaps and dependencies are unclear;
- competitive: likely design-around routes are unknown.
Scenario 6 — Develop alternatives around a competitor patent
Question: Which technically credible alternative paths create differentiation and negotiating options?
Likely bottlenecks:
- competitive: the target patent appears unavoidable;
- direction: substitute structures, functions, processes, materials, controls, and applications are unclear.
Route detailed work to develop-patent-design-arounds-ip or design-around-multiple-patents-ip if installed.
Scenario 7 — Design around infringement risk
Question: Can a product be redesigned while retaining required performance and generating protectable improvements?
Likely bottlenecks:
- competitive: performance may degrade;
- direction: claim-feature and product-feature alternatives are unclear.
This scenario requires jurisdiction, claim version, product facts, relevant date, prosecution history,
requirements, and counsel review.
Scenario 8 — Cross-domain technology transfer
Question: How can a mature parent technology be adapted to a new domain or operating environment?
Likely bottlenecks:
- direction: technical equivalence and transfer path are unclear;
- expression: adaptation logic, secondary problems, and new effects are not reproducible.
Scenario 9 — Emerging opportunity hypothesis
Question: Which foundational technical directions may merit early research and filing work?
Likely bottlenecks:
- recognition: evidence and experiments are immature;
- direction: the apparent gap and feasible breadth are uncertain.
Call it an opportunity hypothesis, not a white space, until negative search, adjacent-art,
technical feasibility, market/need, and legal review are complete.
If no scenario fits
Ask for tech_domain and mining_purpose, plus one or two facts that materially affect the workflow.
Bottleneck taxonomy
| Bottleneck |
Typical symptom |
Mining response |
| Entry |
Work exists but the team cannot identify protectable units |
Map technical changes, decisions, and effects |
| Recognition |
The team sees no meaningful invention |
Establish baseline, comparator, constraint, and measurable difference |
| Direction |
A broad idea lacks implementable paths |
Decompose functions, mechanisms, resources, and validation routes |
| Competitive |
Competitor rights or products constrain action |
Map evidence, claim/product facts, alternatives, and design requirements |
| Expression |
A concept is not reproducible |
Capture structure, sequence, materials, parameters, conditions, and effects |
| Legal framing |
Protection angle is unclear |
Compare method, apparatus, system, composition, use, control, and manufacturing disclosures |
| Portfolio |
One filing does not form a coherent position |
Map core, implementation, application, manufacturing, monitoring, and fallback layers |
CP-0 — Preflight confirmation card
The first workflow output is:
Invention Mining Preflight Card
Mining scenario: [scenario]
Operating mode: [Quick or Deep, with explanation]
Project entity: [authorized name or anonymous label]
Likely bottlenecks: [list with concise rationale]
Proposed technical workstreams:
- Workstream 1: [...]
- Workstream 2: [...]
- Workstream N: [...]
Confidentiality/disclosure constraints: [...]
Target jurisdictions or decision context: [...]
Please confirm or correct this scope before Block 1.
If information is missing, add:
Material information needed: [one or two items]
If already authorized to proceed, missing noncritical fields will remain Unresolved and will not be invented.
CP-0 approval logic
- If the user confirms, corrects, says “proceed,” “continue,” or “do it directly,” record approval.
- If the initial request already expressly delegates the complete workflow without per-step confirmation,
record that instruction as approval and do not ask redundantly.
- If a missing choice would materially change scope, confidentiality, jurisdiction, or external disclosure,
obtain it before Block 1.
- Otherwise stop after the card until approval.
CP-0 snapshot
Record:
confirm_mining_type
confirm_mining_mode
confirm_entity
confirm_pain_points
confirm_tech_lines
confirm_user_extra
approval_text_or_instruction
approval_timestamp
confidentiality_constraints
Preserve meaning and traceability.
Quote verbatim user text in the report only where authorized and necessary; otherwise retain a faithful,
privacy-minimized project record and a source locator.
Four blocks and ten steps
Block 1 — Technical decomposition
Step 1 — Patent and technical scan
Use the user’s scope to search:
- recent five-year activity for current competitive context;
- older and non-patent evidence needed for prior-art and technical baseline;
- key applicants and inventors;
- technically dense directions;
- apparent sparse directions requiring further validation;
- standards, products, literature, and public disclosures where relevant;
- citations and related families for important records.
The five-year window is a recent-activity view, not the complete prior-art period.
Search strategy
Record:
- English and other relevant-language keywords;
- technical classifications with plain-language definitions;
- field restrictions;
- applicants and aliases;
- dates and relevant prior-art cutoff;
- exclusions and false-positive controls;
- jurisdictions and databases;
- family/count rule;
- query version and retrieval date;
- matched totals and sample boundaries;
- known limitations.
Do not calculate landscape statistics from a relevance-ranked sample.
Step 2 — Decompose the technology
Break the project or problem domain into the smallest reproducible candidate invention units.
Possible branches:
R&D project
├── Product/components
│ ├── geometry and structure
│ ├── materials and compositions
│ ├── interfaces and relationships
│ ├── sensing and control
│ ├── manufacturing tools
│ └── manufacturing processes
├── System
│ ├── architecture
│ ├── workflow or method
│ ├── data and algorithms
│ ├── assembly and calibration
│ └── operation and maintenance
└── Application and lifecycle
├── use scenarios
├── performance adaptation
├── diagnostics and monitoring
├── recycling or end-of-life
└── safety, standards, and compliance
For every node capture:
node_id
technical_description
baseline_or_comparator
change_or_decision
problem
mechanism
expected_effect
evidence
requirements
dependencies
uncertainty
CP-1 — Block 1 self-check
- Search terms, classifications, fields, dates, and query versions are documented.
- Key technical and commercial comparators are evidence-backed.
- Dense and apparently sparse directions are qualified by search scope.
- The technical tree uses engineering language.
- At least three potential problem points are identified when the evidence supports them.
- Confidential data handling remains authorized.
Quick mode proceeds automatically after approval when CP-1 passes.
Deep mode pauses for Block 1 review unless continuous execution was delegated.
Missing information becomes an explicit evidence gap; do not fabricate it.
Block 2 — Form invention concepts
Step 3 — Identify and prioritize problems
Find problems from:
- unmet requirements;
- failure modes and defects;
- excess cost, energy, size, mass, time, or complexity;
- unstable control or poor reliability;
- material, manufacturing, assembly, calibration, or supply constraints;
- safety, usability, standards, or regulatory constraints;
- competitor/claim limitations;
- unserved applications or environments;
- integration and lifecycle issues.
Problem record:
problem_id
technical_tree_node
problem_statement
baseline
cause_hypothesis
affected_requirement
severity
frequency
strategic_relevance
evidence_ids
priority: P0 | P1 | P2
owner
uncertainty
Step 4 — Develop solution concepts
Use appropriate methods such as:
- TRIZ;
- functional analysis;
- contradiction mapping;
- function-effect search;
- morphological analysis;
- controlled brainstorming;
- cross-domain analogies;
- design of experiments;
- failure-mode analysis;
- manufacturing and lifecycle analysis.
For every P0/P1 problem create at least one defensible concept when possible.
Concept record:
concept_id
problem_id
solution_principle
structure_or_steps
materials_or_components
relationships
parameters_and_ranges
operating_conditions
control_logic
expected_effect
effect_measurement
secondary_problems
alternatives
evidence_ids
technical_readiness
missing_information
Do not invent quantitative effects.
If an effect is untested, label it as a hypothesis and define the experiment.
CP-2 — Block 2 self-check
- Problems are P0/P1/P2 and linked to technical-tree nodes.
- Every P0/P1 problem has a concept or an explicit reason it does not.
- Every concept has a mechanism and expected effect.
- Quantification is evidence-backed or clearly a test target.
- Reproducibility gaps are explicit.
Quick mode proceeds to Block 3 when CP-2 passes.
Deep mode pauses unless continuous execution was delegated.
Block 3 — Evaluate invention concepts
Step 5 — Establish the relevant public baseline and prior art
Search:
- patents and patent families;
- scientific literature;
- conference materials;
- standards and standards contributions;
- product manuals, catalogs, webpages, and public use/sale evidence;
- theses, technical reports, regulatory documents, and other applicable sources.
Record for each reference:
reference_id
source_type
title_or_identifier
publisher_or_owner
priority_or_publication_date
public_availability_date
jurisdiction_or_database
URL_or_locator
relevant_features
concept_ids
feature_mapping
relevance
limitations
Determine the applicable critical date and legal rules with qualified counsel.
Do not limit patentability searching to five recent years.
Step 6 — Screen patentability and differentiation
Assess, as applicable:
- novelty;
- inventive step/nonobviousness;
- utility/industrial applicability;
- eligibility/patentable subject matter;
- enablement, support, written description, clarity, and definiteness;
- unity/restriction and claim-category strategy;
- ownership, inventorship, entitlement, and disclosure timing.
Use evidence states:
- feature overlap: High / Medium / Low / Unresolved;
- differentiation space: Clear / Limited / Unresolved;
- disclosure support: Adequate / Partial / Insufficient / Unresolved;
- evidence confidence: High / Medium / Low.
Do not state “grant prospects are good/bad.”
Recommend experiments, clarification, route changes, or further search.
Step 7 — Conditional infringement-risk screen
Run only for:
- competitor-patent alternatives;
- design-around work;
- portfolio-completion work where product use is in scope.
Require:
- target jurisdiction;
- authoritative claim version;
- relevant date and status;
- product/process facts;
- claim construction assumptions;
- prosecution/post-grant history;
- counsel review.
Use claim-feature states Present, Absent, Unclear, or Disputed.
Use overall screening states High, Medium, Low, or Unresolved with evidence and limitations.
Never call a concept non-infringing.
Step 8 — Conditional design-around work
For high or unresolved risk, consider:
- trimming/removal;
- substitution;
- combination or reallocation;
- decomposition;
- changed principle or architecture;
- changed actor, sequence, material, control, or operating environment.
Route detailed work to an installed design-around skill when appropriate.
If the alternative fails requirements or is uneconomic, recommend redesign or no filing.
Step 9 — Extract innovation points
Evaluate each concept across:
Technical dimension
- problem specificity;
- mechanism clarity;
- reproducibility;
- measured or testable effect;
- alternatives and fallback embodiments;
- technical readiness.
Legal/IP dimension
- prior-art differentiation;
- disclosure support;
- claim-category options;
- detectability and enforceability hypotheses;
- design-around resilience;
- ownership/inventorship and public-disclosure risks.
Business/strategy dimension
- product and roadmap relevance;
- standards or regulatory relevance;
- competitive leverage;
- secrecy versus patent tradeoff;
- lifecycle and jurisdiction relevance;
- cost and time to validate.
Innovation card:
innovation_id
concept_id
title
problem
solution
technical_effect
essential_features
optional_features
alternatives
evidence_ids
prior_art_difference
disclosure_support
patentability_questions
infringement_questions
business_relevance
validation_need
confidence
CP-3 — Block 3 self-check
- Innovation-point register exists.
- Prior-art references have traceable evidence IDs and dates.
- Each concept has a feature-level comparison.
- Search blind spots and unavailable sources are explicit.
- No unsupported patentability or infringement conclusion appears.
After CP-3, quick and deep modes pause before Block 4 unless roadmap/report execution was already delegated.
Block 4 — Decide next actions
Step 10 — Route each innovation and build a six-month roadmap
Disposition states:
File promptly
Use only when disclosure, evidence, ownership, dates, and business need support prompt counsel action.
Refine and validate
Use when experiments, parameters, embodiments, alternatives, or searches are missing.
Incubate
Use when direction is strategically useful but technical readiness is low.
Consider trade-secret protection
Evaluate:
- information secrecy;
- independent economic value from secrecy;
- reasonable measures;
- employee/vendor controls;
- detectability and reverse engineering;
- patent disclosure tradeoffs;
- duration and mobility of know-how;
- ownership and jurisdiction.
Do not pursue
Use when the concept is public, trivial, unsupported, technically inferior, uneconomic,
misaligned, or creates unacceptable risk.
For each innovation record:
innovation_id
disposition
rationale
owner
target_date
dependency
required_evidence
counsel_action
confidentiality_action
success_criterion
Six-month roadmap
Include:
- month or date range;
- innovation IDs;
- technical experiments;
- search and legal review;
- inventorship/ownership review;
- disclosure-control action;
- drafting/filling or secrecy decision;
- portfolio/standards/business coordination;
- owner;
- milestone and gate.
Dates and owners are proposed until the user confirms them.
CP-4 — Final self-check
- Every innovation has a disposition.
- Owner and target date are present or explicitly Unassigned.
- Six-month roadmap exists.
- CP-0 project fields appear faithfully in the project overview.
- Confidential text is handled according to approval and minimization rules.
- All unresolved patent, legal, technical, and business questions remain visible.
Mandatory project overview
The final report begins, after title and metadata, with:
| Field |
Source |
| Mining scenario |
confirm_mining_type |
| Operating mode |
confirm_mining_mode |
| Project entity |
confirm_entity |
| Likely bottlenecks |
confirm_pain_points |
| Technical workstreams |
confirm_tech_lines |
| User additions and constraints |
confirm_user_extra |
| Approval record |
approval_text_or_instruction and timestamp |
| Confidentiality controls |
confidentiality_constraints |
Preserve the approved meaning and all material facts.
Use exact quotation only where authorized and necessary; otherwise use a faithful privacy-minimized record
with a locator to the approved source interaction.
Output formats
Conversational and quick-mode output
Use Markdown:
- preflight confirmation card;
- technical tree as an indented tree or accessible diagram;
- search/evidence register;
- problem and concept tables;
- innovation cards;
- roadmap table;
- progress and next gate.
Complete report
Generate one self-contained light HTML file when requested.
Required sections:
- title and metadata;
- mandatory project overview;
- scope, mode, confidentiality, and evidence boundaries;
- patent and technical scan;
- technical tree;
- problem register;
- invention concepts;
- prior-art and feature mappings;
- patentability/differentiation screen;
- conditional infringement/design-around analysis;
- innovation cards and dispositions;
- six-month roadmap;
- sources, limitations, approvals, and next actions.
HTML visual system
- white or light-neutral background;
- navy/slate hierarchy;
- restrained teal accent;
- system fonts;
- semantic headings, tables, forms, and navigation;
- technical tree as accessible HTML/CSS or static SVG with a table equivalent;
- roadmap as a table with responsive overflow;
- evidence and uncertainty in text;
- visible keyboard focus;
- print CSS and repeated table headers;
- escaped untrusted text and allowlisted HTTP(S) links;
- no remote dependency, gradient, dark background, star rating, or emoji-only state.
Multi-turn management
Progress memory
At each pause, state:
- approved scope and mode;
- completed Block and checkpoint;
- unresolved information;
- next action and whether approval is required.
Scenario switch
If the technology domain or purpose changes materially, return to Step 1 and create a new CP-0 snapshot.
Rollback
If the user says “return to the previous step” or “restart from Block X,” preserve prior evidence,
mark superseded decisions, and restart from the requested point.
Direct progression
If the user says “proceed,” “continue,” “no confirmation,” or delegates all Blocks,
record the instruction and advance through non-material checkpoints without redundant questions.
Do not bypass a confidentiality, jurisdiction, authorization, or scope choice that materially changes the work.
Quality gates
QG-01 — Evidence integrity
- No patent, applicant, reference, classification, product, experiment, or search result is invented.
- Every source has an evidence ID, date, locator, and scope.
- Search samples and complete populations are labelled separately.
QG-02 — Technical specificity
- Problems, mechanisms, structures/steps, parameters, conditions, effects, and alternatives are captured.
- Untested effects are hypotheses with test plans.
- Claim drafting does not begin before reproducibility.
QG-03 — Prior-art and dates
- Critical dates are identified or Unresolved.
- Search extends beyond the recent activity window.
- Patent and non-patent evidence is mapped feature by feature.
- Public availability and translation uncertainty are reviewed.
QG-04 — Legal calibration
- Destination patentability rules are current and source-backed.
- Patentability is a provisional screen, not a grant prediction.
- Conditional infringement/design-around work is jurisdiction-, claim-, date-, and fact-specific.
- Ownership, inventorship, disclosure, eligibility, and secrecy issues are visible.
QG-05 — Workflow parity
- Nine scenarios and seven bottlenecks remain available.
- Two modes remain available.
- CP-0 through CP-4 are recorded.
- Blocks 1–4 and Steps 1–10 are complete or have explicit unavailable reasons.
- CP-0 project fields reconcile with the final overview.
QG-06 — Classification language
- Classification codes appear only in search methodology with plain-language definitions.
- Technical trees, recommendations, and report prose use engineering language.
QG-07 — Actionability
- Every innovation has evidence, confidence, validation, disposition, owner, target date, and gate.
- The roadmap includes technical, search, counsel, ownership, confidentiality, and business actions.
QG-08 — Privacy and security
- Confidential invention text is shared only with approved tools and audiences.
- User quotations are minimized and authorized.
- No secret or unpublished matter appears in reusable package text or an unintended report.
QG-09 — Report quality
- Markdown and HTML agree.
- HTML is offline, semantic, accessible, responsive, print-ready, and safely escaped.
- Evidence, limitations, approvals, and unresolved items are visible.
Failure handling
If the input lacks a technical mechanism, remain at CP-0 and request the material facts.
If the user withholds a company name, use an approved anonymous label.
If the search is unavailable, provide a preparation framework and mark patentability screening blocked.
If prior-art dates are unclear, do not issue a novelty screen.
If the invention is not reproducible, return to Block 2 and define experiments or disclosure needs.
If a design-around concept fails requirements, recommend product redesign or no filing.
If ownership or public disclosure is uncertain, escalate promptly to counsel.
If fewer concepts exist than a template suggests, report the defensible set rather than fabricate.
Reference and authority discipline
The source package names several invention-mining and patent-practice books, but does not bundle their text.
Do not claim to have applied a named book unless it was actually accessed and reviewed.
For execution, prioritize:
- current official patent-office examination guidance;
- current statutes, rules, and relevant primary legal authority;
- WIPO and standards-organization materials where applicable;
- reviewed engineering and scientific evidence;
- qualified local patent counsel.
Final response
State:
- approved scenario, mode, entity label, and technical workstreams;
- Blocks and checkpoints completed;
- number of problem, concept, reference, and innovation records;
- strongest evidence-backed differentiation;
- most important technical, legal, disclosure, or search gap;
- dispositions and six-month priority actions;
- report path when created;
- exact counsel, engineering, ownership, confidentiality, or standards review required.
1---2name: mine-patentable-inventions-ip3description: Identify, structure, screen, and route potentially patentable inventions from R&D projects, technical improvements, standards work, existing innovations or portfolios, competitor patents, design-around needs, cross-domain technology transfer, or emerging opportunity hypotheses. Use when engineers or IP teams need a quick or deep four-block, ten-step invention-mining workflow with patent/prior-art evidence, checkpoints, innovation cards, a six-month roadmap, and Markdown or HTML reporting.4---56# Mine Patentable Inventions78## Purpose910Help R&D engineers, technical leaders, and IP professionals recognize and structure potential inventions,11test them against public evidence, and decide what technical and IP work should happen next.1213The skill addresses:1415- recognition bottlenecks: teams do not see what may be protectable;16- expression bottlenecks: ideas are not yet reproducible or technically specific;17- legal-framing bottlenecks: protection angles are unclear;18- direction bottlenecks: teams do not know where to expand or validate;19- portfolio bottlenecks: isolated ideas do not form a coherent protection strategy;20- competitive bottlenecks: competitor rights or designs constrain development.2122## Professional boundary2324This skill:2526- does not invent the technology for the engineering team;27- does not replace qualified patent counsel;28- does not guarantee grant, validity, enforceability, FTO, or commercial value;29- does not draft claims before a reproducible technical disclosure exists;30- does not treat a low-density search result as proven white space;31- does not disclose confidential inventions to unapproved services.3233## Core principles34351. Invention mining and portfolio strategy are related but distinct.362. Useful inventions are found through deliberate technical and legal questioning.373. Structured invention generation can be trained and repeated.384. Business, standards, competitor, manufacturing, and market context inform—but do not replace—technical evidence.395. Quality and reproducibility matter more than application count.4041## Required inputs4243### Required4445- `tech_domain`: defined technology domain;46- `mining_purpose`: one of the scenarios below or an equivalent decision objective;47- `entity_name`: company/team or an approved anonymous label;48- available technical description;49- confidentiality and disclosure constraints.5051### Optional5253- `own_advantages`: technical strengths;54- `core_innovation`: known core concept;55- `competitor`: relevant competitor or technical comparator;56- `parent_tech`: parent technology for cross-domain transfer;57- `target_patent`: only for portfolio-completion, competitor-encirclement, or design-around scenarios;58- application requirements and performance targets;59- experimental, prototype, simulation, manufacturing, or field evidence;60- critical dates, publications, demonstrations, sales, offers, standards submissions, or prior disclosures;61- target jurisdictions and business markets.6263Do not request a patent number in ordinary R&D-project mining when it is not needed.6465## Verified Patsnap MCP services6667Use the English interface and English output.68Inspect the live tool schema before calling a connector.6970### Required: Advanced Patent Search7172- Connector key: `advanced_patent_search`73- Marketplace: https://open.patsnap.com/marketplace/mcp-servers/patent-search74- Official marketplace page: `https://open.patsnap.com/marketplace/mcp-servers/patent-search`75- Use: landscape, assignee, citation, novelty, and prior-art searches.7677### Required: Patent Briefing7879- Connector key: `patent_briefing`80- Marketplace: https://open.patsnap.com/marketplace/mcp-servers/patent-briefing81- Official marketplace page: `https://open.patsnap.com/marketplace/mcp-servers/patent-briefing`82- Use: bibliography, family, status, claims, description, translations, images,83 and technical summaries for relevant patents.8485### Recommended: Deep Patent Mining8687- Connector key: `deep_patent_mining`88- Marketplace: https://open.patsnap.com/marketplace/mcp-servers/patent-mining89- Official marketplace page: `https://open.patsnap.com/marketplace/mcp-servers/patent-mining`90- Use: technical problems, solutions, effects, topics, classifications, materials,91 and application-domain evidence.9293Use authoritative approved sources for:9495- scientific and engineering literature;96- standards and standards proposals;97- products and manuals;98- current statutes, examination guidance, and case law;99- market and company facts.100101Replace generic source labels with stable evidence records:102103```text104evidence_id105source_type106publisher_or_connector107title_or_record108date109retrieved_at110URL_or_locator111evidence_scope112feature_or_claim_ids113confidence114limitations115```116117## Two operating modes118119### Quick mode — default when the input is sufficiently specific1201211. Produce the preflight confirmation card.1222. If the user has already explicitly delegated the full workflow or said “proceed,” record approval.1233. After approval, run Blocks 1–3 continuously.1244. Mark uncertainty and continue when noncritical information is missing.1255. Before Block 4, confirm whether to create the roadmap and complete report unless that deliverable was already delegated.126127### Deep mode128129Use when the user requests a complete, formal, or detailed analysis, or specifies `mode=deep`.1301311. Produce and approve the preflight confirmation card.1322. Stop after each Block for review unless the user explicitly delegates continuous execution.1333. Preserve every checkpoint decision.1344. Generate the complete HTML report after CP-4.135136### Mode-switch rule137138If the user changes the technical domain, purpose, or material scope, return to scenario identification and CP-0.139140## Engineering-language rule141142Use technical language in:143144- the technology tree;145- invention directions;146- competitor analysis;147- innovation cards;148- project recommendations;149- final report narrative.150151Patent classification codes may appear only in the search-methodology section and must include152a plain-language definition, for example:153154```text155H10K 50 (organic light-emitting device structures)156```157158Do not expose unexplained classification codes to engineering users.159160## Prohibited behavior1611621. Do not fabricate patent numbers, applicants, classifications, citations, experiments, products, or search results.1632. Do not give a patentability or grant conclusion without prior-art analysis.1643. Do not draft a claim framework before the invention is structured and reproducible.1654. Do not fill missing parameters, results, competitor facts, or examples with generic invention-like prose.1665. Do not force competitor-encirclement or design-around concepts into patent filing when they are technically inferior or uneconomic.1676. Do not display unexplained patent classifications outside search methodology.1687. Do not begin Block 1 before CP-0 approval unless the user has already explicitly approved direct execution.1698. Do not omit the approved CP-0 project fields from the final project overview.1709. Do not expose confidential verbatim user text beyond what is necessary for traceability and authorized reporting.17110. Do not treat a patent search as a complete legal or scientific search without documented scope and limitations.172173## Step 1 — Identify the mining scenario174175Classify the request into one of nine source scenarios.176177### Scenario 1 — R&D project mining178179Question: What potentially patentable units exist in the current project?180181Likely bottlenecks:182183- recognition: the team thinks ongoing work is ordinary;184- expression: technical differences are hard to articulate.185186### Scenario 2 — Expand around a core innovation187188Question: How can protection extend around a high-value technical concept?189190Likely bottlenecks:191192- portfolio: the team assumes one filing exhausts the opportunity;193- direction: downstream, upstream, implementation, and application variants are unclear.194195### Scenario 3 — Standards-oriented invention mining196197Question: How can a standards contribution and patent strategy be coordinated lawfully and on time?198199Likely bottlenecks:200201- legal: standards and patents are treated as unrelated;202- direction: disclosure, filing, contribution, licensing, and competition-law timing is unclear.203204Require current standards-development rules, IPR policy, disclosure obligations, meeting/publication dates,205contribution history, and counsel review. Do not promise standard-essential status.206207### Scenario 4 — Technical improvement mining208209Question: Which fixes, parameter changes, control changes, or manufacturing improvements contain reproducible invention value?210211Likely bottlenecks:212213- recognition: a bug fix or parameter change appears too small;214- expression: before/after conditions and effects are not quantified.215216### Scenario 5 — Complete an existing patent portfolio217218Question: Where are the technical and claim-coverage gaps around existing rights?219220Likely bottlenecks:221222- portfolio: gaps and dependencies are unclear;223- competitive: likely design-around routes are unknown.224225### Scenario 6 — Develop alternatives around a competitor patent226227Question: Which technically credible alternative paths create differentiation and negotiating options?228229Likely bottlenecks:230231- competitive: the target patent appears unavoidable;232- direction: substitute structures, functions, processes, materials, controls, and applications are unclear.233234Route detailed work to `develop-patent-design-arounds-ip` or `design-around-multiple-patents-ip` if installed.235236### Scenario 7 — Design around infringement risk237238Question: Can a product be redesigned while retaining required performance and generating protectable improvements?239240Likely bottlenecks:241242- competitive: performance may degrade;243- direction: claim-feature and product-feature alternatives are unclear.244245This scenario requires jurisdiction, claim version, product facts, relevant date, prosecution history,246requirements, and counsel review.247248### Scenario 8 — Cross-domain technology transfer249250Question: How can a mature parent technology be adapted to a new domain or operating environment?251252Likely bottlenecks:253254- direction: technical equivalence and transfer path are unclear;255- expression: adaptation logic, secondary problems, and new effects are not reproducible.256257### Scenario 9 — Emerging opportunity hypothesis258259Question: Which foundational technical directions may merit early research and filing work?260261Likely bottlenecks:262263- recognition: evidence and experiments are immature;264- direction: the apparent gap and feasible breadth are uncertain.265266Call it an opportunity hypothesis, not a white space, until negative search, adjacent-art,267technical feasibility, market/need, and legal review are complete.268269### If no scenario fits270271Ask for `tech_domain` and `mining_purpose`, plus one or two facts that materially affect the workflow.272273## Bottleneck taxonomy274275| Bottleneck | Typical symptom | Mining response |276|---|---|---|277| Entry | Work exists but the team cannot identify protectable units | Map technical changes, decisions, and effects |278| Recognition | The team sees no meaningful invention | Establish baseline, comparator, constraint, and measurable difference |279| Direction | A broad idea lacks implementable paths | Decompose functions, mechanisms, resources, and validation routes |280| Competitive | Competitor rights or products constrain action | Map evidence, claim/product facts, alternatives, and design requirements |281| Expression | A concept is not reproducible | Capture structure, sequence, materials, parameters, conditions, and effects |282| Legal framing | Protection angle is unclear | Compare method, apparatus, system, composition, use, control, and manufacturing disclosures |283| Portfolio | One filing does not form a coherent position | Map core, implementation, application, manufacturing, monitoring, and fallback layers |284285## CP-0 — Preflight confirmation card286287The first workflow output is:288289```text290Invention Mining Preflight Card291292Mining scenario: [scenario]293Operating mode: [Quick or Deep, with explanation]294Project entity: [authorized name or anonymous label]295Likely bottlenecks: [list with concise rationale]296Proposed technical workstreams:297 - Workstream 1: [...]298 - Workstream 2: [...]299 - Workstream N: [...]300Confidentiality/disclosure constraints: [...]301Target jurisdictions or decision context: [...]302303Please confirm or correct this scope before Block 1.304```305306If information is missing, add:307308```text309Material information needed: [one or two items]310If already authorized to proceed, missing noncritical fields will remain Unresolved and will not be invented.311```312313### CP-0 approval logic314315- If the user confirms, corrects, says “proceed,” “continue,” or “do it directly,” record approval.316- If the initial request already expressly delegates the complete workflow without per-step confirmation,317 record that instruction as approval and do not ask redundantly.318- If a missing choice would materially change scope, confidentiality, jurisdiction, or external disclosure,319 obtain it before Block 1.320- Otherwise stop after the card until approval.321322### CP-0 snapshot323324Record:325326```text327confirm_mining_type328confirm_mining_mode329confirm_entity330confirm_pain_points331confirm_tech_lines332confirm_user_extra333approval_text_or_instruction334approval_timestamp335confidentiality_constraints336```337338Preserve meaning and traceability.339Quote verbatim user text in the report only where authorized and necessary; otherwise retain a faithful,340privacy-minimized project record and a source locator.341342## Four blocks and ten steps343344## Block 1 — Technical decomposition345346### Step 1 — Patent and technical scan347348Use the user’s scope to search:349350- recent five-year activity for current competitive context;351- older and non-patent evidence needed for prior-art and technical baseline;352- key applicants and inventors;353- technically dense directions;354- apparent sparse directions requiring further validation;355- standards, products, literature, and public disclosures where relevant;356- citations and related families for important records.357358The five-year window is a recent-activity view, not the complete prior-art period.359360#### Search strategy361362Record:363364- English and other relevant-language keywords;365- technical classifications with plain-language definitions;366- field restrictions;367- applicants and aliases;368- dates and relevant prior-art cutoff;369- exclusions and false-positive controls;370- jurisdictions and databases;371- family/count rule;372- query version and retrieval date;373- matched totals and sample boundaries;374- known limitations.375376Do not calculate landscape statistics from a relevance-ranked sample.377378### Step 2 — Decompose the technology379380Break the project or problem domain into the smallest reproducible candidate invention units.381382Possible branches:383384```text385R&D project386├── Product/components387│ ├── geometry and structure388│ ├── materials and compositions389│ ├── interfaces and relationships390│ ├── sensing and control391│ ├── manufacturing tools392│ └── manufacturing processes393├── System394│ ├── architecture395│ ├── workflow or method396│ ├── data and algorithms397│ ├── assembly and calibration398│ └── operation and maintenance399└── Application and lifecycle400 ├── use scenarios401 ├── performance adaptation402 ├── diagnostics and monitoring403 ├── recycling or end-of-life404 └── safety, standards, and compliance405```406407For every node capture:408409```text410node_id411technical_description412baseline_or_comparator413change_or_decision414problem415mechanism416expected_effect417evidence418requirements419dependencies420uncertainty421```422423### CP-1 — Block 1 self-check424425- Search terms, classifications, fields, dates, and query versions are documented.426- Key technical and commercial comparators are evidence-backed.427- Dense and apparently sparse directions are qualified by search scope.428- The technical tree uses engineering language.429- At least three potential problem points are identified when the evidence supports them.430- Confidential data handling remains authorized.431432Quick mode proceeds automatically after approval when CP-1 passes.433Deep mode pauses for Block 1 review unless continuous execution was delegated.434Missing information becomes an explicit evidence gap; do not fabricate it.435436## Block 2 — Form invention concepts437438### Step 3 — Identify and prioritize problems439440Find problems from:441442- unmet requirements;443- failure modes and defects;444- excess cost, energy, size, mass, time, or complexity;445- unstable control or poor reliability;446- material, manufacturing, assembly, calibration, or supply constraints;447- safety, usability, standards, or regulatory constraints;448- competitor/claim limitations;449- unserved applications or environments;450- integration and lifecycle issues.451452Problem record:453454```text455problem_id456technical_tree_node457problem_statement458baseline459cause_hypothesis460affected_requirement461severity462frequency463strategic_relevance464evidence_ids465priority: P0 | P1 | P2466owner467uncertainty468```469470### Step 4 — Develop solution concepts471472Use appropriate methods such as:473474- TRIZ;475- functional analysis;476- contradiction mapping;477- function-effect search;478- morphological analysis;479- controlled brainstorming;480- cross-domain analogies;481- design of experiments;482- failure-mode analysis;483- manufacturing and lifecycle analysis.484485For every P0/P1 problem create at least one defensible concept when possible.486487Concept record:488489```text490concept_id491problem_id492solution_principle493structure_or_steps494materials_or_components495relationships496parameters_and_ranges497operating_conditions498control_logic499expected_effect500effect_measurement501secondary_problems502alternatives503evidence_ids504technical_readiness505missing_information506```507508Do not invent quantitative effects.509If an effect is untested, label it as a hypothesis and define the experiment.510511### CP-2 — Block 2 self-check512513- Problems are P0/P1/P2 and linked to technical-tree nodes.514- Every P0/P1 problem has a concept or an explicit reason it does not.515- Every concept has a mechanism and expected effect.516- Quantification is evidence-backed or clearly a test target.517- Reproducibility gaps are explicit.518519Quick mode proceeds to Block 3 when CP-2 passes.520Deep mode pauses unless continuous execution was delegated.521522## Block 3 — Evaluate invention concepts523524### Step 5 — Establish the relevant public baseline and prior art525526Search:527528- patents and patent families;529- scientific literature;530- conference materials;531- standards and standards contributions;532- product manuals, catalogs, webpages, and public use/sale evidence;533- theses, technical reports, regulatory documents, and other applicable sources.534535Record for each reference:536537```text538reference_id539source_type540title_or_identifier541publisher_or_owner542priority_or_publication_date543public_availability_date544jurisdiction_or_database545URL_or_locator546relevant_features547concept_ids548feature_mapping549relevance550limitations551```552553Determine the applicable critical date and legal rules with qualified counsel.554Do not limit patentability searching to five recent years.555556### Step 6 — Screen patentability and differentiation557558Assess, as applicable:559560- novelty;561- inventive step/nonobviousness;562- utility/industrial applicability;563- eligibility/patentable subject matter;564- enablement, support, written description, clarity, and definiteness;565- unity/restriction and claim-category strategy;566- ownership, inventorship, entitlement, and disclosure timing.567568Use evidence states:569570- feature overlap: High / Medium / Low / Unresolved;571- differentiation space: Clear / Limited / Unresolved;572- disclosure support: Adequate / Partial / Insufficient / Unresolved;573- evidence confidence: High / Medium / Low.574575Do not state “grant prospects are good/bad.”576Recommend experiments, clarification, route changes, or further search.577578### Step 7 — Conditional infringement-risk screen579580Run only for:581582- competitor-patent alternatives;583- design-around work;584- portfolio-completion work where product use is in scope.585586Require:587588- target jurisdiction;589- authoritative claim version;590- relevant date and status;591- product/process facts;592- claim construction assumptions;593- prosecution/post-grant history;594- counsel review.595596Use claim-feature states `Present`, `Absent`, `Unclear`, or `Disputed`.597Use overall screening states `High`, `Medium`, `Low`, or `Unresolved` with evidence and limitations.598Never call a concept non-infringing.599600### Step 8 — Conditional design-around work601602For high or unresolved risk, consider:603604- trimming/removal;605- substitution;606- combination or reallocation;607- decomposition;608- changed principle or architecture;609- changed actor, sequence, material, control, or operating environment.610611Route detailed work to an installed design-around skill when appropriate.612If the alternative fails requirements or is uneconomic, recommend redesign or no filing.613614### Step 9 — Extract innovation points615616Evaluate each concept across:617618#### Technical dimension619620- problem specificity;621- mechanism clarity;622- reproducibility;623- measured or testable effect;624- alternatives and fallback embodiments;625- technical readiness.626627#### Legal/IP dimension628629- prior-art differentiation;630- disclosure support;631- claim-category options;632- detectability and enforceability hypotheses;633- design-around resilience;634- ownership/inventorship and public-disclosure risks.635636#### Business/strategy dimension637638- product and roadmap relevance;639- standards or regulatory relevance;640- competitive leverage;641- secrecy versus patent tradeoff;642- lifecycle and jurisdiction relevance;643- cost and time to validate.644645Innovation card:646647```text648innovation_id649concept_id650title651problem652solution653technical_effect654essential_features655optional_features656alternatives657evidence_ids658prior_art_difference659disclosure_support660patentability_questions661infringement_questions662business_relevance663validation_need664confidence665```666667### CP-3 — Block 3 self-check668669- Innovation-point register exists.670- Prior-art references have traceable evidence IDs and dates.671- Each concept has a feature-level comparison.672- Search blind spots and unavailable sources are explicit.673- No unsupported patentability or infringement conclusion appears.674675After CP-3, quick and deep modes pause before Block 4 unless roadmap/report execution was already delegated.676677## Block 4 — Decide next actions678679### Step 10 — Route each innovation and build a six-month roadmap680681Disposition states:682683### File promptly684685Use only when disclosure, evidence, ownership, dates, and business need support prompt counsel action.686687### Refine and validate688689Use when experiments, parameters, embodiments, alternatives, or searches are missing.690691### Incubate692693Use when direction is strategically useful but technical readiness is low.694695### Consider trade-secret protection696697Evaluate:698699- information secrecy;700- independent economic value from secrecy;701- reasonable measures;702- employee/vendor controls;703- detectability and reverse engineering;704- patent disclosure tradeoffs;705- duration and mobility of know-how;706- ownership and jurisdiction.707708### Do not pursue709710Use when the concept is public, trivial, unsupported, technically inferior, uneconomic,711misaligned, or creates unacceptable risk.712713For each innovation record:714715```text716innovation_id717disposition718rationale719owner720target_date721dependency722required_evidence723counsel_action724confidentiality_action725success_criterion726```727728### Six-month roadmap729730Include:731732- month or date range;733- innovation IDs;734- technical experiments;735- search and legal review;736- inventorship/ownership review;737- disclosure-control action;738- drafting/filling or secrecy decision;739- portfolio/standards/business coordination;740- owner;741- milestone and gate.742743Dates and owners are proposed until the user confirms them.744745### CP-4 — Final self-check746747- Every innovation has a disposition.748- Owner and target date are present or explicitly Unassigned.749- Six-month roadmap exists.750- CP-0 project fields appear faithfully in the project overview.751- Confidential text is handled according to approval and minimization rules.752- All unresolved patent, legal, technical, and business questions remain visible.753754## Mandatory project overview755756The final report begins, after title and metadata, with:757758| Field | Source |759|---|---|760| Mining scenario | `confirm_mining_type` |761| Operating mode | `confirm_mining_mode` |762| Project entity | `confirm_entity` |763| Likely bottlenecks | `confirm_pain_points` |764| Technical workstreams | `confirm_tech_lines` |765| User additions and constraints | `confirm_user_extra` |766| Approval record | `approval_text_or_instruction` and timestamp |767| Confidentiality controls | `confidentiality_constraints` |768769Preserve the approved meaning and all material facts.770Use exact quotation only where authorized and necessary; otherwise use a faithful privacy-minimized record771with a locator to the approved source interaction.772773## Output formats774775### Conversational and quick-mode output776777Use Markdown:778779- preflight confirmation card;780- technical tree as an indented tree or accessible diagram;781- search/evidence register;782- problem and concept tables;783- innovation cards;784- roadmap table;785- progress and next gate.786787### Complete report788789Generate one self-contained light HTML file when requested.790791Required sections:7927931. title and metadata;7942. mandatory project overview;7953. scope, mode, confidentiality, and evidence boundaries;7964. patent and technical scan;7975. technical tree;7986. problem register;7997. invention concepts;8008. prior-art and feature mappings;8019. patentability/differentiation screen;80210. conditional infringement/design-around analysis;80311. innovation cards and dispositions;80412. six-month roadmap;80513. sources, limitations, approvals, and next actions.806807### HTML visual system808809- white or light-neutral background;810- navy/slate hierarchy;811- restrained teal accent;812- system fonts;813- semantic headings, tables, forms, and navigation;814- technical tree as accessible HTML/CSS or static SVG with a table equivalent;815- roadmap as a table with responsive overflow;816- evidence and uncertainty in text;817- visible keyboard focus;818- print CSS and repeated table headers;819- escaped untrusted text and allowlisted HTTP(S) links;820- no remote dependency, gradient, dark background, star rating, or emoji-only state.821822## Multi-turn management823824### Progress memory825826At each pause, state:827828- approved scope and mode;829- completed Block and checkpoint;830- unresolved information;831- next action and whether approval is required.832833### Scenario switch834835If the technology domain or purpose changes materially, return to Step 1 and create a new CP-0 snapshot.836837### Rollback838839If the user says “return to the previous step” or “restart from Block X,” preserve prior evidence,840mark superseded decisions, and restart from the requested point.841842### Direct progression843844If the user says “proceed,” “continue,” “no confirmation,” or delegates all Blocks,845record the instruction and advance through non-material checkpoints without redundant questions.846Do not bypass a confidentiality, jurisdiction, authorization, or scope choice that materially changes the work.847848## Quality gates849850### QG-01 — Evidence integrity851852- No patent, applicant, reference, classification, product, experiment, or search result is invented.853- Every source has an evidence ID, date, locator, and scope.854- Search samples and complete populations are labelled separately.855856### QG-02 — Technical specificity857858- Problems, mechanisms, structures/steps, parameters, conditions, effects, and alternatives are captured.859- Untested effects are hypotheses with test plans.860- Claim drafting does not begin before reproducibility.861862### QG-03 — Prior-art and dates863864- Critical dates are identified or Unresolved.865- Search extends beyond the recent activity window.866- Patent and non-patent evidence is mapped feature by feature.867- Public availability and translation uncertainty are reviewed.868869### QG-04 — Legal calibration870871- Destination patentability rules are current and source-backed.872- Patentability is a provisional screen, not a grant prediction.873- Conditional infringement/design-around work is jurisdiction-, claim-, date-, and fact-specific.874- Ownership, inventorship, disclosure, eligibility, and secrecy issues are visible.875876### QG-05 — Workflow parity877878- Nine scenarios and seven bottlenecks remain available.879- Two modes remain available.880- CP-0 through CP-4 are recorded.881- Blocks 1–4 and Steps 1–10 are complete or have explicit unavailable reasons.882- CP-0 project fields reconcile with the final overview.883884### QG-06 — Classification language885886- Classification codes appear only in search methodology with plain-language definitions.887- Technical trees, recommendations, and report prose use engineering language.888889### QG-07 — Actionability890891- Every innovation has evidence, confidence, validation, disposition, owner, target date, and gate.892- The roadmap includes technical, search, counsel, ownership, confidentiality, and business actions.893894### QG-08 — Privacy and security895896- Confidential invention text is shared only with approved tools and audiences.897- User quotations are minimized and authorized.898- No secret or unpublished matter appears in reusable package text or an unintended report.899900### QG-09 — Report quality901902- Markdown and HTML agree.903- HTML is offline, semantic, accessible, responsive, print-ready, and safely escaped.904- Evidence, limitations, approvals, and unresolved items are visible.905906## Failure handling907908If the input lacks a technical mechanism, remain at CP-0 and request the material facts.909If the user withholds a company name, use an approved anonymous label.910If the search is unavailable, provide a preparation framework and mark patentability screening blocked.911If prior-art dates are unclear, do not issue a novelty screen.912If the invention is not reproducible, return to Block 2 and define experiments or disclosure needs.913If a design-around concept fails requirements, recommend product redesign or no filing.914If ownership or public disclosure is uncertain, escalate promptly to counsel.915If fewer concepts exist than a template suggests, report the defensible set rather than fabricate.916917## Reference and authority discipline918919The source package names several invention-mining and patent-practice books, but does not bundle their text.920Do not claim to have applied a named book unless it was actually accessed and reviewed.921922For execution, prioritize:923924- current official patent-office examination guidance;925- current statutes, rules, and relevant primary legal authority;926- WIPO and standards-organization materials where applicable;927- reviewed engineering and scientific evidence;928- qualified local patent counsel.929930## Final response931932State:933934- approved scenario, mode, entity label, and technical workstreams;935- Blocks and checkpoints completed;936- number of problem, concept, reference, and innovation records;937- strongest evidence-backed differentiation;938- most important technical, legal, disclosure, or search gap;939- dispositions and six-month priority actions;940- report path when created;941- exact counsel, engineering, ownership, confidentiality, or standards review required.